TEST SPECIFICATION CENTRAL CHEMICAL MIX SYSTEM I-4324

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001800070011-4
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
8
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 9, 2001
Sequence Number: 
11
Case Number: 
Publication Date: 
December 7, 1962
Content Type: 
SUMMARY
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001800070011-4.pdf498.15 KB
Body: 
Approved For se 2001/08/13: CIA-RDP78BO4747 8000700 TEST SPBCIEIGATI41~ CzNTML GHEMIm um SYSTEM 1-4324 7 D,csmbet 1962 DECLASS REVIEW by NIMA/DOD Approved For Release 2001/08/13: CIA-RDP78BO4747AO01800070011-4 Approved For lase 2001/08/13: CIA-RDP78B04747M1800070011-4 !(WORD This acceptance test shall be executed by qualified personnel of the Engineering Department, initialing the proper operation of each step. Any malfunctions or difficulties will be recorded on a separate sheet and the step rechecked for proper operation. (Describe malfunction on reverse side of sheet.) Upon completion, the completed document shall be returned to the Engineering Department* Follow test procedures as outlined. Approved For Release 2001/08/13 : CIA-RDP78B04747A001800070011-4 Approved For'ase 2001/08/13 : CIA-RDP78B047418000700 PART I Preparations 1. Thoroughly clean all oompone a. 2. Thoroughly clean the area around components. 3. Flush all tanks and remove debris from tank bottoms. Mechanical Attachments: Physical Conne-~tiona: Tanks Piping Piping Circuitry Facilities Mobile Unit (where applicable) Electrical Fittings Conduit Supports PART II Preliminary Operational Test 1. Inspect all tank welds, seams and fittings for leaks. 2. Check operation of all manually operated valves. 3. Individually ohs h all electrical circuits and ooerte+osls on console for proper operation. y/, Approved For fftase 2001/08/13: CIA-RDP78B04747 18000700 Deionized 450 Deionized 680 Deionized 14541 Filtered Ambient Filtered 45? Filtered 68? Filtered 145? 2. Check operation of mixer motor. 3. Transfer to storage tanks (fill completely). 4. Regulate nitrogen pressure to 3 PSI (as observed on gauge) and pressurize the system. . a . Operate nitrogen exhaust system. 1. Fill mix tank sequentially using the various water supplies a b. Recharge tank system with nitrogen. 5. Recirculate contents of each storage tank through the heat exchanger and observe temperature of solution. ? a. Observe operation of level control indicators at console. b. Observe operation of level control indicators at remote location. 7. Recirculate tank solution through filter, area use lines and beat exchanger, a. Record pressure as read on gauge at 'fem. /f~vdiFFar Release 2004L08/13 : CIA-RDP78B0474QO?800070011-4 ? 0 Approved For F ase 2001/08/13: CIA-RDP78BO4747 1800070011-4 b. Observe operation of level indicators at console. c. Observe operation of level indicators at remote location. 8. Open drain valve and check operation of level indicators at console. At remote location. 9. Pill portable mix unit. Check mixer motor. Check pump. Attach to additive system and charge tank. Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01800070011-4 w se 2001/08/13 : CIA-RDP78B04747=1800070011-4 PAWN Operational Accepianos Test Procedure: 1. Check to sae all tanks are filled with water. 2. Operate nitrogen pressure system. 3. Operate solution distribution system for 6 hours, recording temperature on the reorder at console. 4. Record tank temperatures and pressures of each system PART V Shut Down Procedure:. 1. Drain and flush all tanks and lines. 2. Remove all filter cart ridges. 3. Replace filter cartridges with new 10-micron. cartridges. Approved For Release 2001/08/13 CIA-RDP78?0`474'7A0 10 80007 0 Approved For Release 2001/08/13 :CIA-RDP78B04747A00 0 K2 Xj%P,~~ T F I L:. /mc-l2-62 2T December 1962 l otc xemiee1 Solutions Laboratory - STATINTL 1. luring the past two weeks C and aers. - have me several tours and spent a considerable amount MU 90,n. over the the aical m system beint installed in STATINTL pia this time mwW points have been noticed Bch we I STATINTL M be Corr tad or esplalwd prior to a ,tir the system ms I. inL satistscto '. It is also felt that certain architectural deli z; and TL constructions of the r(xm itself amt be corrected in the near future. 2. The folloving list of questions should be answer "yes" if is to live up to the contracts a. m tazka have gauges calibrated in b, flows from filters meet the 80 LPT4 mini re ui remei to C. Do ye have a 3/k' vas line from storage tangy? d. Do we have a 1" N2 line to storage tanJ s b e. Do we have a 2" pipe in heat ebaes? f. Art the safety valves on all storage dawn hoses ? set forth in DMJM memo of 30 ALV ust 1962. i. Is there provisions for batch date labels Are all electrical outlets, motor switches and the coxl$ Try to r- proo f'T k. Are all cannot and pall boxes corrosion resistant? 1. Are all filters in such a position to make filters chain c 'lenient ; Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01800070011-4 Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01800070011-4 3. The 1?ol corrected in the ch feel should be bey are susceptible u the type of that cters and_ a. c. All lines &bould be d. ?Uxe on mix tanks side drain lines. Rom 4B not on back of stoc,? tank is broken. Chief, Production Services Division, emn to at a lover lever.. Changes on Id be relocated to the side of of mix ible. scele to ladicate Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01800070011-4