CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002900040046-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
November 25, 2002
Sequence Number:
46
Case Number:
Publication Date:
March 4, 1964
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 234.74 KB |
Body:
SECRET
(When Filled In)
Approved ForR~eleax''2003/01/28: CIA-RE
M% 747A002%0040C
&-~ N0'
CONTRACI'7-(~SPECTION REPORT
::~
I
25X1
TO:
DATE
4 March 1964
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO. (If final. so state)
6
ESTIMATED COMPLETION DATE
July 1964
NAME OF CONTRACTOR
1 7771
TYPE OF COMMODITY OR SERVICE
Development of a Precision Stereoscopic Point Transfer Device
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
^ NO
a
FUNDS YES ^ NO
YES
THE CONTRACTOR WILL COMPLETE TASK WITHIN ALLOTTED TIME
ALL PHASES OF THE TECHNICAL PROGRESS ARE SATISFACTORY
YES ^ NO
YES NO
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? ? YES El NO (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES a NO
(If yes, indicate items, quantity, and cost on reverse side.)
OVERALL PERFORMANCE OF CONTRACTOR
I? OUTSTANDING 3. ^ EXCELLENT S. ^ ACCEPTABLE 7. ^ UNSATISFACTORY
Z? SUPERIOR 4. HIGHLY SATISFACTORY 6. BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
.REVERSE SIDE.
RECOMMENDED ACTION
CONTINUE AS PROGRAMMED El WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
TERMINATE LI OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
25X1
26 February 1964 telecon with
SIGNATURE OF INSPECTOR DIVISION
BUIS
IN SIGNATURE OF APPROVER
FORM GROUP 1
I I2-36)
1897 SECRET
r:_1.1.1 from automatic
10.63
(When Filled In) downgrading and
declassification
Approved For Release 2003/01/28: CIA-RDPitB WR @Wb" /DOD
Approved For Release 2003/01/28 : CIA-RDP78B04747A002900040046-7
25X1
18 February 1, monitoring visit by Messrs. P&DS and
USIdPIC. Visit very satisfactory. Extensive discuss ono echnical
details as follows t
25X1
25X1
25X1
25X1
25X1
a. Digitizing system concept
from monitor.
b. Eyebox mount -
of entire box.
advised to await further instructions
advised basic system suitable except for rotation
c. Control Layout < 0 advised that joystick location not suitable -
mot be moved to proximity approaching former design (387). Other
control system and placement need further study.
d. Laser marking > 0 requested to furnish extensive samples of
various sized lazer marks and investigate flagging by dye.
e. High intensity illumination ? O declared difficulty in achieving
adequate illumination at low peers.
2. Monthly progress report for January received 32 February 1.
25X1
Approved For Release 2003/01/28 : CIA-RDP78B04747A002900040046-7
SECRET
(When Filled In)
TASK NO.
Approved F elease 2003/01/28 tfXgbf5O!'$ 474WA002 00040046-7
CONTRACT IbCTION REPORT
ENGINEERING SECTION/CB/PD/OL
7 February 1964
INSPECTION REPORT NO. (If final, so state)
5
July 1964
TYPE OF COMMOISTTY--~zr~
Development of a Precision Stereoscopic Point Transfer Device
THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
E-r YES ^ NO FUNDS 1 YES ^ NO
THE CONTRACTOR WILL COMPLETE TASK WITHIN ALLOTTED TIME ALL PHASES OF THE TECHNICAL PROGRESS ARE SATISFACTORY
~'''I{ YES ^ NO 13 YES 13"'.
I ~
HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? II YES ^ NO (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES
(If yes, indicate items, quantity, and cost on reverse side.)
OUTSTANDING 3. F] EXCELLENT 5. H ACCEPTABLE
. U SUPERIOR 4.
H
HIGHLY SATISFACTORY 6. ^ BARELY ADEQUATE
11
25X1
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
E CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
El TERMINATE El OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING:
PRODUCTION AND/OR OTHER
END ITEMS
DATE OF LAST CONTACT WITH CONTRACTOR
? January- if 4. - Telecom w th
DOES NOT
APPLY
SIGNATURE OF INSPECTOR DIVISION
DOES NOT
APPLY
X1
FORM
10-63 1897
SECRET
(When Filled In)
I
Excluded from automatic
downgrading and
declassification
(1 36)
Approved For Release 2003/01/28 : CIA-RDP78BO4747AO02900040046-7
Approved For Release 2003/01/28 : CIA-RDP78BO4747AO02900040046-7
30 Januftry 1964. Verbal negotiations are under ay for
consideration of adding a digitized comparator system to the M.
It appear that a I I system will be the most
appropriate. Such a System w. co pproxi.mately 30K. A
recommended course of action should evolve during February.
Approved For Release 2003/01/28 : CIA-RDP78BO4747AO02900040046-7
TASK NO.
ddFF
rove
CUNTRAlp INS PEC~I i ~(~R~0
900040046-7
CIAARDP78B047 00
03/01/28
TO:
h ~. bee a f-44
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO. (If final, so state)
f
ESTIMATED PLET N DATE
f/
NAME OF CONTRACTOR
TYPE
Ster
eos
THE CONTRACTORIS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
YES ^ NO
FUNDS ? YES ^ No
THE CONTRACTOR WILL COMPLETE TASK WITHIN ALLOTTED TIME
ALL PHASES OF THE TECHNICAL PROGRESS ARE SATISFACTORY
I YES ^ NO
? YES ^ NO
HAS AN INTERIM REPORT. FINAL REPORT.
PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
NO (If
DURING THE PERIOD? ? YES 1:1
yes, give details on reverse side.)
DURING THIS PERIOD? ^ YES a No
TO
HAS GOVERNMENT-OWNED PROPERTY BEEN DE
R
LIVERED TO CONTRAC
(If yes, indicate items, quantity, and cost on reverse side.)
OVERALL
PERFORMANCE OF CONTRACTOR
I. O OUTSTANDING 3. E] EXCELLENT
5. ACCEPTABLE 7. UNSATISFACTORY
2. 13 SUPERIOR 4 HIGHLY SATI
SFACTORY 6. El BARELY ADEQUATE
IF OVERAL OR E OF CONTRACTOR
IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
FAI CONTINUE AS PROGRAMMED
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
TERMINATE
D OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF
THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
REC'D
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
SIGNATURE OF INSPECTOR
DIVISION
F&W
INS
L
SIGNATURE OF APPROVER
0
1897
SECRET
GROUP 1
cluded from automatic
E
(12
.36)
.63
10.6
1
x
d
(When Filled In)
downgrading an
declassification
SLCltt I
(When Filled In)
25X1
Approved For Release 2003/01/28 : CIA-RDP78BO4747AO02900040046-7
Approved For Ielease 2003/01/28 : CIA-RDP78B047472900040046-7
25X1
25X1
25X1
25X1
Proi,:^ss report
Deam;I-er.
la spite of z e , e? re ee ter to I
reports do not as Yet area
axe 11 Deeeeu beer,
o u n t ; r a e t for the thr k
I
Approved For Release 2003/01/28 : CIA-RDP78B04747A00290004
05X1
25X1
a 25X1
2%(1