CONTRACT(Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001400040033-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 8, 2002
Sequence Number: 
33
Case Number: 
Publication Date: 
November 10, 1965
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001400040033-7.pdf199.96 KB
Body: 
Approve&Epr ReIGO 1DEIN; Contracting Officer Subject: Contract Gentlemen: Enclosed are three (3) copies of the Monthly Status Report for subject Contract, covering the period from October 1, 1965 through October 31, 1965. If there are any questions concerning the report, please contact the undersigned. L1,747A001400040033-7 November 10, 1965 Very truly yours, Contract Administration Enclosures: 3 as stated Declass Review by NIMA / DoD GROUP EXCLUDED FROM AUTOMATIC DOWNGRAOINO AND DECLASSIFICATION THU from:men? tonfaTns Informaffort 'affecting the national defense of the United States, -within the meaning of the Espionage LAWS, Sections 793 and 794, the trartt,min or revelation of which in any manner t:-) an unauthorized person Appco4F4DEIGALA_RDpiagbo4ty4Adbrility.040033_7 25X1A 25X1A 25X1A 25X1A 25X1A TO: FROM: Approved F.Qr Release 2002/06/17 : Cl Eller A-RDP781304747A001400040033-7 81.)3.7VCTI Monthly Contract Status Report No. 4. Development of Advanced Light Tables 1 October to 31 October. 1965 and The purpose of this project is to design and develop three Tables for photo interpretation use. k Performed ix Period: Major engineering problems solved during the reporting period have consisted of a suitable microscope movement for Tables # 2 & 3 and the basic design of the tracking light source positioning mechanism and source adjustment mechanism. Considerable time has been spent In checking and revising drawings on Tables 0 Z & 3 in addition to final engineering checking of Table 0 I prior to febricstion, The customers 25X1A representative visited th lent on ZS October 1965 to review the design to date. iwo nesign problems were discussed: (1) The Amount of overhang on Table it 3 with the tracking light source positioning movement Installed is I 3/4" beyond the rear of the base casting. (Z) The film hold-down bars on Tata* # 2 t. 3 interfere with the microscope carriage when in the raised position. The customers representative stated that the 3 3/4" overhang on Table # 3 was permissible. The customers representative also recommend- ed a tenative solution to the hold-down bar problem. The solution recommended was to add a microswiteh on the .:11: -X carriage rails. When the microscope movement trips the microswitch on either end of Table # & 3, the hold-down bars will be automatically depressed and the clutches de..energieed allowing for no film transport during this period. This fix I. suitable but a much better method of film hold-down would be to adapt a hold-down plate, either electrically or raechanica.Uy activated, to the microscope carriage. This addition is beyond the scope of this project. 3. Work Schedule Conformance: A revised work schedule was spelled out in the September progress It is still anticipated that this delivery schedule can be met. AU are being directed toward meeting this schedule by **ibis that sub contracts on the castings and microscope micrometer eats may cause delay but this is not known yet. 25X1A Approved For Release 2002/06/17 : CIA-RDP78604747A001400040033-7 25X1A Approved For Release 2002/06/17: ct IA-RDP781304747A001400040033-7 4. nalys of_ Prgrsm Ccrverinft the lt.port4nt Period: Considerable progress has been made during the reporting pt in solving the two major engineering problems existing on the projet I) Finding a suitable micrometer microscope movement Z) Designing a suitable tracking light source and positioning mechanism talons to the above problems have been de design is under way. Engineering checking of detail 25X1A S. Chaves in Key Personnel; No chances have been made in k 25X1A 25X1A inlet* and detail lugs ii progressing. v Personnel during the re Oc o mentio 7. representative visited the During this vialt, several design problems previously resolved. On e N Pt d gineering design chscking will be completed on Tab I and bmitted to the_aheinianr_fshricalion. I is anticipated that * will be let tc sometime in the latter part of mber for the purunarce-ox-rwo.n-wrerrceter microscope movements. nginegring checking and changes will be completed on Lied Table 11 by ZS November at which time parts will, be sent to the shop for fabri- cation. Detail design will start on the tracking light source and its attendent transport and positioning mechanism by 10 November 1965. Approved For Release 2002/06/17 : CIA-RDP78604747A001400040033-7