CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04767A000300010004-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 29, 2004
Sequence Number: 
4
Case Number: 
Publication Date: 
October 29, 1969
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04767A000300010004-2.pdf81.67 KB
Body: 
25X1A 25X1A QS-ECft ^ CONFIDENTIAL ^ UNCLASSIFIED A~@h%RG1EoIrN %JORPPORT7 2S5~1 A P78BO4767A000300010004-2 TO: 25X1A DATE TSSG 29 October 1969 2 5X 1 A INSPECTION REPORT NO. (If final, s s at ROOM 5- 2 ESTIMATED COMPLETION DATE 21 December 1969 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE CODED TO DATE 3 Nov 1969 Image Analysis Support THE CONTRACTOR 15 ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED YE ^ FUNDS fl YES [] NO IF ANSWER IS "NO" ADVISE REC- S No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED 65% DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - 65% HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? a YES O NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES ? NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES ]a NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. 0 COST Ii AWARD 0 PERFORMANCE DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 4. ^ ABOVE AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 5. ^ AVERAGE 3, VERY GOOD 6. ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE 0 CLOSE OUT ^ OTHER (Specify) IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END T I EMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 22 October 1969, Contractor visited this facility DIVISION TSSG/APSD INSPECTOR'S EXTENSION SIGNATURE OF APPROVER DECLASS REVIEW BY NGA / DoD FORM on7 U E 12-67 I89 PREVIOUS ^ UNCLASSIFIED ^ CONFIDENTIAL (~ SECRET 412-S6) EDITION ^ SECRET FI T AL ^ UNCLASSIFIED 25X1A E )INTERIM ^ FINAL 1. On 21 October 19691 delivered a detailed outline and rough draft of the first two chapters of the document they will provide under the terms of this contract. 2. Delivery of the aforementioned outline constitutes the first tangible product of this agreement. It is in keeping with the direction given the contractor and is tentatively acceptable. 3. The contractor has agreed to provide a rough draft of the third chapter of the planned 5-chapter document by his next visit, currently scheduled for mid-November 1969. Approved For Release 2005/02/17 : CIA-RDP78B04767A000300010004-2 . APO, ^ UNS,SIFIED ^ CONFIDENTIAL 1 SECRET