RESEARCH AND DEVELOPMENT PROJECT APPROVAL REQUEST

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002700030083-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 2, 2002
Sequence Number: 
83
Case Number: 
Content Type: 
CONT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002700030083-9.pdf78.84 KB
Body: 
CONFIDENTIAL Approved For Release 20W/08/20: CIA-RDP78B04747A002700 83-9 RESEARCH AND DEVELOPMENT PROJECT APPROVAL REQUEST I. Identification NPIC proposes to add two additional tasks to an existing 25X1 contract The project constitutes a 25X1 change in scope and is to be funded from th llotted 2 5X1 to Category VI, Experimental Modifications to Existing Equipment in the Class 700 Detail Sheet of the Financial Plan for 1965. The internal designation of the project is "Design of a Focus Mechanism for the Chip Comparator". II. Background The Plans and Development Staff NPIC, under Contract ]had designed and built L~f 25X1 a prototype Chip Comparator. This instrument, delivered and installed in July 1964, has far exceeded the design goal of a 25X1 two micron measuring capability. One-quarter micron repeata- bility, although not yet proven, is felt to be attainable by the Photo Interpreter with limited training and practice. As a, result three more instruments are under contract with a fourth on requisition. The Comparator,, as designed and builti did not include the stereo viewing optical system. is portion 25X1 was contracted and was to include a 25X1 focus mechanism and support assembly as a. part of the optical head assembly. Subsequently, it was determined that the focus 25X1 mechanism could not be satisfactorily designed into the optical head and was deleted from the ffort. 25X1 Since the Comparator could not be used without a focus capability, asked to design a. satisfactory focus mechanism 25X1 for their instrument. Additionally, the mounting bracket supplied wa.s tota.ll y inadequate uate to support the stereo head firmly 25X1 a.n accurately therefore asked to also design an adequate suppor a.ssem Y. 25X1 III. Contract and Financial Arrangements 25X1 25X1 The original cost submitted for these 25X1 additional tasks wa.slI An audit was re ues t e CL by the Con- d25X1 tra.cting Officer and resu ed in a reduction The revise figure as audited which increases the to a. contract amount 25X1 e recommended action constitutes a. change of scope in the origi- Declass Review by NIMA / DoD Approved For Release 2002/08/20 : CIA-RDP78BO4747AO02700030083-9 CONFIDENTIAL 25X1 25X1 GROUP 1 Excluded fra do-d--di, -d d .1... ififc Approved For Release 31/08/29`?1RF4BP786b&7A0027000M083-9 IV. Coordination This additional impending contractual action has been co- ordinated with OL/PD It is scheduled for presentation to the 'IDC on 25 November 4. The contractor is willing to accept the audited figure No further co- ordination of this project is deemed appropriate. Security 25X1 25X1 25X1 Approved For Release 2002/08/20 : CIA-RDP78B04747A002700030083-9 CONFIDENTIAL