DEAR SIR:
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002300040002-1
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
November 30, 2001
Sequence Number:
2
Case Number:
Publication Date:
May 9, 1967
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 84.14 KB |
Body:
Approved Fe lease 2002/01/02: CIA-RDP78BO A002300040002-1
facility.
Attached you will find two work statements, P~11 covering
additional effort for Task Order #10 of Contract these
additional work statements are a result of discu sions held
with your representatives on 21 and 27 April in hic as
asked to address itself to multiple task proble at
their cost:
The principal problem involved the Fiber Optic Viewer
Digitization work. To this -replied with its proposal P-115.
The remainder of the work discussed was considered appropriate
to our present T and M arrangement on Task Order #10. It is,
therefore, submitted with this letter as work st tements. The
following is a brief breakdown of the two work s atements and
two units which remain unavailable.
The *committed funds for work order #2 involved the checkout of
Declass Review by NIMA / D
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
?Approved For Release 2002/01/02 : CIA-RDP78BO4747AO02300040002-1
Approved 0Release 2002/01/02: CIA-RDP78B01'A002300040002-1
9 May 1967
1. Fabricate two control panels as follows:
a. ide eight (8) preset/reset and zero eset switches
for the ?ounters.
b. A master power on/off switch with power ~n indicator.
c. Connectors on the rear of control panel o carry preset/
reset and zero reset functions to_counters.
d. Provide convenience outlets on rear of c ntrol panel, one
to be unswitched for continuous operation of the synchronizer.
e. Provide a 15 foot power cable, capable o handling a 20 amp
load, to run from the control panel to a wall rec ptacle.
f. Functions of all front panel controls wi 1 be marked by a
permanent type label or engraving.
2. Delivery of these panels will be 45 days upon receipt of
your order.
STATINTL
STATINTL
STATINTL
Approved For Release 2002/01/02 : CIA-RDP78BO474 !AO02300040002-1
Approved For Release 2002/01/02 : CIA-RDP78B04747A002300040002-1
STATOTHR
Approved For Release 2002/01/02 : CIA-RDP78B04747A002300040002-1
Approved 0 Release 2002/01/02: CIA-RDP78B0W A002300040002-1
9 May 1967
To provide engineering services for checl out of
Fiber Optic Viewer and associated equipment.
Following fabrication and installation o equipment
in Phase I of this proposal the complete system w'11 be checked
out to insure proper operation of the following:
a. Correct signals from encoders to counters.
b. Counters
c. ynchronizer
d. Control Panel
e. and Punch Coupler
f. and Punch
forced air cooling.
STATINTL
STATINTL
g. One each cabinet containing above cot ponents, with STATINTL
Approved For Release 2002/01/02 : CIA-RDP78B04747A002300040002-1
Approved For Release 2002/01/02 : CIA-RDP78B04747A002300040002-1 STATOTHR
Next 1 Page(s) In Document Exempt
Approved For Release 2002/01/02 : CIA-RDP78B04747A002300040002-1