RFQ RD-3-67 AND(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001400010005-1
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
May 15, 2001
Sequence Number:
5
Case Number:
Publication Date:
November 4, 1966
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 138.05 KB |
Body:
Approved For, ReleaseZ00`T/CU-8CJi001400010005-1
4 November 1966
DECLASS REVIEW BY NIMA / DoD'
25X1A .
25X1A
fort uavis Station
Washington., D. C. 20020
SUBJECT: RFQ RD-3-67 AND
In response to Request for Proposal No. RD-3-67 is
pleased to submit its proposal for a.Coloir Sheet i m Dryer MR
-In-accordance with your request, we are submitting herewith separate
cost pro h h for Sheet Film Dryer and the Color Paper
Dryer of espectively.
Since both programs present many similar problems, it is possible, by
combining them, to achieve certain economies primarily due to the
elimination of areas where there may be duplication of effort.
Accordingly, we are also presentin for your consideration, a cost
quotation in the amount of which is predicated on _
conducting both programs simu aneously.
Because of the developmental nature of the work, we believe that
a Cost Type Contract would be the most equitable for both parties.
However, we would be agreeable to the.. application of some form of
incentive arrangement, if you so desire.
25X1A
Our proposal is predicated on the incorporation of the attached terms
and conditions in any resultant contractual instrument.
In accordance with your request, we are returning herewith your letter
of 27 September 1966 and Specification No. DB-1001 (1 copy)., Development
Objectives - Color Sheet Film Dryer (2 copies), and Development Objectives -
Color Print Dryer (2 copies).
Approved For Rff~>3
GROUP I
Excluded from automatic downgrading
and declassification
7,8 B04747A001400010Q05-1
CONFIDENTIAL
25X1A
25X1A
25X1A
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01400010005-1
if you need any additional information, please don't hesitate to
contact or technical matters or
Very truly yours,
WJL/HAM:jtc
r ma o ra ua nature.
fr: u.tc c CAtiJ.
PQUP I
E?CBuded from autontet.ic downgrading
and declassification
Approved For ReLe s . 5lJ3fj P78BO4747AO0140001 Q005-1
Approved For Release 2001/08/13 : CIA-RDP78B04747A001400010005-1
PROPOSED ~'3 NTRACTUAL
"r .RMS AND CONDITIONS
Any contract resulting from this proposal shall contain-mutually
acceptable terms and conditions compatible with a Cost-Plus-Fixed-
Fee Type contract.
This proposal is valid for a period of sixty (60) days after which
~eserves the right to make adjustments in order to reflect
changed conditions.
F.O.B. point for costing purposes is Bedford, Massachusetts. How-
ever, arrangements can be made to prepay shipping costs if the customer'
Q
desires.
Preliminary Inspection and Acceptance point is at contractor's plant.
Final Inspection and Acceptance point is at destination in the
Washington, D. C. area.
This cost proposal is based upon the inclusion in any ensuing contract
of the necessary authorization to utilize certain Government facilities
in our possession listed under Facilities Contract AF 33(657)-8886 on a
no-charge-for-use, non-interference basis with the primary mission of
the aforesaid facilities contract. Please be advised that?.the con-
templated use of said facilities will not conflict with other contracts
being performed concurrently and the facilities have been provided to
Approved For Release 2001/08/13 : CIA-RDP78B04747A001400010005-1
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01400010005-1
TERMS AND CONDITIONS Page 2
^for an indefinite period. The Government agency having
cognizance over the administration of the aforesaid facilities
contract is the Defense Contract Administration Services Agency,
eBoston, Massachusetts. The original acquisition value of the
facilities listed on the contract is approximately
If the facilities' cannot be made available on a no-charge basis,
then the Fixed Fee set forth above should be increased by one-half
of one percent of the proposed direct labor dollars.
The Defense Contract Administrative Services Agency has approved
-procurement procedures and has authorized-to place cost
rei&ibursement type subcontracts up to,$10,000.00 and fixed price
subcontracts in any amount without the specific approval of the
Administrative Contracting Officer on contracts under his juris-
diction and cognizance. It is requested that any "Subcontracts"
article intended to be included in the proposed contract adopt
these limits.
We contemplate payment of no royalties in connection with this
Approved For Release 2001/08/13: CIA-RDP78BO4747AGO1400010605-1
Approved For Release 2001 1f-b' j -RDP78B04747A001400010005-1
Next 3 Page(s) In Document Exempt
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01400010005-1