MONTHLY PROGRESS REPORT, (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001600020092-2
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 19, 2000
Sequence Number: 
92
Case Number: 
Publication Date: 
March 5, 1964
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001600020092-2.pdf103.56 KB
Body: 
Approved For Release S00/06/07: CIA-RDP78BO4747AO016001W0092-2 Memorandum DECLASSIFICATION REVIEW BY NIMA / DoD 1094 STATOTHR TO: contracting Officer FROM: Project Engineer, Ea@ATOTHR SUBJECT: Monthly Progress Repor t, Contract- DATE: 5 March 1964 A. General The progress report is seperated into several sections, the first of which is a percentage summary of the schedule. This is followed by a statement on the progress and remarks on work completed, work in process and planned work effort. Finally a table showing each task and the percentage complete is supplied. B. Schedule Ma1er Project Tasks Percent Complete Percent Required By Project Schedule I System Engineering 100% 100% II Subsystem Design 90% 100% III Construction and/or Purchasing arld Assembly 25% 50% IV Testing and Debugging 10% 25% V Final Inspection 0%0 0% C. Summary of Progress 1. Electronic Control. The major effort this month has been centered aroung the testing of the special Electronic circuits and checking the cabinet design, Some of the circuits have been released for manufacture and all of the cabinet has been released. 2. Coordinatograph The table and related castings are still under fabrication. All castings have been machined and assembly starts in the first weeks of March. Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020092-2 gPou t FgIielease 00/06/07 : CIA-RDP78BO4747AO0160 0092-2 Page 2 Planned Work Effort the aeneral schedule is as follows: March 1. Specify temperature sensing system 2. Use the servo test apparatus 3. Wire more electronic racks 4. Test electronic racks A ril 1 . Test servo apparatus 2. Test cooling system 3. Test electronic racks E. Detailed Progress Report Detailed estimates of progress on all project tasks are listed in Table I. The following is an explanation of the progress approximations listed. 0% Tasks not started 10% Tasks started but not 25% accomplished 25% Tasks over 25% accomplished but less than 50% accomplished 50% Tasks over 50% accomplished but less than 75% accomplished 75% Tasks over 75% accomplished but less than 100% accomplished 100% Tasks completed connector that will be used to terminate the lines at the- cabinet. STATOTHR for special functions. TheM connector lists bits zero to 35. Where in the_ number and upon what connector pins will the X bits be, the X sign bit, the Y bits, the Y sign bit, and the remaining special function bits. Also, what is the specific cable Question on Computer Interface s-rararaR Thc~, will supply= a 30 bit word consisting of a 10 bit X dimension plus a sign and a 10 bit Y dimension plus a sign. This is a total of 22 bits. The other 8 bits will be used TWT/bd Approved For Release 2000/06/07 : CIA RDP78BO4747AO01600020092-2 ILLEGIB Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020092-2 Next 1 Page(s) In Document Exempt Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020092-2 Approved For Release MO/06/07: CIA-RDP78BO4747AO0160 092-2 roject a risks Lro ress Drt on 1'rojF ct f c~si