PROGRESS REPORT NO. 8 PHASE II REPORT PERIOD - 2/27/67 - 4/2/67 MULTI-PURPOSE DATA BLOCK READER

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001500040053-4
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
7
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 31, 2001
Sequence Number: 
53
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001500040053-4.pdf107.49 KB
Body: 
Approved Forwase 2002/06/17: CIA-RDP78B0474'`0150004005 -4V/y1 STATINTL PROGRESS REPORT NO. 8 PHASE II Report Period - 2/27/67 - 4/2/67 STATINTL Submitted by: .Program Manager DECLASS REVIEW by NIMA/DOD Approved For Release 2002/06/17 : CIA-RDP78BO4747AO01500040053-4 Approved For?ease 2002/06/17 : CIA-RDP78B04741001500040053-4 A. CURRENT STATUS Unit No. 1 - Tray wiring and panel wiring have been completed. Unit No. 2 - Tray wiring and panel have been started. As per customer agreement, an optical comparator was bought to complete the transport assembly on schedule. System debugging has been started on schedule, but it is being hindered by the lack of film for all format types. B. PROJECTED WORK 1) Completion of transport debugging 2) Completion of electrical assembly debugging 3) Completion of acceptance testing 4) Ship Unit No. 1 Unit No. 2: 1) Complete panel and tray wiring 2) Complete optical assembly 3) Complete electrical assembly Start work on technical manuals. C. ACTION ITEM 1) To date the following formats have been received from the customer: Approved For Release 2002/06/17 CIA-RDP78B04747A001500040053-4 Approved For.ease 2002/06/17 : CIA-RDP78BO4741001500040053-4 Ref. Phase I Report No. SME-AL-8 Fig No. Condition 3 Poor quality dots 10 All "ones" 11 Good quality FCIC Supplied 1 Good quality 2 Good quality ECP # 2 Format 12 Data content not suitable for testing 2) The following formats have not been received by FCIC: Figure 4 Figure 7 Figure 5 Figure 8 Figure 6 Figure 9 Testing with "Live" film will begin on 4-22-67. Unless the six formats listed under C-2 are received by then, the part of the tests pertaining to them will not be performed before the unit is shipped. Similarly, only partial tests can be performed with the film supplied for format 12. If it is desirable to test the omitted formats at a later date, at the customers facilities, an increase in contract price is anticipated. Approved For Release 2002/06/17 : CIA-RDP78BO4747AO01500040053-4 STATINTL Approved For Release 2002/06/17 : CIA-RDP78BO4747AO01500040053-4 Approved For Release 2002/06/17 : CIA-RDP78BO4747AO01500040053-4 Approved For Release 2002/06/17 : CIA-RDP78B04747A001500040053-4 PROGRESS REPORT NO. 6 PHASE II Report Period - 1/1/67 - 1/31/67 Submitted by: Program Manager STATINTL Approved For Release 2002/06/17 : CIA-RDP78B04747A001500040053-4 Approved ? Release 2002/06/17: CIA-RDP78BO07A001500040053-4 A. CURRENT STATUS All connectors have been received, although one week late. The succeeding critical tray wiring activity of six weeks has started and is expected to be completed within five weeks, thereby absorbing any other potential slippage. No problem is anticipated since there is a technician activity where over- time may be scheduled as required. The two rewinders have been received two weeks ahead of schedule. Fabrication of the transports for Units No. 1 and No. 2 have been completed on schedule. Panel wiring on Unit No. 1 has started on schedule. B. PROJECTED WORK Unit No. 1 - Tray and panel wiring will be completed. Electrical assembly will be completed. Unit No. 2 - Tray wiring will start A test film is required from the Customer by March 24th if the present STATINTL Fairchild delivery schedule is to be complied with. This date will be the final debugging period for Unit No. 1 in preparation for Acceptance Testing. Approved For Release 2002/06/17 : CIA-RDP78B04747A001500040053-4 STATINTL Approved For Release 2002/06/17 : CIA-RDP78BO4747AO01500040053-4 Approved For Release 2002/06/17 : CIA-RDP78BO4747AO01500040053-4