TASK ORDER NO. 20 (8612) 68 R BASIC CONTRACT(Sanitized)(SECTIONS A & E APPLY)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A000100080010-3
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
January 21, 2005
Sequence Number:
10
Case Number:
Content Type:
CONT
File:
Attachment | Size |
---|---|
![]() | 323.43 KB |
Body:
i
A A F I 2005/02/17 CIA RDP78B0 Annnannnonnan 3
4
pprove 1e ease
25X1
is
25X1
NEGOTIATED TASK ORDER
REGISTERED
Post Office Box 8043
Southwest Station
Washington, D. C. 20024
This Negotiated Task Order is entered into by and between the parties
hereto, pursuant to statutory authority, as of 20 November 1967.
It is agreed that the Contractor shall provide the necessary material and
services to perform the scope of work as set forth in the attached Schedule and
shall comply with such other provisions thereof, as may be applicable.
The rights and obligations of the parties hereto shall be subject to and
governed by this Task Order and the provisions of subject Basic Contract which
are incorporated herein by reference and made a part hereof. To the extent of
any inconsistency between said Basic Contract and this Task Order, the latter
shall control.
Costs in excess of this amount shall not be incurred without the prior written
authorization of the Contracting Officer.
The work to be performed under this Task Order shall be completed on
or before 20 May 1968.
It is requested that you execute all copies of this document. Please re-
tain one copy for your records and return the original and one copy to the under-
signed within ten (10) days from the date of your receipt thereof.
Very truly yours
THE UNITED STATES OF AMERICA
By
Certified under DMS Regulation No. 1
Certification of the assigned DO rating
on this contract shall be as follows:
U.S. Government Classified Contract No.
TITLE
Defense Order rating DO- A-7
NOTICE
This material contains information affecting the National Defense of the United States within the
meaning of the espionage laws, Title 18, USC, Secs. 793 and 794, the transmission or revelation of which
in any manner to an unauthorized person is prohibited by law.
Declass Review by NGA.
E.ctuded from automatic
downgrading and
declossifconon
25X1
25X1
25X1
25X1
Approved For Release 2005/02/17 : CIA-RDP78BO477OA000100080010-3
25X1
25X1
25X1
(SCHEDULE)
Approved Ffelease 2005/02/17: CIA-RDP78B044A000100080010-3
PAGES
2 X1
The Contractor shall design and fabricate a prototype Advanced Stereo
Rhomboid (Model II) in accordance with DEVELOPMENT OBJECTIVES, ADVANCED STEREO
RHOMBOID PROTOTYPE MODEL II, dated 5 December 1966, and the Contractor's proposal,
7-1148B 7-1022), dated June 1967, which are incorporated herein by
reference an-made a part of this task order, subject to the following additions
and deletions to the aforesaid DEVELOPMENT OBJECTIVES:
a. Under Sub-Section 3.3 add:
2x and 3x must be parfocal within lmm,
lx must be parfocal within .8 inches from the 2x,
b. Sub-Section 3.4 is deleted in its entirety.
c. Under Sub-Section 3.5 add:
When the rhomboid assembly is installed and properly adjusted to the
Zoom 70 or Zoom 240 Power Pod with which it will be used, the image of an
object point located in the center of the eyepiece field of view will not
move more than 1.0mm (as measured in the eyepiece focal plane) away from
the center of the eyepiece field of view when the image rotation prism is
rotated through 360? of prism rotation. This criteria will apply for all
combinations of zoom settings and objective magnifications values.
d. Under Sub-Section 3.6 add:
The resolution of thel Zoom 240 with an on axis resolution
capability of at least 240 lp/mm, or el Zoom 70 with an on A X1
axis resolution capability of at least 150 lp/mm will not be decreased. over
any portion of the field-of-view when the Rhomboids with the lx objectives
are used. When the 2x stereo objectives are used the resolution at any
point of the field will be double the values found in the lx case. When
using the 3x stereo objectives with the Zoom 70, the resolution values will
be three times that found using the lx objectives and when used with the
Zoom 240, the resolution values will be 2.5 times the values found with the
lx objectives.
The light transmission characteristics of this prototype with its 2x
objectives used on the Zoom 70 will be no less than 75% of the transmission
values of the Zoom 70 with the standard 2x Wide Span Rhomboid attachments,
In the binocular monoscopic mode the transmission shall be 40% of the stereo-
scopic values.
e. Under Sub-Section 3.10, delete 3,10.2 in its entirety.
NOTICE
This material contains information affecting the National Defense of the United
States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and
794, the transmission or revelation of which in any manner to an unauthorized
person is prohibited by law.
C O N F I D E N T I A L
3 8M 1412.
GROUP I
EXCLUDED FROM AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For Release 2005/02/17 : CIA-RDP78BO477OA000100080010-3
Approved Ffelease 2005/02/17: CIA-RDP78B016 A000100080010-3
(SCHEDULE)
This material contains information affecting the National Defense of the United
States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and
794, the transmission or revelation of which in any manner to an unauthorized
person is prohibited by law.
C O N F I D E N T I A L
2X1
In the event there is a conflict in the above references such conflict shall
be resolved, in writing, by the Technical Representative of the Contracting Officer.
PERFORMANCE OF TASK ORDER:
This task order shall be performed in two phases as follows:
Phase I
Design Analysis Study
Phase II
Final Design and Fabrication
PERIOD OF PERFORMANCE:
Phase I
The period of performance for Phase I shall be 20 November 1967 to 20 May 1968.
Thereafter, a further period of thirty (30) days shall be required by the
Government.for.evaluation prior to Design Approval.
No work may be performed on any aspect of Phase II prior to receipt of written
approval by the Contracting Officer of the Design Analysis and notice to proceed
.with the-work of Phase II. All work shall be completed within seven (7) months
from the date such approval is received by the Contractor.
1. Reports required by the attached Specification Noo DB-1001, dated
31 August 1966, which is incorporated in and made a part of this task order.
2. Design Analysis Study Report.
Phase II
One (1) prototype Advanced Stereo Rhomboid (Model II).
One (1) Carrying Case for the prototype instrument.
Operation and Maintenance Manual. (Five (5) copies)
NOTICE
3-88 1412a
GROUP 1
EXCLUDED FROM AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For Release 2005/02/17 : CIA-RDP78BO477OA000100080010-3
Approved Release 2005/02/17: CIA-RDP78B04A000100080010-3
(SCHEDULE)
4, Reports required by Specification No, DB-1001, dated 31 August 1966.
DELIVERY:
1. Two (2) copies of all reports required under this task order shall be
forwarded directly to the Contracting Officer.
2, Three (3) copies of all reports required under this task order shall be
forwarded to the Technical Representative of the Contracting Officer at the
following address:
25X1
Post Office Box 8031
Southwest Station
Washington, D. C. 20024
29
3. In the event any item under this task order is personally delivered to
the Technical Representative of the Contracting Officer, asigned receipt, in
duplicate, must be obtained from said representative and one copy attached to any
invoice submitted for reimbursement for such item(s). Failure to do so will result
in suspension of payment, since the Disbursing Officer is prohibited from making
payment without evidence of delivery.
CONSIGNEE ADDRESS:
25X1
Whenever a redirection of effort is required not within-the scope originally
contemplated, the Contractor may appeal to the Contracting Officer for a written
order to perform and a statement that an equitable adjustment in price will be
made. Failure to appeal to the Contracting Officer before embarking upon the
changed work will not afford protection of the right to additional compensation
for such work.
TASK ORDER ESTIMATED COST:
Phase I
The estimated cost of performance of the work under Phase II of this task
25X1
NOTICE
This material contains information affecting the National Defense of the United
States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and
794, the transmission or revelation of which in any manner to an unauthorized
person is prohibited by law.
C O N F I D E N T I A L
GROUP 1
EXCLUDED FROM AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
3-58M 1412a
25
X1
X1
Approved For Release 2005/02/17 : CIA-RDP78BO477OA000100080010-3
Approved Pelease 2005/02/17: CIA-RDP78B016 A000100080010-3
(SCHEDULE)
25
25X1
without the prior written approval of the Contracting Officer,
The amount of the fee for each phase as set forth above is included solely
for funding purposes, The final fee, unless the task order is terminated upon
completion of Phase I, shall be calculated on the total task order estimated cost
and shall be based upon a determination, to be made by the Contracting Officer,
within thirty (30) days following final acceptance of the work. In the event
only Phase I is completed and there is no approval to proceed with Phase II, the
final fee shall be calculated on the estimated cost for Phase I. The final fee
shall be awarded within the following schedule:
Outstanding 11050
Excellent -------------------------------- 10050
Very Good ------------------------- - 9,5%
Above Average ---------------------------- 8,0%
Average ---------------------------------- 6.50
Below Average ---------------------------- 5050
Base/Minimum ------------------------------ 4000
The evaluation criteria shall consist of the following factors as applied
to the range of the fee effectiveness:
Performance ------------------------------ 75%
Cost ------------------------------------- 15%
Management ------------------------------- 10%
SECURITY:
The reports and equipment being delivered hereunder are UNCLASSIFIED.
25X1
The association of the sponsor with the reports and equipment being procured
NOTICE
3--58 1412a
This material contains information affecting the National Defense of the United
States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and
794, the transmission or revelation of which in any manner to an unauthorized
person is prohibited by law.
C O N F I D E N T I A L
GROUP 1
EXCLUDED FROM AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
X1
X1
Approved For Release 2005/02/17 : CIA-RDP78BO477OA000100080010-3
Approved F felease 2005/02/17 : CIA-RDP78BO44VA000100080010-3
(SCHEDULE)
Is
25X1
hereunder is classified CONFIDENTIAL, This classified information shall be divulged
only on a need-to-know basis and then only to those who have been authorized in
writing by this Government component to have access to classified information.
Correspondence originated by the Contractor and/or data to be submitted hereunder,
the contents of which contain classified information, or refer to the name and/or
address of the Contracting Officer shall be stamped by you with the classification
of CONFIDENTIAL.
NOTICE
This material contains information affecting the National Defense of the United
States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and
794, the transmission or revelation of which in any manner to an unauthorized
person is prohibited by law.
C 0 N F I D E NT I A L
GROUP 1
EXCLUDED FROM TOMATIC DOWNGRADING
ANODE? ASSIFICATION
3- 581412a
X1
Approved For Release 2005/02/17 : CIA-RDP78BO477OA000100080010-3