DEAR SIR:

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001500040059-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 31, 2001
Sequence Number: 
59
Case Number: 
Publication Date: 
October 17, 1966
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001500040059-8.pdf81.02 KB
Body: 
Approved For Release 2002/06/17 : CIA-RDP78B04747 001500040059-8 17 October 1966 Ref: LJC 563-1674 Post Office Box 8043 Southwest Station Washington, D. C. 20024 25X1 A Attention: 25X1A Dear Sir: Contracting Officer In accordance with the terms of the contract, we are transmitting herewith two (2) copies of Progress Report No. 2, Phase II, which covers the period September 1, 1966, through September 30, 1966. Very truly yours, ORIG1 SIGNED BY 5X1A LJC/cc encls. (2) DECLASS REVIEW by NIMA/DOD 3cc: Progress Report No. 2, Phase U. to: Post Office Box 8031 Southwest Station Washington, D. C. 20024 3- information 13-onal Dei"e se of ,iv 18, RJR= ' ~:~ ca bin of which g 1Lja to an unauthorized j i 25X1A CIA-RDP78B04747A001500040059-8 pt.r on is prohibitA0plF v For Release 2002/06/17 Approved For ease 2002/06/17: CIA-RDP78B0474771500040059-8 25X1A 15 October 1966 PROGRESS REPORT NO. 2 PHASE II Report Period 9/1 /66 - 9/30/66 Submitted By: Program Manager Approved For Release 2002/06/17 : CIA-RDP78B04747A001500040059-8 Approved ForGlease 2002/06/17: CIA-RDP78B0474#01500040059-8 A. CURRENT STATUS During September, card fabrication and transport fabrication were started on schedule. An ECP, covering format changes, excess wander sensing, off-line rewinder and manual data input to magnetic tape was submitted. It is anticipated that approval of the ECP will be forthcoming prior to October 15, 1966, so that costs and delays will not increase beyond those quoted. If approval is not forthcoming by November 1, 1966, rework of existing equipment may be necessary. FCIC delivery schedule is within the contract requirements. B. PROJECTED WORK PC cards and flatpacks will be received. Supplementary logic and transport designs will be completed. Fabrication of the base plate will be completed. Revised wiring list will be started. Approved For Release 2002/06/17 : CIA-RDP78B04747A001500040059-8