MEASUREMENT IMPROVEMENT OF 552 FIBER OPTICS STEREO VIEWER

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A000100070007-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 23, 2006
Sequence Number: 
7
Case Number: 
Publication Date: 
December 2, 1966
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A000100070007-8.pdf142.79 KB
Body: 
Approved For Release 20Q.6106123.,:.CIA-RDP78B04770A000100070007-8 I 25X1 Measurement Improvement of As ._s been discussed vc-~ on e'?: crai occasions, the measurem.c it accuracy of ~lachine could ee ~nrovcc: through additional efforts, Inc t~;o u m achcs~described below eac =avc th~__r individual advantages. In the he -'first approach, it is an ii mediate fix but does -not have a long ..nta;,~. The second approach (cam adjusted) has a long term advantage urt:.~r measurement improvement and/or calibration can be r::ade quickly -tioa of machine usage, wear, and basic aging of machine parts. A- p. 1 - Shimming Si..ce the principal cause of erro: in the measuring capabilities of [::I;ach_:a is due to slight distortion in the ways, refinement i.n the 25X1 -ac.".fire geomeery can be accomplished. The basic method of refin=e n-_- :-s to measure the slight distortion and shim the ways sufficient to bring "c.__s 64sto_-Zion to a minimum. This is a time consuming and temporary approach s' _ - fie ar.:i use will cause further istortions and require further shimming. c further disadvantage in tl at _t will require the machine to be dol.... _riod of at least two weeks and probably four weeks for each correcrt.a en each Y axis. With respect to the X a-,is; the down time is greater _ ~or of two. Co. analysis sheets applicable to the estimated time to accomplish eci ax-_s sh-- ..ing are attached. We have estimated some four weeks of effort. 11 a.. our as are accomplished at the same time, the calendar time would not _ddit-_'ve; some overlapping effort could be achieved, thereby reducing the ..1 ti.a to approximately four months for all four axes. MECHANICAL - EI CY?"ON:C S`.'S; n+= .~_..+??C' - DVELOPMENT - PRODUCTION MANUiACTURING EXCLUD,D FR^?t AUTJAt CEJLASSI RCAT.Th 25X1 Approved For Release 2006/06/23: CIA-R DP78BO477OA000100070007-8 BEST COPY AVAILABLE Approved For Release 2006/06/23: CIA-RDP78B04770A000100070007-8 Apnro.ach 2 - Cam Adjustment Because of the detailed ef:orc an--' extensive down time required to cc:. ash the shimming operation, anos::ar -)roach was taken to negate the and accomplish the program with down time and with major long re.r efect. This . approach is to desi; :. a c--.-,,. which is attached to the basic _l::a and carriage in such a way th -.- as a _` unction of distance moved the __ter calibrated to the basic c.r ors - thc machine. A drawing of the ,_:ation of the cam device is attached, As shown in the figure, a fixed _tac: to the carriage drives a pivotally mounted cam that, in turn, a ro'-.cably mounted encoder, The c--:n function would include the compos:ce error of ways and screw for the axis it serves. The uniq,.: - -.: _ c of t~.; s method allows change and reduction of error in a controller :atho:;t disturbing optics or other mechanisms of system. Cams and wil" be accessible for modification or servicing. It should be pointed out that the cost analysis sheet attached fo:: a ::oac:_ is for all four axes and is basad on using a straight cam to rev a str. -ht line approximation of the. errors and adjust accorcangly. ou1c be shaped to further reduce t.?.. errors to an absolute us a detailed calibration of the _qui...... ancc, We have not estir._ _~d t__;s thi._ _oa sirs` we understand that if fc_ can be brought to ave e. at..~ chat the machine down t_me to acco p-i-~sh the installation of : cams _::d associated hardware would amount to two to three wc:ks. 1 contract time would be two to three months to prepare the hardware II obtain to purchase items, and perform the installation. It firm opinion t:-.- a greater degree of measurement ccu:_ cov be obtained using the add, stment approach, a con,sid, rabl,; ~e.~s tip, and a means of easily zecali.racing the achine as La ~o the cams to provide greater accuracy than initially proposed herein. The quotation submitted her,%.:_th is valid for sixty days from the --_-:.ission of this letter and is baser upon 75% progress payments, based on cost incurred during any monthly period, The contract is based on a :stimarad time of three months for the cam approach from date of award _.Mete installation in your facility. If we can provide any additional :ion or establish a meeting to discuss this matter in detail, please do