DEAR MISS(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002000030027-8
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
October 31, 2002
Sequence Number:
27
Case Number:
Publication Date:
February 26, 1965
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 128.64 KB |
Body:
Approved Fc elease 2002/13i '4 6IA-RDP78B04a002000030027-8
26 February 1966
25X1A
25X1 Ammer mine
No. 2 on the above.reSQ
Eeeloaed ere
S ifte&
25X1A
of Technical k* part
Y yours.
Eme ,og ee t ' ee ee1 Refit No. 2 (5 **pies)
25X1AeI mr
Declass Review by NIMA/DOD
GROUP I .;_..
77 DTATIC
CN
25X1
Approved For Release 2002/11/15 : CIA-RDP78B04747A002000030027-8
Approved For ease 2002/11/15: CIA-RDP78BO474 02000030027-8
Technical Report No. 2
25X1A Government
a. Current Status of
The following areas have been worked on during this period.
1. Measurements were made on various types of polaroid
material to investigate the relationships Letweer.
wavelengths anu degree of polarization. Ibis work is
unfinished as of this time; complete date wfli be fur-
nished at a future date,
2. The eyepiece design was reconsiderec and various other
possibilities were found to be feasible in theory.
Definitive work on this is awaiting the availability
sine wave filters.
3. A preliminary target arrangement was designed and work
has been started to fabricate the fiflteen-lire tarp-etc;.
Special film for this purpose was acquires from
4. Progress during this period was slow, due to the fact
that the ma-ior decisions to be made hinge on the avdila-
Lility of the government-furnished sine wave iiters,
which we have not yet received. i'urthermore, information
about the equipment on which this sine wave tester
be used is not yet available to us.
747A002000030027-8
25X1
25X1
25X1
25X1
Approved For ease 2002/11/15: CIA-RDP78B04744 02000030027-8
2
b. Problem Areas Encountered
No problem areas were encountered during this phase of
the contract.
c. rrojected Work for Next Monthly Period
1. Same as items c-1, 2, 3, 4, and 6 mentioned in Technical
Repc rt Nc:. J..
1. Preliminary targets should be finished and available
auri_n?> this period.
c Status of Funds i:xpended
From the period of January 1, 1965 to January 31, 1965
was spent on subject contract. This
figure includes direct labor, materials, overhead and G. and A.
dr1(1 fixe(: fee.
C? Dc t(P,c.71': tion ^,; any verbal committments anuIor' agreements
w`i t h the 1 echn i c,al ker resentatives of the Contracting
,:0 rei)ortxn period.
Dur i n 3 r< i. e'. uc)ne conversation, it was made known to us
that a camera ,reaLd wn at the government facility caused
tu,e in send in?' the filters to us. .ve expect to receive
the fiiter
~.. in two or three weeks.
25X1A
Submitted
e bruary 1964