DEAR SIR:

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001500040057-0
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 31, 2001
Sequence Number: 
57
Case Number: 
Publication Date: 
December 19, 1966
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001500040057-0.pdf82.36 KB
Body: 
Approved For ease 2002/06/17: CIA-RDP78B0474S01500040057-0 CONFIDENTIAL 19 December 1966 Ref: LJC 599-1674 25X1A Post Office Box 8043 Southwest Station Washington, D. C. 20024 Contracting Officer 25X1A In accordance with the terms of the contract,.: we are transmitting herewith two (2) copies of Progress Report No. 4, Phase II, which covers the period November 1, 1966, through November 30, 1966. Very truly yours, sru. SINNED BY 25X1A Contracts' 25X1A LJC/cc encls. (2) 3cc: Progress Report No. 4, Phase II, to: Post ice Box 8031 Southwest Station Washington, D. C. 20024 DECLASS REVIEW by NIMA/DOD "This Document contains information affecting the National Defense of the United States wit-';'.n the meaning of the Espiona=~e Title 18, U.S.C., Section 79~- -.nd 794, the transmission or rovelation of which. f1AL1 1'T EXCLUDED FROM AUTOMATIC REGRAIIi G: OLD Dia 5200.10 150004005 7-dI0fS.NOT, APPLY FIDNIAE8B04747A00 person is:prot bited bt law." Approved or Release - - PROGRESS REPORT NO. 4 PHASE II Report Period - 11/1/66 - 11/30/66 Submitted By: Program Manager 25X1A, Approved For Release 2002/06/17 : CIA-RDP78B04747A001500040057-0 Approved For ease 2002/06/17 : CIA-RDP78B0474701500040057-0 A. CURRENT STATUS A new PERT chart was prepared to include the additional efforts required to accommodate ECP No. 2, which was received 11/22/66. The delivery dates of each reader have been extended two months. Transport detailing was completed. Cabinets, read heads, glass, mirrors and printer No. 2 were received. Fabrication of logic cards and the transport base plate were completed. Logic design and the revised wiring list were not completed as projected in the October Progress Report because of ECP rescheduling. B. PROJECTED WORK Optical assembly No. 1 will be completed. Tray wiring will be started. Read amplifier card fabrication, supplementary logic design and revised wiring list will be completed. Connectors and memories will be received. 25X1A Approved For Release 2002/06/17 : CIA-RDP78B04747A001500040057-0