TEST SPECIFICATION CENTRAL CHEMICAL MIX SYSTEM I-4324
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001800070011-4
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
8
Document Creation Date:
December 28, 2016
Document Release Date:
May 9, 2001
Sequence Number:
11
Case Number:
Publication Date:
December 7, 1962
Content Type:
SUMMARY
File:
Attachment | Size |
---|---|
![]() | 498.15 KB |
Body:
Approved For se 2001/08/13: CIA-RDP78BO4747 8000700
TEST SPBCIEIGATI41~
CzNTML GHEMIm um SYSTEM
1-4324
7 D,csmbet 1962
DECLASS REVIEW by NIMA/DOD
Approved For Release 2001/08/13: CIA-RDP78BO4747AO01800070011-4
Approved For lase 2001/08/13: CIA-RDP78B04747M1800070011-4
!(WORD
This acceptance test shall be executed by qualified personnel of
the Engineering Department, initialing the proper operation of each step.
Any malfunctions or difficulties will be recorded on a separate sheet
and the step rechecked for proper operation. (Describe malfunction on
reverse side of sheet.)
Upon completion, the completed document shall be returned to the
Engineering Department*
Follow test procedures as outlined.
Approved For Release 2001/08/13 : CIA-RDP78B04747A001800070011-4
Approved For'ase 2001/08/13 : CIA-RDP78B047418000700
PART I
Preparations
1. Thoroughly clean all oompone a.
2. Thoroughly clean the area around components.
3. Flush all tanks and remove debris from tank
bottoms.
Mechanical Attachments:
Physical Conne-~tiona:
Tanks
Piping
Piping Circuitry
Facilities
Mobile Unit (where applicable)
Electrical Fittings
Conduit Supports
PART II
Preliminary Operational Test
1. Inspect all tank welds, seams and fittings for
leaks.
2. Check operation of all manually operated valves.
3. Individually ohs h all electrical circuits and
ooerte+osls on console for proper operation.
y/,
Approved For fftase 2001/08/13: CIA-RDP78B04747 18000700
Deionized 450
Deionized 680
Deionized 14541
Filtered Ambient
Filtered 45?
Filtered 68?
Filtered 145?
2. Check operation of mixer motor.
3. Transfer to storage tanks (fill completely).
4. Regulate nitrogen pressure to 3 PSI (as observed
on gauge) and pressurize the system.
. a . Operate nitrogen exhaust system.
1. Fill mix tank sequentially using the various water supplies a
b. Recharge tank system with nitrogen.
5. Recirculate contents of each storage tank
through the heat exchanger and observe
temperature of solution.
? a. Observe operation of level control
indicators at console.
b. Observe operation of level control
indicators at remote location.
7. Recirculate tank solution through filter, area
use lines and beat exchanger,
a. Record pressure as read on gauge at 'fem.
/f~vdiFFar Release 2004L08/13 : CIA-RDP78B0474QO?800070011-4 ?
0
Approved For F ase 2001/08/13: CIA-RDP78BO4747 1800070011-4
b. Observe operation of level indicators at
console.
c. Observe operation of level indicators at
remote location.
8. Open drain valve and check operation of level
indicators at console.
At remote location.
9. Pill portable mix unit.
Check mixer motor.
Check pump.
Attach to additive system and charge tank.
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01800070011-4 w
se 2001/08/13 : CIA-RDP78B04747=1800070011-4
PAWN
Operational Accepianos Test Procedure:
1. Check to sae all tanks are filled with water.
2. Operate nitrogen pressure system.
3. Operate solution distribution system for 6 hours,
recording temperature on the reorder at console.
4. Record tank temperatures and pressures of each system
PART V
Shut Down Procedure:.
1. Drain and flush all tanks and lines.
2. Remove all filter cart ridges.
3. Replace filter cartridges with new 10-micron.
cartridges.
Approved For Release 2001/08/13 CIA-RDP78?0`474'7A0 10 80007 0
Approved For Release 2001/08/13 :CIA-RDP78B04747A00 0 K2
Xj%P,~~ T
F I L:.
/mc-l2-62
2T December 1962
l otc xemiee1 Solutions Laboratory -
STATINTL 1. luring the past two weeks C and aers. -
have me several tours and spent a considerable amount
MU 90,n. over the the aical m system beint installed in
STATINTL pia this time mwW points have been noticed Bch we I STATINTL
M be Corr tad or esplalwd prior to a ,tir the system ms I. inL
satistscto '. It is also felt that certain architectural deli z; and
TL constructions of the r(xm itself amt be corrected in the near future.
2. The folloving list of questions should be answer "yes" if
is to live up to the contracts
a. m tazka have gauges calibrated in
b, flows from filters meet the 80 LPT4 mini re ui remei to
C. Do ye have a 3/k' vas line from storage tangy?
d. Do we have a 1" N2 line to storage tanJ s b
e. Do we have a 2" pipe in heat ebaes?
f. Art the safety valves on all storage
dawn hoses ?
set forth in DMJM memo of 30 ALV ust 1962.
i. Is there provisions for batch date labels
Are all electrical outlets, motor switches and the coxl$
Try to r- proo f'T
k. Are all cannot and pall boxes corrosion resistant?
1. Are all filters in such a position to make filters chain
c 'lenient ;
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01800070011-4
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01800070011-4
3. The 1?ol
corrected in the
ch feel should be
bey are susceptible
u the type of that cters and_ a.
c. All lines &bould be
d. ?Uxe on mix tanks side
drain lines.
Rom 4B not
on back of stoc,? tank is broken.
Chief, Production Services Division,
emn
to
at a lover lever.. Changes on
Id be relocated to the side of
of mix
ible.
scele to ladicate
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01800070011-4