TRANSMITTAL OF MONTHLY PROGRESS REPORT (NO. 3) PERIOD FEBRUARY 1, 1967 THROUGH FEBRUARY 28, 1967

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001900030083-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
7
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 3, 2002
Sequence Number: 
83
Case Number: 
Publication Date: 
March 7, 1967
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001900030083-8.pdf270.57 KB
Body: 
25X1A ' A.~.~.._.._ Pf_1____ / / /CIA Pf7 0 7A7A 2002 09 0 RD 8B 00190003008 d For March 7, 1967 WOH:jk:150 Post office Box 8031 Southwest Station Washington, D. C. 20024 25X1A Attention: 25X1A Subject: Transmittal of Monthly Progress Report (No. 3) Period February 1, 1967 through February 28, 1967 Enclosure: (a) Six (6) Copies of "Third Monthly Progress Report Covering Period February 1, 1967 through February 28, 1967" Enclosed find six (6) copies of "Third Monthly Progress Report covering Period February 1, 1967 through February 28, 1967" for work 25X1A performed by on Task Order 17 under referenced contract per Specifi- cation No. DB-1001. Very truly yours, 25X1A WOH: jk Enclosures DECLASS REVIEW by NIMA/DOD Approved For Release 009109104 - CIA-RE-11278 04747AO01900030 8 Ej m 25X1 A ApproV For Release 2002/09/04: CIA-RDP7M64747A0019000 0083-8lr THIRD MONTHLY PROGRESS REPORT COVERING PERIOD February 1, 1967 Through February 28, 1967 A. Project Activities During Reporting Period Work was performed on the following tasks: Ib - Worksheet Formats - 90% complete. Drafts of test worksheets were completed and a briefing provided to PAG, CSD, and IPD representatives outlining the worksheet concept and the nature and objective of the test program. A draft memorandum was prepared covering the design and analysis of worksheet alternatives. Attention is directed to certain policy items which must be approved in order to test the worksheet concept. Work was initiated on the test plan. While the investigative work on this task is virtually complete, the worksheet test program phase will be conducted during the coming month. Ic - Product Set - 65% complete. Work continued on the preparation of a position paper describing the printed reports which should be produced by the IIS. Progress on this task has been slower than planned because of the absence of a clear definition of NPIC's role in the overall exploitation program. The position paper should be ready for review by March 13, 1967. Id - Entry and Approval Techniques - 75% complete. A preliminary draft of the memorandum for this task was submitted to IPD for review. A considerable amount of work remains to be done before description and rationale for the selection of entry, edit, and approval technique and equipment alternatives is completed. Ie - Mensuration Investigations - 20% complete. Study was begun of the current mensuration procedures in use to determine the specific inputs, outputs and processing techniques employed. Parameters to be included in the data file were defined. If - Target Prediction Investigations - 90% complete. The draft memorandum for this task was completed and reviewed by IPD and CSD. Ig - Scheduling Procedures - 25% complete. Investigation of scheduling procedures for immediate reporting in the AUi? bi5."ij Appo~teAr Release 2002/09/04: CIA-RDP78B04747A00190030083-8 25X1A Approved'Rir Release 2002/09/04: CIA-RDP78BW-47AO019 3 fe8 J "mission" mode was begun. Ih - Identification of Support Materials - 10% complete. Review of support materials required for immediate readout was begun. Ii - Target Data File Structure - 15% complete. Investigation was started on definition of the objects file. Ii - File Utilization Techniques - 15% complete. This task is being carried out in parallel with Task Ii. Investiga- tion was begun on alternative ways of sectoring the files. Ik - Establishment of Retrieval Techniques - 5% complete. Review of preliminary data on file structure, product set, support material, and TIPS programs was initiated. Il - Establishment of Control Procedures - 0% complete. No activity. Because the output of this task is not essential to system design at this time, activity has been defered until March in order to apply available resources to higher priority tasks. Im - Establish Briefing Board Procedures - 40% complete. Review of current procedures was initiated for preparation of briefing boards, including the generation of graphic and textual content and storage of notes. Percentage of total work completed as of the reporting date is estimated at 24%. B. Planned Activities Task Ib - Worksheet Format The draft memorandum completed in February will be submitted for review and approval of policy items. The worksheet test plan will be completed and tests conducted as approved by NPIC. A draft memo- randum will be prepared to reflect the results of the test program and their impact on the worksheet concept. Task Ic - Product Set The position paper on printed reports will be completed and submitted for review. A concerted effort will be made to define all other AUTOMf, A N D D E. 1 A ", 1 OW +Wdor Release 2002/09/04: CIA-RDP78B 4 3- Appro) For Release 2002/09/04: CIA-RDP78>t4747 1 0 3 3 elements of the product set and to complete the draft memorandum for this subtask. Task Id - Entry and Approval Techniques Additional emphasis will be given to this task to complete a draft memorandum for review and subsequent revision as appropriate. Task Ie - Mensuration Investigations Investigations of mensuration procedures, data volumes, response times, accuracy requirements, and output forms will be completed. A draft memorandum will be prepared covering the results of the investigation and a description of alternatives, recommendations, and rationale for the acquisition, processing, and display of mensuration data. Task If - Target Prediction Investigations Comments by IPD and CSD will be incorporated in a revised draft of the memorandum for this task. Task)Ig - Scheduling Procedures Scheduling procedures for immediate reporting in a continuous mode will be investigated as well as procedures in both the mission and continuous mode for second and third phase reporting. A draft memo- randum will be prepared for this task reporting the results of the investigation, alternative scheduling procedures, recommendations and rationale. Task Ih - Identification of Support Materials Work on this task will continue and a draft memorandum prepared describing the materials and alternative methods, recommendations, and rationale for handling, storage, scheduling, and distribution. Task Ii - Target Data File Structure Definition of the objects file, installations file, and other files of the data base will be completed. A draft memorandum will be prepared for this task. Task Ij - File Utilization Techniques Investigation of sector size, updating, maintenance, purging, and backup procedures will be undertaken. File protection and valida- tion alternatives will be considered. GROUP 1 EX!-A!_.L (',t D FROM AUTOMAT VVN ARADING SEGH AND DEGLI Apip;C liFMr Release 2002/09/04: CIA-RDP78B04747A001900030083-8 Approve4lwFor Release 2002/09/04: CIA-RDP78BO4747A001 0 rcl,~ I Task Ik - Establishment of Retrieval Techniques Retrieval requirements will be established and investigation of alternative techniques for data retrieval will be carried out. Task Il - Establishment of Control Procedures T Work will be initiated on this task in accordance with the narrative task description. Task Im - Establish Briefing Board Procedures The requirement for the automated retrieval of notes will be re- evaluated. Work will begin on Tasks In, Io, and IIa. C. Pending, Unresolved Technical Problems The problem raised in last month's progress report is still unresolved although some progress in its resolution has resulted from conversations with Center personnel. Since one of the key elements in the definition of NPIC's role in the exploitation program is a definition of the products to be generated, we are preparing, with the concurrence of IPD, a preliminary definition of this product set. It is anticipated that this definition will provide a point of departure for the determination of overall Center workloads. D. Preliminary, Unresolved Contractual Problems None. E. Oral Agreements on Technical Matters The completion of Task Ib will require testing of the worksheet by PI's. PAG has informally agreed to supply personnel for this task on condition that the test will not interfere with their normal operations. F. Agreements which Require Contractual Approval None. G. Unanswered, Unresolved Matters Comments by the Contractor on documentation standards for software have not been forwarded to IPD. H. Status of Funds GFtI.3UY 7 "^ EXCLw :D I~ RCM AUTOMATIC DO4l~6)lk2elease 2002/09/04: CIA-RDP78B04747A0 AND DECLASSIF! ATIO,W 25X1A Approved For Release 2002/09/04: CIA-RDP78BO4747AO01900030083-8 Approved For Release 2002/09/04: CIA-RDP78BO4747AO01900030083-8 Approved For Release 2002/09/04: CIA-RDP78BO4747AO01900030083-8 25X1A 3/7/67 POSTAL NO . R- 322BX1A SEND TO PLEASE SIGN AND RETURN ORIGINAL OF THIS RECEIPT TO: Post Office Box 8031 Southwest Station Washington, D. C. 20024 DOCUMENT CONTROL NO. CLASSIFICATION DOCUMENT DESCRIPTION 66S469+ 25X1 A .1 .2 .3 .4 & .5 SECRET Subject: Transmittal of Monthly Progress Report (No. 3) Period February 1, 1967 through February 28, 1967 25X1A I HAVE PERSONALLY RECEIVED THE MATERIAL DESCRIBED ABOVE DATE REC'D. RECIPIENT'S SIGNATURE AND TITLE /J AND ASSUME RESPONSIBILITY FOR ITS SAFE GUARDING. =ORM 5030 NEW 7-63 DATE Approved For Release 2002/09/04: CIA-RDP78BO4747AO01900030083-8