CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002600030026-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
May 31, 2002
Sequence Number:
26
Case Number:
Publication Date:
November 1, 1964
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 100.41 KB |
Body:
SECRET
(When Filled In)
C&KReTd IW"W KEPU /17 : CIA-
ENGINEERING SECTION/CB/PD/OL
ESTIMATED COMPLETION DATE
- Nov 30, `64
TYPE OF COMMODITY OR SERVICE
Variable Ratio anamorphic e*irepilce
THE CONTRACTOR IS ON SCHEDULE IT
THE C
YES FIN O
Declass
I- U OUTSTANDING 3. E] ABOVE AVERAGE g? EJ BELOW AVERAGE 7. ^ UNSATISFACTORY
2. EXCELLENT 4. ? AVERAGE 6- a BARELY ADEQUATE
4 0
dirj
PlIMO 01'47A0026000 ddA- '
1 Nov 64
INSPECTION REPORT NO. (If final, so state)
R .
25X1
25X1
25X1
ONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS I1 YES NO IF ANSWER IS "NO" ADVISE REC-
OMMENDATION AND OR ACTION OF SPONSORING OFFICE, ON
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF ADDI-
TIONAL FUNDS INVOLVED.
HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? M YES ? NO (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? U YES ? NO
(If yes, indicate Items, quantity, and cost on reverse Bide.)
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
KI
Review by NIMA/DOD
WITHHOLD PAYMENT PENDING
Cl SATISFACTORY, PERFORMANCE
Cl OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FIJA 1E PORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING:
E] TERMINATE
PRODUCTION AND/OR OTHER
END ITEMS
DATE OF LAST CONTACT WITH CONTRACTOR
21 Oct 64 (telephone)
Annrnvipd For Ralaasa 9(1(19/(18/17 ? CID-RI~P7RR(1d7d70(1(12R(1(1(13(1(12R-3
FORM 1897 PREVIOUS SECRET 8.84 EDITION (When Filled ZnI I GROUP 1
Excluded from au:omoUc
down
radin
and
DOES NOT
APPLY
g
g
dedosriWcoHon
DOES NOT
APPLY
25X1
SECRET
(When Filled In)
25X1
Cftff pdjR9p'L 8fleR 6/17 : CIA-
ENGINEERING SECTION/CB/PD/OL
1 Oct 64
INSPECTION REPORT NO. (If final, so State)
2
ESTIMATED COMPLETION DATE
Nov 31, 1964
25X1
25X1
Anamorphic Eyepieces Prototype
THE CONTRACTOR IS ON SCHEDULE
? YES a NO
PER CENT OF WORK COMPLETED 4O y
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS ? YES No IF AN^WER IS "NO" ADVISE REC-
OMMENDATION AND OR ACTION OF SPONSORING OFFICE. ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI-
TIDNAL FUNDS INVOLVED.
HAS AN INTERIM REPORT. FINAL REPORT.-PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PER100? El YES ? No (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ? YES ? No
(If yea, indicate items, quantity, and cost on reverse tilde.)
Government loan of one pair ofl 15X eyepieces; valued iIper pair.
OVERALL PERFORMANCE OF CONTRACTOR
25X1
1. El OUTSTANDING S. ^ ABOVE AVERAGE S? ? BELOW AVERAGE 7. ? UNSATISFACTORY
2
^
.
EXCELLENT 4. ? AVERAGE
S- M BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
? TERMINATE
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
? OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLI: ITEMS UNDER THE CONTRACT
THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING:
PRODUCTION AND/OR OTHER
END ITEMS
DOES NOT
APPLY
DATE OF LAST CONTACT WITH CONTRACTOR
2 Sent 1964 (Trio rornnrt ria+Cra )i Q-,4-1
DOES NOT
APPLY
25X1
L'
Approved For Release 2002/06/17 : CIA-RDP78BO4747AO02600030026-3
I GROUP I
(When Filled I,o Excluded from automotk
downgrading and
NARRATIVE FORM ON
NAVE BEEN RECEIVED.