INTERFEROMETER TEST AND RETROFIT PROGRAM 405AM AND 405B - CHIP COMPARATOR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001500030035-5
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 29, 2002
Sequence Number: 
35
Case Number: 
Publication Date: 
October 31, 1964
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001500030035-5.pdf90.95 KB
Body: 
Approved Foelease 2002106/17- : CIA-R78B040001500030035-5 25X1A 25X1A 0 25X1A 25X1A 25X1A 9 25X1A 0 #1263 Subject: Interferometer Test and Retrofit Program 405AM and 405B - Chip Comparator In accordance with the visit to our facility by Messrs. the following decisions were made concerning the stability problem with the interferometerson subject equipment. 1) has completed its engineering evalu- ation of necessary changes to the interferometersto increase their stability. is presently in process of modifying and testing five (5) production units to determine acceptance on a production basis. 2) Modifications of the 405B equipment at your facility will not be accomplished until the below described test pro- gram is completed. 3) The 405AM, presently in our facility will be used as a "test bed" to verify that the interferometer changes ful- fill your requirements. 4) will remove two (2) interferometers (one already in our plant) from a 405B in your facility, mod- ify same, and install on the 405AM "test bed". It is expected that this effort will be completed on the 405AM by 2 December 1966. 5) After initial checkout, 0 will be notified that the test program is underway on the 405AM for a possible visit to observe testing activities. DECLASS REVIEW by NIMA/DOD P40UP I E;;CLUDFD FRO!,; AUTTAi;11C D07fi:C9AD1i:C AND DECLASSIFICATION oPrFFwr/gyA &r fW@mmc2A 96/r&7EARCI4-BQPo7AM474ZMI%15Q W QQa5n 25X1A 25X1A 25X1A- 25X1A 25X1A 25X1A ? 0 Fo,elease 2002/06/17: C1A-RDP78B047l001500030035-5 0 Page 2 6) The test program is expected to last approximately one month, therefore, shortly after 1 January 1967, will inform that program is complete and that activ- ities should be immediately initiated to modify all 405B's. The above dates are given as our best estimate to com- plete the phases described. It is quite possible that there may be delays in procurement of necessary parts, installation and/or testing phases. I will do all in its power to adhere to this schedule. 25X1A At this time, it is not felt necessary to obtain con- tractual coverage for the above activities. 25X1A is making the assumption that this activity is part of the 405B program and that the 405AM is only used as a "test bed" to verify the interferometer changes. When we have completed our test program and verified the changes, contractual coverage will be necessary to modify the 405AM and to retrofit the interferometers to the new configurations. Budget figures for modifications on the 405AM are Exact 25X1A figures will be provided as soon as possible after 2 December. The remaining 405B equipments at your facility will be left in their present condition until the test program is completed. Upon final decision, the retrofits will take a 3 to 4 month period to remove the interferometers, make the necessary changes, re-install, and retest, indicating avail- ability of the 405B's as April - May 1967, unless a concurrent program is decided upon. If we can provide any additional information, or if you wish changes on the above described program, please contact us at your earliest convenience. Very truly yours, 25X1A c77uv 1 F;:C1 Flo FC Fr ;r au?~'1Ai-1a G tCLrs ~~F7L:?i 10i: Approved For Release 2002/06/17 : CIA-RDP78BO4747AO01500030035-5