RESEARCH AND DEVELOPMENT PROJECT APPROVAL REQUEST

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002700030009-1
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 2, 2002
Sequence Number: 
9
Case Number: 
Content Type: 
OUTLINE
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002700030009-1.pdf81.58 KB
Body: 
Approved ~or Release 9QOZ/J89:9NCI -B'P78B04f 47AO02700030009-1 RESEARCH AND DEVELOPMENT PROJECT APPROVAL REQUEST I. Identification NPIC proposes to add two additional tasks to an existing contract The project constitutes a change in scope and is to be funded from the 1lotted to Category VI, Experimental Modifications to x Equipment in the Class 700 Detail Sheet of the Financial Plan for 1965. The internal designation of the project is "Design of a. Focus Mechanism for the Chip Comparator". 25X1 25X1 II. Background The Plans and Development Staff, NPIC, under Contract 25X1 had designed and built 25X1 a, prototype Chip Comparator. This instrument, delivered and installed in July 1964, has far exceeded the design goal of a two micron measuring capability. One-quarter micron repeata- bility, although not yet proven, is felt to be attainable by the Photo Interpreter with limited training and practice. As a, result three more instruments are under contract with a fourth on requisition. did not include the stereo viewin optical system. This portion was contracted I land was to include a focus mechanism an support assembly as a part of the optical head assembly. Subsequently, it was determined that the focus mechanism could not be satisfactorily designed into the optical head and was deleted from the effort. Since the Comparator could not be used without a focus capability, a.s asked to design a, satisfactory focus mechanism for their instrument. Additionally, the mounting bracket supplied accurate was totally inadequate to sup port the stereo head firmly ly therefore asked to also design an adequate support assembly. The Comparator, as designed and built figure as audited hich incr s e total contract amount The recommended action constitutes a change of scope ih the origi- Contract and Financial Arrangements The original cost submitted for these additional tasks An a.u i- was requested b the Con- tracting Officer and resulted in a reduction Declass Review by NIMA / DoD CONFIDENTIAL 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 GROUP 1 Ehclud.d Iron a .~ downa~.diny a.d d.cla..ili