CONTRACT(Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002400060005-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 31, 2002
Sequence Number: 
5
Case Number: 
Publication Date: 
August 27, 1968
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002400060005-5.pdf272.99 KB
Body: 
Approved For Release 2002/06/17 : CIA-RDP78B04747402400060 This propoied assembly and te the Sponsor. Class film fine a TY redesign, fabrication essoccecceptable to US toedequ.ately, pro- a film film The tempetattta 1nd1datInsystem will be t and reliability. If the present system Prove* unusable, it will placed with a therMIster-operated system. Cur intention will be to elevate the processing temperature well above ambient, creating enough temperature difference as to eli- minate the need for a refrigeration system in the processor. Yesitiye Pressure The bubbling problem causing the processing solutions to ov flow onto the pumps may be eliminated by increasing the amount of anti-foam agent used in these solutions. if this simple test proves negative, it t ill become necessary to. Increase the exhaust duct size, to reduce OW positive pressure build-up h module cover. Declass Review by NIMA/DOD Approved For Release 2002/06/17 : CIA-RDP78B04747A002400060005-5 MD13781304 47A002400060005-5 `Psugust The film transport indicating system will consist of an inde- pendent tachometer and an PPM indicating meter mounted adjacent to the speed control knob on the front panel. -V Prails.PEPittein The drain outlet SUM will be increased to accommodate ain- ing all modules at one time. laxec. There era two possible design oPProache 11 be shall be studied The simplest modification appears to ond taro red COUrCe wh1tch will be mete ation is eppftedto the nulsion as :I - drying problem ed and processed a film mantl- e reslog E curves for a basis to evaluate the perfor- B Proceasing Parameiers Sufficient film will be exposed under the same conditions as the reference film samples and processed to the proper Time Temperature and Type of chemistry to produce D log E curves that approach those obtained with the reference film samples. The gamma will be equivalent to the reference. Photographic speed will be within 1 stop. Uniformity of development will how a density variation of no more than +0.05 density units an average density of 1.00 one 9 1/2" X 9 1/20. film sample. ? ./ Approved For Release 2002/06/17-: CIA-FkDP78B04747A002400060005:5 . , , '? Approved I:'or Release 2002/06/17 : CIA-RDP781304747A002400060005-5 August 21, 1968 . pa les recognise that the perfotmenCerequirements in this redesign n are thinthe original scope of the contract. The successful da' strattOn of film processing capability shall constitute acceptance heE 1PrOceaS?r.. This program May be completed within your acceptance of this proposal. STAT STAT Sinc ly ro e, Approved FOr Release 2002/06/17 : CIA-RDP78604747A002400060005-5 t.