CONTRACT(Sanitized) SALES ORDER 1-10025-1
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A003200020042-6
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
June 28, 2002
Sequence Number:
42
Case Number:
Publication Date:
November 5, 1964
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 223.4 KB |
Body:
Approved For Release 2002/07/22 : CIA-RDP78B04747A003200
COflOENTIAL
(7ti 6
77
SDN
Copy of
Page
5 November 1964
Please R.efeTyry}ence:
A51--64-2533
Gentlemen:
vv'e are pleased to prov l r-;e the t h i rd_ in a series of : vIonthly Prod re s s
i eports covering the effort expended' on subject contract ..wring the
period 5 October to 1 November, 1964.
In the area of research, the construction of the test race, reported in
last months progress letter, was completed. The test rack incorporate:
a rotary plenum pump also under test, and straight lengths of P.V. C.
plastic piping Interconnected by standard plastic fittings. series of
flow and pressure measurements were taken to determine losses -across
these fittings. :'after completion of these tests, the assembly -w s
dismantled, the pipe ends carefully streamlined internally, c nd the
entire system re-assembled. Further flov7 and pressure measurement
were then taken. ` ith no other changes, a teen percent increase in
flow, with apportionate decrease in pressure drop was recorded. The
test rack is now in progress of dismantling for comparative tests u-,,,! ng
stainless steel piping and sanitary type fittings such as are use! in the
food handling industry.
A test stand was completed, and a positive pressure plenum constructed
to determine the efficiency of positive and negative pressure capstans
During the current reporting period much effort has been sent in pr?parl"don
of the area in which the clean room will be installed. The floor vvus e~=ca-
vated and the concrete mounting slab for the :HTr/5 processor, poured.
(Conti d)
This document contains information affecting the
National Defense of the United States ula within
8
the meaning of ilia Espionage Law,
U. S. C., Section 793 and 794. Its transmission
or the revelation of its contents in any manner
ited by
person is prohip law.
to an unauhori.srd
CONFIDE
GROUP-1
Excluded from
Automatic
Downgrading and
declassification
Declass Review by
NIMA/DOD
Approved For Release 2002/07/22 : CIA-RDP78BO4747AO03200020042-6
Approved For Release /07/22 - I ?-RDP78B04747A003200020042-6
SDN
a S. Government
Copy of
Page? of
S November 1964
Numerous partitions and redundant =.irin and piping were removed# and
new access doorways opened In walls.
25X1 -,as paid to the Js nt by the company
rek: wt~i: tc.tives for the purpose of detaile cha clip of a C earl rc::=
25X1 sl eciflcati: n prepared by .= hic had been submitted
to them previously, and to finalize air-conditioning re.,uirementsw
schedule-of erection was submitted to
?~` h ch set back the tivarting date of fiat stage erection of the Boor to
November 23rd. -~ strong request was made by Ito thy:
25X1 O company to do everything possible to bring, forward this starting
date. . . return visit v;as made to the
for the purpose, of final contract negotiations i n," approval of dra
and specific ,lions.
0
ii.ngs
ork contemplated during the forthcoming reporting period is as follovi-Gm
1. Commencement of clean room erection.
Tes'tinc, ? of liquid bearings.
Testing of transport capstans.
a Continuing of pressure drop tt
25X1
25X1
25X1
25X1
Funds committed or expended to date are a, pj-ro :imately If you 25X1
should li ve any qu= stions or desire further inform: tion, please do not hesitate
to contact us.
Very truly yours
25X1
Approved For gaN 4 7u 4 RDP78B04747A003200020042-6
CONTRACT No.
TASK NO.
CONTRACT INSPECTION REPORT
C:I
211
TO:
DATE
--
-
Noy 64
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO
(If final
s
t
t
.
,
o s
a
e)
ESTIMATED COMPLETION DATE
-~o Jun 65
NAME OF CONTRACTOR
TYPE OF COMMODI
Film Processor
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
YES No
FUNDS ? YES O NO IF ANSWER IS "NO" ADVISE REC-
OMMENDATION AND/OR ACTION OF SPONSORING OFF
PER CENT OF WORK COMPLETED 25
ICE. ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI-
TIONAL FUNDS INVOLVED.
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? ^ YES E] No (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES NO
(If yes, indicate items, quantity, and cost on reverse side.)
OVERALL PERFORMANCE OF CONTRACTOR
1. 0 OUTSTANDING 3. 11 ABOVE AVERAGE 5. 11 BELOW AVERAGE T? UNSATISFACTORY
2. ^ EXCELLENT 4. ? AVERAGE 6. LJ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
M CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
^ TERMINATE ^ OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL;REP.ORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
oct 64
FORM
897 G R E V p(ove or Release 2101101271017722 s
a.SA
EDITION
(When Filled In)
SECRET
e I
downgrading and
deckiiilicatNn_
Approved For Release 2002/07/22 : CIA-RDP78B04747A003200020042-6
25X1
?
management has failedin its responsibility to assign a full-time
Program Manager withtfull responsibility for all aspects of the
program. Many persons have had some responsibility. As a result,
the program has been poorly guided.
This program has lagged somewhat.
On all recent visits the contractor was advised that the program
has been given ineffective guidance and that this should be corrected if
it is hoped to effect a continuation of the program in FY-66.
Some work has been performed but at a level below expectations.
has now been assigned full responsibility for the:
program and appears to be doing quite well. However, he must progress
rapidly in order to make-up for the lost time since 1 June 1964.
25X1
Approved For Release 2002/07/22 : CIA-RDP78B04747A003200020042-6