VERSATILE, HIGH PRECISION STEREO POINT TRANSFER DEVICE NOVEMBER 1963 PROGRESS REPORT JOB #552

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002900040090-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 25, 2002
Sequence Number: 
90
Case Number: 
Publication Date: 
December 17, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002900040090-8.pdf164.58 KB
Body: 
STAT Approved or Release - - GENERAL VERSATILE, HIGH PRECISION s rEREO POINT TRANSFER DEVICE NOVO BER 1963 FROGIZE:=SS RE PORRT JOB #552 The work in this reporting period has been to complete design layouts and empha_ize purchase of long lead time items throughout the instrument. Optical configuration has been arranged that pro- vides a practical optical and mechanical layout. This design will allow all major subassemblies to be separately mounted to a single plate so that servicing and adjustments are simplified. In addition, the entire objective assembly optics can be easily removed from the viewer for laboratory alignment. Features, such as laser film marking, reticle, and objective lenses can be added or deleted relatively easily. Design layout should be completed in December. Detailing is progressing and should be completed in Deceiber. . No fundamental changes have been made, although there have been minor alterations for clearance, adjustments and machining. Declass Review by NIMA/DOD Approved For Release 2003/01/28 : CIA-RDP78BO4747AO02900040090-8 -1- STAT 2. EYEPIECE ASSENE Y (Contd. Eyepiece support linkeage has been designed and are awaiting final space requirements of cabinet and objective assemblies. The design features a dead weight counterk;alance and worm gear angular adjustments that should provide easy. handling of eyepiece assembly. Motion damping and locking are to be done by hydrau- lic cylinders. F1 MMME ASSEMBLY Pattern and casting have been ordered and machining and heat treat~3ent sources have been located. Because of the many steps involved in processing this casting, close traffic control will be exercised to minimize lost time. Delivery of frame casting with completed machining will be in rrebruary, representing at least one month delay in equipment delivery. Design of x carriage is firm but Y carriage is held up pending objective assembly design. Release for manufacture of Y carriage is expected in December. Design work nearly complete except for small changes for machining aids. STAT Although screw and its mounting configuration are firm, order has been held up pending decision to use 2 1/2mm or 5mm lead. screw drive will also be held up. Customer has been advised by that delivery will be at least three months as well. Approved For Release 2003/01/28: CIA-RDP78BO4747AO02900040090-8 -2- STAT Approved or Release - - 6. SCAN DRIVE A ;SEMhLY :;.can velocity aljust;-)ent circuits are being designed so that :iaxi;,,ui1 velocity of It /second will always be attained on one channel, regardless of nagnification setting of optics. This feature is thou jht to simplify oscillator design and give operator rapi. steering control. ;i bypass wilt be required, however, to iregar~i zoom magnifier's factor on scan velocit/. turfy of slo-syn motor's resonances has not been completed. Two-,peed transrjissioo required for the scanning drive has been ordered and is expected here in 'January. 7. LIGHT TABU / ND FIt..\l DRI1L Final stages of design of light tartle are underway with detailing and release for manufacture completed for castings and other long lead time items. Cold cathode lamps and vacuum plates will be released for manufacture early in December. vacuu;:1 holddown system design should oe firm for manufacture in December. Devising a practical means to retain vacuum manifold is the principle problem being solved, Film drives configuration is firm with many specially designed parts in manufacture. r,alance of manufactured and purchased parts will be released in December. The followinc are conclusions made at a meeting with customers personnel at i:ovember 19, 1963. A. Maximum film temperature is now defined as ambient + 300 F or 13U? F maximum. 3. Design objective of equipment accuracy is .0001 inch/inch accumulating with travel. C. scan drive velocity in either axes, either channel, is to be auto3vatically reduced as magnification is increased. Approved For Release 2003/01/28 : CIA-RDP78B04747A002900040090-8 STAT STAT D. Film loop takeup to have length of 19 feet as measured from: center of format areas. considera- ton will he made to speed-up film loop and thread- illy velocity. Maximum brightness at eyepiece is to be near as possible to 50U ft. lamberts with minimum color temperature of 35UO0k. for an adjustment range of F. C. U. 1OOI to 5u;*. An elapsed time meter is,to be installed on equipment. 35mm film not to be used. State field size and magnification expected. ( see 1. Septeumber-uctoer. Progress }Report}. Blowing air under film acceptable if used. Function j. control to be located at control parcel. Include enhancer switch or control pane- . i.. cabinet configuration consisting of viewer cabinet to have writing top with hinge side panels where mobile control console will be placed. A larger rack will be located remotely, corita.i-ning larger control and accessory items. 8. WORK TO BE COMPLETED DUPING NEXT PEPORTI:'SC; PERIOD A. Complete design configuration for objective assembly. B. Complete detailing and release for manufacture, eyepiece assembly parts. C. Follow and control processing of frame and carriage cast- ings for minimum lo_;t time. D. Complete carriage design and detailing, releasing all revisions for manufacture. Approved For Release 2003/01/28 : CIA-RDP78BO4747AO02900040090-8 -4- STAT E. Firm scanning drive mechanical and electrical design work. Order all long term purchased parts. F. Complete vacuum film holddown scheme and order all purchased parts. Approved For Release 2003/01/28 : CIA-RDP78B04747A002900040090-8 -5-