TRIP REPORT(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002600010040-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 28, 2016
Document Release Date:
December 3, 2001
Sequence Number:
40
Case Number:
Publication Date:
April 16, 1963
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 62.99 KB |
Body:
Approved For Release 2002/01/10 : CIA-RDP78BO4747 2600010040-9
16 April 1963
MEMORANDUM FOR THE RECORD
SUBJECT: Trip Report
1. On and 10 April 1 6
Program Status:
We are now in the eleventh month of this contract and the requirements
of Task No. 1, overall design specification and modification of breadboard
model has been completed. Task No. II, display data processing studies, is
30 days behind schedule. This delay is due to difficulties in the shadow
rejection circuit. The final changes to electronics will be delayed until
difficulty in shadow rejection circuit is corrected.
25X1A
25X1A
25X1A
25X1A
Task No. III, Design and Fabrication. Electronics - much of the electronic
design is complete, final design is dependent on shadow rejection circuitry
plus proposed changes in output resolution. Fabrication of several plug-in
electronic circuits is complete. The console design is completed and fabri-
cation of the console has started.
The optical and mechanical design is about 30 days behind schedule. This
is the area. where most of the effort in the proposed increase in resolution
will be applied. It is expected that with modification of the contract to
provide higher resolution the time for completion of the fabrication will be
extended to about 15 months. However, because checkout is being done on the
components on a continuing basis as they are being fabricated, it is not
expected to require the entire four months that the schedule allowed for this
area.
in cx N.Q,Yember? of 1964/ as called for in the present schedule. AY''-w!
Assuming modification of the contract to provide high resol tion and
raster suppression is consumated, it is expected that de very to Government
of the Change Detector will be made in Jana y - F r;_ of 196+ rather than 4'a
The current contract does not provide any maintenance service on this 25X1A
equipment after delivery. I feel that some consideration should be given to
a. service contract on this item.