STEREO CHIP COMPARATOR MODEL (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002700030047-9
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
August 2, 2002
Sequence Number:
47
Case Number:
Publication Date:
July 15, 1968
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 305.76 KB |
Body:
U SECRET
CONFIDENTIAL
0 UNCLASS IF I EP
. PattORMSF 0 ti SiellecT1 . tiNik2KW120 : CIA-R'
CONTRACT NO.
- ? ip- , ?,,, egg 1
TeK9NO.
25X1
TO:
CONTRACT ADMINISTRATION &
DATE
15 July 1968
SETTLEMENT BRANCH/PD/OL
INSPECTION REPORT NO. (If fined, so state)
14
ESTIMATED COMPLETION DATE
Oct 1968
NAME OF CONTRACTOR
25X1
. , o t. mm ITV OR SERVICE
Stereo Chip Comparator Model
25X1
THE CONTRACTOR IE
O
ON SCHEDULE
YES N?
0
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS Ej YES Ej NO IF ANSWER IS "NO" ADVISE REC -
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
PER CENT OF WORK COMPLETE!) ?
PER CENT OF FUNDS EXPENDED -
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD.
DITIONAL FUNDS INVOLVED.
HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE.
ING THE PERIOD? 0 YES 0 NO (If yes, give
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO
(I. yes, indicate items, quantity, and cost on reverse
OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
details on reverse side.)
CONTRACTOR DURING THiS PERIOD? rts Et NO
side.)
INCENTIVES
IS THIS AN INCENTIVE
IF YES, CHECK
0 COST
CONTRACT
TYPE
II :::RD
DYES
II PERFORMANCE
0 No
III DELIVERY
NOTE:
USE REVERSE SIDE FOR COMMENTS.
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE
OF CONTRACTOR
I . OUTSTANDING 4. ABOVE AVERAGE
2. EXCELLENT 5' 0 AVERAGE
3. VERY GOOD 6, MINIMUM ACCEPTABLE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY
REASONS ON REVERSE SIDE.
7.fJ UNSATISFACTORY
OR MINIMUM ACCEPTABLE INDICATE
RECOMMENDED
ACTION
Declass
AND
APPLICABLE.
IN
CONTINUE AS PROGRAMMED
Review by NIMA / DOD
CLOSE OUT
IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE
CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT
THE FOLLOWING
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
OTHER (Specify)
IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
HAVE BEEN RECEIVED. THESE INCLUDE. WHERE
ITEM
REC'D
DOES NOT
APPLY ,
ITEM
RECD
DOES NOT
? APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS ,
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR 25X1
. les:
Annrnwari Fnr RPIPasP 2002/08/20 : CIA-RDP78604747A002700030047-9
12-671897;;;;.;:,,,,,s UNCLASSIFIED
CONFIDENTIALEl
0 SECRET
(12-36)
I
Li CONFIDENTIAL OUNCLASSIFIV/
25X1
25X1
ApprovecIteMplpitsERgiON408/20 : CIA-RDP7pB04747.04002,700030047-9
u'INTERIM IJFINAL
chip comparator,
last contract
shortly
ser
considerable
become operational
center.
Serial
which
inspection
thereafter.
numbers
became
number
had been malfunctioning
report
was' issued.,
in house
thereafter.
a month
returned
at
on
and as
after
25X1
a 25X1
25X1
The
the time That the
was made operational
Chip comparators
May 13,1968.iInstrumen
Instrument' 'required
arrived
operational shortly
optical realignment,
for approximately
result, did not
arrival at the
Chip comparator,
were
25X1
'They will
be
modified to the
latest
25X1
25X1
coa figuration,
On 7 June 1968, Chip co
ar
ors Serial numbers
25X1
were modified to the
carried on in house
to the Government.
latest
guration.
This
at no
work was
cost
25X1
personnel
ILLEGIB
O Release 200.9ing1-211-:-CIAUREIBUROAZAZAWN700030047-9
UNCLASStre)ved let- CONFIDENTIAL
0 SECRET
O SECRET X
CONFIDENTIAL
0 UNCLASSIFIED
--
Appreoficet Re le as2 0 02/08/20 :
INSPECTION REPORT
z
0
SK NO. 25X1Ki
1ATE
25X1
TO:
11 Tat V6-11.
INSPECTION REPORT NO. (If final, so state)
ESTIITAATED COMPLETION DATE
:Incere,or 1.1e18
NAME OF CONTRACTOR
TYPE OF COMMODITY OR SERVICE
Stereo Chip Comparator Model
25X1
THE CONTRACTOR IS ON SCHEDULE
DYES [33 NO
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS ETJ YES 0 NO IF ANSWER IS "NO" ADVISE REC-
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD-
DITIONAL FUNDS INVOLVED.
PER CENT OF WORK COMPLETED . ha
PER CENT OF FUNDS EXPENDED - aik
HAS AN INTERIM REPORT, FINAL
DURING THE PERIOD? 5:1 YES
HAS GOVERNMENT-OWNED PROPERTY
(If yes, indicate items, quantity,
II
REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
NO (If yes, give details on reverse side.)
BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? El YES FA] NO
and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT fa YES
IF YES, CHECK TYPE
g COST El AWARD 0 PERFORMANCE
0 NO
1111 DELIVERY
NOTE:
USE REVERSE SIDE FOR COMMENTS.
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
I. OUTSTANDING 4. ABOVE AVERAGE 7. UNSATISFACTORY
2. EXCELLENT 5. AVERAGE
3. VERY GOOD 6, 170 MINIMUM ACCEPTABLE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
REASONS ON REVERSE SIDE.
RECOMMENDED ACTION
AND
APPLICABLE,
11111
CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
CLOSE OUT OTHER (Specify)
IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE
THE FOLLOWING:
ITEM
REC'D
DOES NOT ,
APPLY
ITEM
REC'D'
DOES NOT
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR 25X1
I q 1-744.t.fmt,..?. .11467
Annmvod For Release 2nn2m8/20 : CIA-RDP78604747A002700030047-9
FORM
.12-67 1897 PREVIOUS
EDITION
UNCLASSIFIED
0 CONFIDENTIAL
o SECRET
rn,r?r
(12-36)
. -
U SECRET
U CONFIDENTIAL U UNLASbIIILU
Approved FoRiplq4sig 4110111114/20 : CIA-RDP76
B047431/4.1700030047-9 0 FINAL
T. cnip comparators have been nodified and returned to
the Center. oue is operating satisfactoIlly and is wdorgoing test and
evaluation. The second comparator Uas Uevaloped probIe, presumably
As 4 VaSUit of shipmont and 1.3 awaiting factory ecniciaas to come in
and Cneck, it out. Neither machine in my opinion. W3S.omporiy installed
and chocked out by factory technicians.
It is still too early to determine if the recent modiflearAoas to
just returned have been successful and the machines can be
conlUorod operationally reliable. eased on evidence at hand, At appears
that the comparators will be acceptable, but there is still concern as
o whether they can be maintained at an acceptable level by in-house -
tsonnel or on: a reasonable cost contract basis,-
dalirgyffilEer Kelet! ZUULIIIRSIZU trogprcktraL4/AUU27070=:9 0 SECRET
wow
25X1 0 SECRET
25X1
CONF I DENT IAL
UNCLASSIFIED
APerfeRAGFprilftkinel 8RORgifeR9 : CIA-RDP7
CONTRACT
NO
TASK NO.
7-9
25X1
TO:
CONTRACT ADMINISTRATION & SETTLEMENT
BRANCH/PD/OL
DATE
21 Movelber 167
INSPECTION REPORT NO. (If final, so state)
12
ESTIMATED COMPLETION DATE
IS July 196$
NAME OF CONTRACTOR
TYPE OF COMMODITY OR SERVICE
Manufacturer
THE CONTRACTOR IS ON SCHEDULE
YES
a
NO
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS II YES gg NO IF ANSWER IS "NO" ADVISE REC.
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD-
DITIONAL FUNDS INVOLVED.
PER CENT OF WORK COMPLETED - nil
PER CENT OF FUNDS EXPENDED - min 100
HAS AN INTERIM REPORT,
DURING THE PERIOD?
HAS GOVERNMENT-OWNED
(If yes, indicate items,
.
FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
YES NO (If yes, give details on reverse side.)
PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES gi NO
quantity, and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT gg YES 0 NO
IF YES, CHECK TYPE
COST 0 i;TrID PERFORMANCE 0 DELIVERY
El
NOTE:
USE REVERSE SIDE FOR COMMENTS.
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
1. OUTSTANDING 4.
2. EXCELLENT 5.
3. VERY GOOD 6,
IF OVERALL PERFORMANCE OF CONTRACTOR
REASONS ON REVERSE SIDE.
ABOVE AVERAGE 7. UNSATISFACTORY
AVERAGE
MINIMUM ACCEPTABLE
IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
RECOMMENDED ACTION
0 CONTINUE AS PROGRAMMED
TERMINATE
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL
FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL
RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING:
(:]
DELIVERABLE
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
OTHER (Specify)
REPORT PUT COMMENTS ON REVERSE IN NARRATIVE
ITEMS UNDER THE CONTRACT HAVE BEEN
ITEM
RECD
DOES NOT
APPLY
ITEM
RECD
DOES NOT
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
X1
DATE OF LAST CONTACT WITH CONTRACTOR 2513 Movasber 1967
Acarruved ree-ReloasP 2002/1111/20 ? riA_PnP7annA7A7Anm7nnn-kna.4-7_,,
FORM
8.66 1897 PREVIOUS
EDITION
UNCLASSIFIED Li CONFIDENTIAL
0 SECRET
(12-36)
ILLEGIB
101001,:.
0 SECRET
CONFIDENTIALEu 0 UNCLASSIFIED
Approved For Release 2002/08/20 : CIA-RDP78
NARRATIVE REPORT
304747A002700030047-9
111 INTERIM 0 FINAL
art of 1 March 1966 was prenstur. and
the post la months, considerable
ed to redesigning and t.stin the
totype mechine produced un
uipment produced under thi
ovily end has thirster* a
net and the interferometers
have been returned to the facto
ion. In addition, the three
also be returned for the same extensiv
The contractor hes exceeded his authorised funding
is now operating s own fOnds. A request for edditi
has been received and is now under consideration. Final rualutl
f the contract is dependent upon the outcome of the increased funding
request; however, it hos been established that the requirement for
the comparators still exist, and that the funds will probably be
made available.
Approved For Release 2002/08/20 : CIA-RDP78604747A002700030047-9
UNCLASSIFIED ?145F CONF IDENT IAL