Approve&Epr ReIGO
1DEIN;
Contracting Officer
Subject: Contract
Gentlemen:
Enclosed are three (3) copies of the Monthly Status Report
for subject Contract, covering the period from October 1,
1965 through October 31, 1965.
If there are any questions concerning the report, please
contact the undersigned.
L1,747A001400040033-7
November 10, 1965
Very truly yours,
Contract Administration
Enclosures: 3 as stated
Declass Review by NIMA / DoD
GROUP
EXCLUDED FROM AUTOMATIC DOWNGRAOINO
AND DECLASSIFICATION
THU from:men? tonfaTns Informaffort
'affecting the national defense of the United
States, -within the meaning of the Espionage
LAWS, Sections 793 and 794,
the trartt,min or revelation of which
in any manner t:-) an unauthorized person
Appco4F4DEIGALA_RDpiagbo4ty4Adbrility.040033_7
25X1A
25X1A
25X1A
25X1A
25X1A
TO:
FROM:
Approved F.Qr Release 2002/06/17 : Cl
Eller
A-RDP781304747A001400040033-7
81.)3.7VCTI Monthly Contract Status Report No. 4.
Development of Advanced Light Tables
1 October to 31 October. 1965
and
The purpose of this project is to design and develop three
Tables for photo interpretation use.
k Performed
ix Period:
Major engineering problems solved during the reporting period
have consisted of a suitable microscope movement for Tables # 2 & 3
and the basic design of the tracking light source positioning mechanism
and source adjustment mechanism. Considerable time has been spent
In checking and revising drawings on Tables 0 Z & 3 in addition to final
engineering checking of Table 0 I prior to febricstion, The customers
25X1A representative visited th lent on ZS October 1965 to
review the design to date. iwo nesign problems were discussed:
(1) The Amount of overhang on Table it 3 with the tracking light
source positioning movement Installed is I 3/4" beyond the rear of the
base casting.
(Z) The film hold-down bars on Tata* # 2 t. 3 interfere with the
microscope carriage when in the raised position.
The customers representative stated that the 3 3/4" overhang on
Table # 3 was permissible. The customers representative also recommend-
ed a tenative solution to the hold-down bar problem. The solution
recommended was to add a microswiteh on the .:11: -X carriage rails. When
the microscope movement trips the microswitch on either end of Table #
& 3, the hold-down bars will be automatically depressed and the clutches
de..energieed allowing for no film transport during this period. This fix
I. suitable but a much better method of film hold-down would be to adapt
a hold-down plate, either electrically or raechanica.Uy activated, to the
microscope carriage. This addition is beyond the scope of this project.
3. Work Schedule Conformance:
A revised work schedule was spelled out in the September progress
It is still anticipated that this delivery schedule can be met. AU
are being directed toward meeting this schedule by
**ibis that sub contracts on the castings and microscope micrometer
eats may cause delay but this is not known yet.
25X1A
Approved For Release 2002/06/17 : CIA-RDP78604747A001400040033-7
25X1A
Approved For Release 2002/06/17:
ct
IA-RDP781304747A001400040033-7
4. nalys of_ Prgrsm Ccrverinft the lt.port4nt Period:
Considerable progress has been made during the reporting pt
in solving the two major engineering problems existing on the projet
I) Finding a suitable micrometer microscope movement
Z) Designing a suitable tracking light source and positioning
mechanism
talons to the above problems have been de
design is under way. Engineering checking of detail
25X1A S. Chaves in Key Personnel;
No chances have been made in k
25X1A
25X1A
inlet* and detail
lugs ii progressing.
v Personnel during the re
Oc o
mentio
7.
representative visited the
During this vialt, several design problems previously
resolved.
On
e N
Pt d
gineering design chscking will be completed on Tab I and
bmitted to the_aheinianr_fshricalion. I is anticipated that *
will be let tc sometime in the latter part of
mber for the purunarce-ox-rwo.n-wrerrceter microscope movements.
nginegring checking and changes will be completed on Lied Table 11
by ZS November at which time parts will, be sent to the shop for fabri-
cation. Detail design will start on the tracking light source and its
attendent transport and positioning mechanism by 10 November 1965.