TERMS AND CONDITIONS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002700020002-9
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
June 26, 2002
Sequence Number:
2
Case Number:
Content Type:
REQ
File:
Attachment | Size |
---|---|
![]() | 88.61 KB |
Body:
-
Approved For Release 2002/07/12: CIA-RDP78B047Fra%OQ a------
STAT
7
I Our proposal is based on the award of a Cost Plus Fixed Fee contract
with the understanding that the cost principles set forth in Section XV
of ASPR as in effect at the date of this proposal shall apply.
A. Allowable items of cost on the performance of this contract
shall include:
1. General research as a part of the Contractor's G & A
expense to the extent negotiated with the Department
of Defense.
2. Expenditures by the Contractor for transportation of
the personnel directly engaged in the performance of
the work hereunder, plus reasonable actual subsis-
tence expenses.
3. Overtime premium and shift premium. This shall apply
to both the basic contract as well as negotiated
changes thereto.
4. Progress payments to subcontractors performing work
under this contract on a fixed price basis.
5. The standard selling price
F I
B. The fixed fee shall be paid in monthly installments based on
allowable costs incurred by the Contractor and approved by the
Contracting Officer computed at the same ratio that the total
fixed fee stated herein is to the total estimated cost stated
herin, subject, however, to the normallwithholding pro-
vision on the payment of fee.
C, Preliminary inspection and acceptance shall be conducted at
Contractor's Plant by a representative
of the customer and point of final inspection and acceptance
at destination.
II This proposal is submitted on the basis that authorization will be
obtained for the Seller to use, on a rent free basis, the Government
owned facilities and special tooling held by him, including those on
facilities contract land certain other facilities
contract _
Declass Review by NIMA / DoD
STAT
STAT
STAT
STAT
STAT
Approved For Release 2002/07/12 : CIA-RDP78B04747A002700020002-9
Approved For Rael se 2002/07/12 : CIA-RDP78B04747A002700020002-9
TERMS AND CONDITIONS Page 2
III Our proposal is further based on the following:
A. Receipt of a contract for all items and quantities quoted.
In the event all items are not desired or different
quantities are desired, we reserve the right to review our
proposal and revise it, if necessary.
B. Purchased technical services including engineering, design,
drafting, model shop and technician labor on a labor hour
basis may be required to meet contract delivery schedules
due to fluctuations in workload.
C. The subject matter of this proposal to be unclassified,
the equipment will not be to mil-spec requirements, and
only such drawings as necessary for fabrication will be
prepared.
D. The installation of the equipment will be the subject of
a separate time and material contract.
V This proposal remains firm for a period of sixty (60) days from
the date of our transmittal letter.
IV All prices for hardware are quoted
STAT
Approved For Release 2002/07/12 : CIA-RDP78B04747A002700020002-9
STAT
Approved For Release 2002/07/12 : CIA-RDP78BO4747AO02700020002-9
Next 1 Page(s) In Document Exempt
Approved For Release 2002/07/12 : CIA-RDP78BO4747AO02700020002-9