LETTER(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A003200010030-0
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
June 26, 2002
Sequence Number:
30
Case Number:
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 142.56 KB |
Body:
Approved F
ST
AT
AT
AT
I. I mcaurdunce with the pProvisiot-w of 'outr
and effective upou : arpt to hereof! ;mow ire ~zt ri hers ' . r s +
with the erfbvmwu-e of "# ..?k -4o. to wzll
2. The scope of work to tx- x oive : "Ier this :,mss Order art
such additional provisions a may t s 4pi is ., n1 e k r e t f rth t. n the
4ttetched schedule.
3. The eestisestod cost
eeeelusive of fixed fee, its
shell not to iacutrred w-itb,?t prijr
Coe tratcting 2ffiaer.
Uite tv> ?)r!r,
a:arI Asti xf U
Waal met upon receipt of as duly 'cuw mor- of th s s
,And sha-U be etepl~ an or before six f") -reekz :f {r of
duly ed copy of this Tetsk Order; hovever, ld `. cf
psrlo11 mi'me way be ext4maded by , a
D
5. The wor. ,ni aer ices
6. 'Van rocs of ,il cOies -)
return the arigba1 ?und one copy to the
r et a inirt ;Y fors fi .+ ,
AT
Approved For Release 2002/08/06: CIA-RDP
.r a aie.se=
?{_~.: '_ . the
Declass Review by
NIMA/DOD
ST
Approved Fdoelease 2002/08/06 : CIA-RDP78BO474003200010030-0
Contract
SCHEDULE
I. SCOPE CW '"'WK
1 -1
Contractor stroll furnish the facilities and engineering services
necessary to perform the following work:
A. Contractor Will conduct a thorough investigation sand furnish
a description of dtsitpu approetchee and the analysis and solution
of all the presently inds'termi.nate optical parameters and
parobisns in moanection with the desi~p and sanufhature of
Transforming Pt Cation Printers in accordance with Ptass I
of Contractor's Proposal 3C62-3014-150 dated 18 Wy 1962;
said document being incorporated herein by reference together
with revisions hereto as shown in Exhibit A", attached hereto
and =do a part of this Task Order.
B. At the completion of the design study and investigition under
P base It a report summriaing the results will be submitted
to the Contracting Officer. n )e repo=rt will present the
saterial in such a m mer as to permit the ContreLating Officer
to select desired cZameteristics and in those instances
wtare options leave been investiaLted, all data inel-LvUng, the
effect of the various option on cost, accuracy and caqplmdty
shall be provided to permit the Contracting Officer to make
valid decisions.
Contractor shall ea olete Pine IV and submit its report within
six (6) weeks after receipt of this Task Order.
STA
Approved For Release 2002/08/06 : CIA-RDP78BO4747AO03200010030-0
Approved Fcelease 2002/08/06 : CIA-RDP78B047S003200010030-0
Teak Ordar 3io. 5
tract
RMLSION To CONTRACT1t' S PROPOSAL S'BC-62-3014-150
dated 18 )KY 1962
1. P+sgae 1-Z,._ ZAP 2nd. 114. Add! (a) after the vard
2. Pa 1?i ~a titled ?Tales I. c n?e ... phot+gphy
and all ~es..: ry~o ...ptuxtogralb in aU
investigktions and studies..."
3. Pao 1-2
side of .
pr t.>,
c. on bottom half of rift ead
is of -na r' to ilesy = at twn of
4 3Ae 2-2, first sentence of last . Delete "overr
of
5. 2.4. Delete parsgrap 1 in its entirety.
6. Pe$p 2-4 . M MW Huber of parsetspib- 2 to par-gb 1 and revise
the rad aai ff J e: "The curved easel vill be provided with vacu*
grooves to hold the films flat during exposure.
7. Far_2~. MwAN r of paraismph 3 to ra a i 2-
8. W 2- . change m= ber of paragraph 4 to p r iv aph 3.
9. P 2-10, ..eon! ru first sentence. Delete at the
film na a Witte at the center t.'
10. 2-10, second_ first sentence. !^lete " GAMA r'
11. As-~e 2-11~ first is'a$zsa~h. Mans Various option's to "various
optians
12. pane 2-Ll. Add VLmSt l#i heeding PSase II?" before second
Per t r . th on arcs 1~"~8~e.
0 I
STA
Approved For Release 2002/08/06 : CIA-RDP78B04747A003200010030-0
Approved For Release 2002/08/06 : CIA-RDP78BO4747AO03200010030-0
Approved For Release 2002/08/06 : CIA-RDP78BO4747AO03200010030-0