TRIP REPORT- CONTRACT(Sanitized) PROCESSOR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002400060017-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
May 31, 2002
Sequence Number:
17
Case Number:
Publication Date:
April 17, 1969
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 80 KB |
Body:
SECRET 25X1
Approved For Release 2002/06/17 : CIA-RDP 04747A002400060017-2
NPIC/TSSG/DED~
17 April 1969
MEMORANDUM FOR: Chief, Development & Engineering Division, TSSG
SUBJECT Trip Report - Contract
1. On 7 through 11 April 19691 ESD/TSSG and
DED/TSSG
for 7ne purpose o performing pre-acceptance
tests on the Processor. The results obtained were very
discouraging in that the machine met only a few of the original
design parameters.
2. The original intent of this system was to process both
original negatives and duplicate positive stock in a straight
through path using air and liquid as the carrying medium. This
approach appeared feasible from the tests performed of a breadboard
model of the system. However, the follow-on prototype has been
plagued by numerous design deficiencies such as the originally pro-
posed infra-red drying system which had to be replaced with a
modified = drier which is a serpentine system--thus defeating the
straight through processing cycle; the glycerine and water tank
heaters had to be replaced with conventional in-tank heaters; the
forced air system had to be completely revamped, etc.
3. At the conclusion of our present testing which included
transport speeds, tracking, drying, carry-over, instrumentation,
scratch tests, uniformity, sensitometric tests, and temperature
control, it was decided that the processor simply could not meet
the established parameters. Film would not d ? film
I Ishowed considerable mottling;
due to the thin base, would not track properly; the machine needs
the constant attention of two operators; the replenishment rates
are extremely high and it is very doubtful if the present design
can ever be made to operate properly.
4+. Prior to the pre-acceptance testing, arrangements had been
made with [Westover, AFB to perform test and
evaluation on the processor. However, due to the numerous deficien-
cies encountered, it is felt that the machine should not be sent to
Westover for this purpose. Instead, it is recommended that the
Declass Review by
NIMA/DOD
Approved For Release 209/H7ET IA-RDP78B04747A00240006
0t~Eedltrom uteraettc
downgrading and
dcelassffl~etlan
25X1
25X1
25X1
25X1
25X1
25X1
Approved For Release ZDQU/T7 : CIA-RDP"BO4747AO02400060017-2
VWI
SUBJECT: Trip Report - Contract
d to storage
processor be '-Lips e action is
und or un i sa vag
f
o
i a recipient can be
se for the flhowing
on is
ini fated. This re
verad~ on modifications to the
d
exp
o
ende
(a) the Contractor
ha
existing design and feels that further time and effort would be to
no avail; and (b) testing performed thus far has shown that the
principle as designed and implemented is not practical.