MONTHLY CONTRACT STATUS REPORT #6 ADVANCED LIGHT TABLES PERIOD: 1 DECEMBER 1965 TO 31 DECEMBER 1965

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001400040030-0
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 8, 2002
Sequence Number: 
30
Case Number: 
Publication Date: 
January 21, 1966
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001400040030-0.pdf97.14 KB
Body: 
Approved Fi elease 2002/06/17: C T A T I NTL STATINTL STATINTL TO: Customer ILLEGIB STATINTL Period: 1 December 1965 to 31 December 1965 DATE: 21 January 1966 SUBJECT: Monthly Contract Status Report #6 Advanced Light 'Tables Parts and vendor is are being purchased on Tables If 1&2. Pattern 1. Objective: To design and develop three Advanced Light Tables 2. Summary of Work Performed During the Reporting Period: and casting orders were placed on 17 December 1965 with anticipated delivery February 1966. All other parts have been sent to the shops for fabrication on the wo units. A trip was made tol on 22 December 1965 #3 design is running ahead of schedule. Other than fiscal and delivery problems, there are no insurmountable engineering problems on this project. is running smoothly and parts are being turned out. Progress on Table operations on the castings. ALL castings for Tables #1 & 2 will be machined simultaneously. 4. Analysis of Work Program Covering Reporting Period: Progress on Tables #1&2 is as rapid as can be expected. Shop work submuted. It is hoped that this can be picked up during the machining The project is lagging. approximately two weeks behind the last schedule Work will commence on 3 January 1966 on the detail design of the tracking light source positioning mechanism and traverse mechanism. It is anticipated that this engineering package will be complete by 25 February 1966. 3. Work Schedule Conformance machining drawings, component mounting plate and assembly drawing. to co-ordinate on the final design of the Micrometer Microscope Movements. Work is proceeding on the units with an anticipated delivery of 15 April 1966. Design work has started to Table #3. It has been determined that most of the design completed on Table # 2 can be used in Table #3 with the exception of the principle casting and Declass Review by NIMA / DoD Approved For Release 2002/06/17 CIA-RDP78BO4747AO01400040030-0 f STATINTL Approved Faelease 2002/06/17 : CIA- Monthly Contract Status Report #6(Cont'd) period. Page 2 There have been no changes in key personnel during this reporting 5. Changes in Key Personnel: 6. Trips, Meetings and Special Conferences: STATINTL Two trips were made to the plant by the COTR during the reporting period.. Techhmn of the contract were discussed with initial design approval of the precision micrometer microscope movements. 7. Plans for the Next Reporting Period: 1. Continuation of parts fabrication for Tables # 1, 2, &3. 2. Continuation of tracking light source design on Table #3. 3. Completion of assembled layout drawing of Table #3. Approved For Release 2002/06/17 : CIA-RDP78BO4747AO01400040030-0