RECEIPT OF EQUIPMENT UNDER (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002100090041-5
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 28, 2001
Sequence Number: 
41
Case Number: 
Publication Date: 
November 1, 1965
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002100090041-5.pdf51.37 KB
Body: 
Approved For Release 2002/0(r1~/0(A2 RDP I 747AO02100090041-5 NpIC /PfD /391 /65 1 November 1965 W 25X1A ? MEMORANDUM FOR: Chief, Support Staff, NFIC ATTENTION : Chief, Logistiee Drench, SS SUBJECT : Receipt of Equipment wider 25X1 A 25X1A 1. The subject contract with is for the 25X1 A design, fabrication, and delivery of our R versatile, high precision, stereoscopic Viewers, Model Although the first instrument was scheduled to be delivered onvigust 1964, delivery was delayed until September 1965 because of the previous unacceptability of the instrument. 2. On 9 and 10 August 1965, the first = Viewer was inspected 25X1 A at the Contractvr'a facilities and found to be acceptable; however, final inspection and acceptance was reserved until Installation at NPIC. 3. The first Viewer arrived at NFIC on 1 September 1965 and instal- lation was completed during the week of 13 September 1965. At that time, a thorough test and evaluation was begun by both technical and operational 4. The first Viewer ea be consider acceptable; however, this contract should remain acti. until the three of or Viewers have been received and accepted. Distribution: Orig & 1 Addre9see 1 P&DS Chrono 2 DB P&DS (Project # 997294) Xl DECLASS r ~VIMA/DOD by Approved For Release 2002/01/02 CIA-RDP78B04747A00210009bg441-5: