RESEARCH AND DEVELOPMENT PROJECT APPROVAL REQUEST
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002700030009-1
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
August 2, 2002
Sequence Number:
9
Case Number:
Content Type:
OUTLINE
File:
Attachment | Size |
---|---|
![]() | 81.58 KB |
Body:
Approved ~or Release 9QOZ/J89:9NCI -B'P78B04f 47AO02700030009-1
RESEARCH AND DEVELOPMENT
PROJECT APPROVAL REQUEST
I. Identification
NPIC proposes to add two additional tasks to an existing
contract The project constitutes a
change in scope and is to be funded from the 1lotted
to Category VI, Experimental Modifications to x Equipment
in the Class 700 Detail Sheet of the Financial Plan for 1965.
The internal designation of the project is "Design of a. Focus
Mechanism for the Chip Comparator".
25X1
25X1
II. Background
The Plans and Development Staff, NPIC, under Contract 25X1
had designed and built 25X1
a, prototype Chip Comparator. This instrument, delivered and
installed in July 1964, has far exceeded the design goal of a
two micron measuring capability. One-quarter micron repeata-
bility, although not yet proven, is felt to be attainable by
the Photo Interpreter with limited training and practice. As
a, result three more instruments are under contract with a fourth
on requisition.
did not include the stereo viewin optical system. This portion
was contracted I land was to include a
focus mechanism an support assembly as a part of the optical
head assembly. Subsequently, it was determined that the focus
mechanism could not be satisfactorily designed into the optical
head and was deleted from the effort.
Since the Comparator could not be used without a focus capability,
a.s asked to design a, satisfactory focus mechanism
for their instrument. Additionally, the mounting bracket supplied
accurate was totally inadequate to sup port the stereo head firmly
ly therefore asked to also design
an adequate support assembly.
The Comparator, as designed and built
figure as audited
hich incr s e total contract amount
The recommended action constitutes a change of scope ih the origi-
Contract and Financial Arrangements
The original cost submitted for these
additional tasks An a.u i- was requested b the Con-
tracting Officer and resulted in a reduction
Declass Review by NIMA / DoD
CONFIDENTIAL
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
GROUP 1
Ehclud.d Iron a .~
downa~.diny a.d d.cla..ili