PROPOSAL FOR ADDITIONAL ENGINEERING EFFORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001900040007-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 11, 2001
Sequence Number: 
7
Case Number: 
Publication Date: 
September 22, 1967
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001900040007-1.pdf128.71 KB
Body: 
Approved For Release' 2002/91/29.q -PDP78B04747A001'900040007-1-"' Post Office Sox 8043 Southwest Station Washington, D.C. 20024 25X1 A Attention: 25X1 A Refer to: Subject: Proposal for Additional Engineering Effort - 25X1 A Reference:. Task Order No. 17 25X1 A Gentlemen: DECLASS REVIEW by NIMA/DOD is pleased to submit this pro- modifications which are the result of the Center critique and which are. not a part of the current Contract Statement of Work. Included are the. following modifications: Y.' Perform the work to modify the IIS System Design as presented in the prepublication issue of the report "NPIC II, System Requirements" (Part 1, Volumes'.l .and 2) to: (a). Provide an IIS real-time program which will, operate as one: of three real-time programs under RUM. (b) Reflect additional consideration of software reliability. Revise the textual and graphical material.of the pre-. publication issue of the report "NPIC IIS,,,System 'Requirements" to: (a) 'Incorporate the results of A.l.(a) and (b). (b) Incorporate other substantive and editorial changes (excluding analysis or re-design)?in", accordance with the Center critiqque . Approved For Release?002/01/29': CIA=RDP78B04 .747AOO-1900040007-1 posal, with the concurrence of your technical representative, for the furnishing of necessary labor, material and facilities to perform the following tasks: A. :Revise Part I, "IIS System Requirements" to incorporate design 25X1A < o fi~,.. '41 Approved For Releas 9Q 1, 9 TMC A-RDP78B04747A001900040007-1 P..:c 8043 Attn, . Subj.: Proposal for Additional Engr. Effort 22 September 1967 Page -2- The delivery date for this material to be established as November 15, 1967. B. Development of Software macro - level Flow Diagrams 1. Perform the work to develop Macro-level flow diagrams supplemental to software general performance speci- fications. Specifically, the level of detail in these diagrams will encompass graphical representation of major decision points; entry and exit points to the IIS real-time program; and file, table and control, interfaces. 2. The delivery date for this material to be established as November 1, 1967. We propose to perform the above-listed tasks as a cost plus award 'fee addendum to Task Order 17 for a total estimated cost and fee of- (Attachment A, Cost?Analysis) Correspondence or-communications relating to this proposal may be directed to the writer or 25X1 A: Very truly yours, 2,5X1A 25X1A Approved For Release 2002/01/29 : CIA-RDP78BO4747AO01900040007-1 Approved For Release 2002/01/29 : CIA-RDP78BO4747AO01900040007-1