TRIP REPORT -(Sanitized)31 AUGUST - 2 SEPTEMBER 1964

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002600010029-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 3, 2001
Sequence Number: 
29
Case Number: 
Publication Date: 
September 22, 1964
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002600010029-2.pdf191.73 KB
Body: 
Approved For Rel a 2002f0t,10 kA-=R[?P'7 04747A0 00010029-2 22 September 1964 MEMORANDUM FOR RECORD SUBJECT: Trip .Deport 31 August - ep em er 1? The purpose of this trip was to make an in- lant inspection of the Change Detector built by pre-shipment, at the inspection were: or NPIC. Attendees 25X1A 25X1A 25X1A 25X1A 2. During a pre-trip telephone conversation on 1 told the monitor that the autocorrelation feature was3 25X1A He expected to h t no full y a Dusted. ave it operating when we arrived on 1 September but it was not operable at any time during our two-da vi the r bl i p o s t, em is solely a matter of adjustment Accsign.. not of design. 3? Althoug 25X1A lau -uzures -, operation of the autocorrelator l ange e ec or e ,. non- e ssened the value of the tri some of the cloud-and shadow-reject electronic circuitry is on the same circuit board as the autocorrelation circuitry, the rejection p Because were also non-operable. However it is not considered worthwhiletfors three these people to make another , trip t Lion feature. VM801ely to see the autocorrela- 2 5X1A Declass Review by NIMA / DoD Approved For Relea ~~~;n 2?~tamaYle Approved For Rase 2002/01/10pOPAM, 47 2600010029-2 SUBJECT: Trip Report - 31 August - 2 September 19 25X1A 4, as drafted a service contract and will send it to 25X1A us as soo as 1 as been processed through their channels. Some general features of the contract are: a. ,he contract would be for one year and would provide all maintenance spares and one two-day trip :per month by a team consisting of one senior engineer and one technician. b. The cost would be approximately as follows: c. The material cost is based on percentages of the dollar value expended on similar categories of the material used to build the Detector. resistors, electronic These categories were: short :Lead-time items such as capacitors, transistors, etc., which can be purchased at local TV and stores; longer lead-time items such as those fabricated by 25X1A specially for the Change Detector; and the very long lead-time items such as the cathode ray tube used in the flying spot scanner. This 25X1A CRT costs about-and, if the Detector is to receive a lot of use ould not 25X1 A give an estimate of the life of the CRT in-hours o opera ion as the "Life" depends on the light output of the phosphor. Approved For Release 2Q0?/Ql/10 : CIA-RDP78BO4747AO02600010029-2 r n Approved For RdVase 2002/01/10 6I4=kbOl6b64-?47AW2600010029-2 SUBJECT: Trip Report 31 August - 5. The titles of the controls on the control panel have been changed as we requested. The controls now refer to "left film" and "right film". As used in the Change Detector, "left film" means the film that is loaded into the left-hand optical system. The image of this film is viewed on the left monitor and the characteristics of the image are controlled by the controls on the left half of the control panel. The right film is, in turn, loaded into the right optical path, viewed. on the right monitor, etc. The panel markings are illuminated from below by an electroluminescent panel whose intensity is controlled by a knob on the right end of the control panel. The push-button controls ("on-off", "flicker", etc.) are illuminated by incandescent lamps whose intensity is controlled by another knob, also on the right end of the control panel. 25X1A 6. stimated that moving the Change Detector within the 2 5X1A Center - requ re about one day, assuming that the move does not cause any major mis-ali nt of the optical or electronic equipment. If we also 2 5X1A assume that th eople make the in-Center moves and that one day is required for and a second day :for the "tune-up" after the move, each move would cost us about based on the costs listed in paragraph 25X1A ,. above. Moves must therefore be kept to a minimum and, when possible, combined with a monthly service visit. After our maintenance personnel become familiar with this equipment the could be able to make any necessary moves without assistance from 25X1A 7. While at n 1 and 2 September, it was planned that the 2 5X1A Change Detector wo We s ipped to us during the week of 14 September. The un-crating, assembly of the two ma or co ~nents and the final de-bugging will require about five days. should be present for the actual 25X1A uncrating so that res onsibil y or e condition of the Detector will remain with til we can receive a, fully-operable piece of equipment 2 5X1A We will hav a an "electric mule" or similar device plus the necessary man-power to remove the Detector from the skid prior to moving to the checkout room. The Detector itself is about 6' 8" high. The crating, if used, and skid will add as much as a foot, bringing the total height to about 7' 8". The Detector probably will not be fully crated but will be placed on a skid and covered with opaque protective sheeting. 8. Upon return to the Center on 3 September, it was found that space would not be available for the checkout until the existin temporary, room is vacated at the end of the month. Therefore was advised to 25X1A plan on a shipping date later in the month. aes pan calls for pick up ati"on Monday, 28 September and delivery at the Center on Tuesday 25X1A Approved For Release 2002/0.1/10 ClA-RDP78B04747A002600010029-2 Approved For Rele 2002/ SUBJECT: Trip Report -- 31 August - 2 Sep a er d start the uncra - a 9. Because the autocorrelation, cloud-and shadow-reject and resolution were either non-operative or had not been "tuned-u " to the desired level, the technical monitor must make another trip t 1 acceptance afore the i b W 2 5X1A can n-plant e given. This tri is tentative p a for the "" nnedd riod 21 - 23 September 196I ill call on 17 Se 6l p temb confi 2 5X1A o p er 19 rm the readiness o the eq pment. 25X1A velopment Branch, P&DS Orig. - Contract le, Dev. Br. 1 - 25X1A 1 - no --RDP78B04747AO 00010029-2 25X1A have to be stored in the hall until the 25X1 A f1 Approved For Release 2O2`/01/10 CIA=RDP78B04747A002600010029-2