CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002100050005-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2001
Sequence Number: 
5
Case Number: 
Publication Date: 
November 29, 1965
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002100050005-9.pdf256.45 KB
Body: 
? SECRET A CONTRACT NO. TASK NO. CONTRACT INSPECTION REPORT 25X1A TO: DATE 29 N'omennber 1965 CONTRACT ADMINISTR4TION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL ftnal (3) ESTIMATED COMPLETION DATE Iiavember 1965 NAME OF CONTRACTOR 25X1A TYPE OF COMMODITY OR SERVICE Study on Film Widtlia ' 1der than 9 Inches THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED YE FUNDS YES 0 NO IF ANSWER IS "NO" ADVISE REC. S No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE ON , REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED . 100% HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? ? YES 0 NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? C] YES NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES XJ NO NOTE: IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. COST PERFORMANCE DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 3. ABOVE AVERAGE 5. BELOW AVERAGE 7. 0 UNSATISFACTORY 2. Q EXCELLENT 4. ^ AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON REVERSE SIDE. DECLASS REVIEW by NIMA/DOD RECOMMENDED ACTION CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE TERMINATE ? OTHER (Specify) IF TERMINATION IS FECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE:. WHERE APPLICABLE. THE FOLLOWING: ITEM REC D DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES X MANUALS DRAWINGS AND SPECIFICATIONS X FINAL REPORT PRODUCTION AND/OR OTHER END ITEM u V SPECIAL TOOLING S OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 17 Novmaber 196 SIGNATURE DIVISION 25X1A INSPECTOR' SIGNATURE OF APPROVER ropm For Release 200Uk F ItRANNIf 78B04747A002100050051.9C LASS IF I ED L1 SECRET The final report, entitled An Evaluati of Alternate Plans for Aecct adating ;side Film," has been received cc*npleting the contracted study. Although the final report was delayed, all but a sue. portion of the editing and typing was completed within the time f'rwae of the contract. (The deelayw w caused by security problens at the contractors office.) The final report sunnarizes the research work Which was carried out as proposed In the or;Lginal work statement. The ccntracto:, fully grasped the requireneent of the Center in answering the question N but should EPIC do If film wider than 9-21" Is used In an acquisition system vbose end product to eiploiteed in the Center." The report describes ninny alternate plans and gives a rough evaluation of each. The contractor's report shows understanding and Imagination and it is more than expected. T rateth+! contractor's performance above average, and recommend final payment. ^ UNCLASS I F#Wroved For Release 2Q /@ l D 4ll P78BO4747AO02100050005-9 1 SECRET CONTRACT NO. TASK NO. CONTRACT INSPECTION REPORT 25X1A TO: DATE 14 der 1965 ENGINEERING SECTION/CB/PD/OL INSPECTION REPORT NO f . (I final, so state) 2 ESTIMATED COMPLETION DATE 3. $a r 1965 NAME OF CONTRACTOR 25X1A TYPE OF COMMODITY OR SERVICE St an III ~tthe R+Ti~ ~ 9 t*d*ee THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED ^ YES FUNDS IN YES ^ NO IF ANSWER IS "NO" ADVISE REC- No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON , REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- ~ PER CENT OF WORK COMPLE'-ED DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - 95 HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD?, ^ YES ? NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED.PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES No NOTE: IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. COST ^ FERFORMANCE 0 DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1 OUTSTANDING 3. ? ABOVE AVERAGE 5. BELOW AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 4. AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ? CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END T I EMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR ss Oe dr SI DIVISION PI IN SIGN - It 2 ^ SECRETApproved For Release 2001/08 COI-JDWV 2100050005? UNCLASSI FI ED ^ SECRET CONFIDENTIAL ^ UNCLASSIFIED Approved For Release - - NARRATIVE REPORT J INTERIM ^ FINAL Due to the abae nse of the tech ideal u cbitor, the fib was not fuU..v d:Lecuased until thin date end the final cmd4 be typed, but it emejers 1:hat the Mel report vill be dtUve d v4tbin the next month. All the rea aeh and waiting vas cowniete d wlthia the time but eecuril y problems at the contractors facilttt and the z litors leave have bawd the delivery of the final reaport, ? ? ^ UNCLAS$1p#pkFtoved For Release 2001/ft'JNq#EWPfA7L8BO4747AO02100050005-9 ^ SECRET 11 SECRETApproved For Release 2001/08(1) CWi ' ..O47 O 100050005? UNCLASSI FI ED CONTRACT NO. TASK NO. CONTRACT INSPECTION REPORT 25X1A TO: DATE 24 At t 196 ENGINEERING SECTION/CB/PD/OL P INS ECTION REPORT NO. (If final, so state) 2 ESTIMATED COMPLETION DATE 30 SepteMber 1965 NAME OF CONTRACTOR 25X1A TYPE OF COMMODITY OR SEPVICE 1 i&w than t! study on Fi~ widths ~y THE CONTRACTOR IS ON SCHEDULE THE CON ACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED Q Y ? FUNDS ,E] YES ^ NO IF ANSWER IS "NO" ADVISE REC. ES No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLE"ED - DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - 70% HAS AN INTERIM REPORT, FI L REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD?, ^ YES El NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES No NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. ^ COST ^ FERFORMANCE ^ DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR I ^ OUTSTANDING 3. ABOVE AVERAGE 5. BELOW AVERAGE 7. UNSATISFACTORY 2. EXCELLENT 4. AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING 9:1 ^ SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WI TH ONTRACTOR f~ yy ? :23 Amms SIGNATURE OF INSPECTOR DIVISION 25X1A 25X1A S INSP SIGNATU PRE DITIONS E:] UNCLASSIFIED ^ CONFIDENTIAL SECRET (12-36) 10-64 1897 E ? SECRET The stu r is proceeding tly behind schedule, but a lack of cleared clerical help vill, MAW the final report approximately 1 month bb:,+ the due date, The sc' -l work is being closely coordinated with operational personnel is order to make the study as accurates as possible. An outline and incite draft ;gar been revieered by the monitor and it appears that the finva report will must require ,ts. v 0 ^ UNCLAS$1ppbtOied For Release 2001/[N' NA RQ 8B04747AO02100050005-9 ? SECRET