CONTRACT INSPECTION REPORT PHASE I DESIGN STUDY AND DEMONSTRATION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A000200010037-0
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
July 1, 2004
Sequence Number:
37
Case Number:
Publication Date:
September 21, 1965
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78B04770A000200010037-0.pdf | 84.91 KB |
Body:
Q SECRET 1
Chb 0200010037 UNCLASS I FI ED
A roved F ase 2004/07
.
CONTRACT NO. RIP TASK NO.
CONTRACT INSPECTION REPORT
b
TO:
DATE
91 8 1
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO
If fi
t
t
l
. (
na
, so s
a
e)
ESTIMATED COMPLETION DATE
M
i J=wwy Fuse I
NAME OF CONTRACTOR
TYPE OF COMMODITY OR SERVICE
phwe 11*4180 ut%Wy =d flbF'aM
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
? YE
^ NO
FUNDS ? YES 0 NO IF ANSWER IS "NO" ADVISE REC-
S
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON
K
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD-
PER CENT OF WOR
COMP .ET ED -
DITIONAL FUNDS INVOLVED.
PER CENT OF FUNDS EXPENDED - Phase I
HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD?, 90 YES D NO (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES ? NO
(If yes, indicate items, quantity, and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT YES 0 NO
NOTE:
IF YES. CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
It COST PERFORMANCE O DELIVERY
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
1. ^ OUTSTANDING 3. 1:1 ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. E] UNSATISFACTORY
2. 1:1 EXCELLENT 4. El AVERAGE 6. ^ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
? CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
^ TERMINATE ^ OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE
FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN
RECEIVED. THES# INCLUDE. WHERE APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
_.y S~ r 1
*~
SIGNATURE OF INSPECTOR
DIVISION N GA.
INSPECTOR'S EXTENSION SIGNATUR
04770A000200010037-0
FIRM USE
897 PREVIOUS 0 UNCLASSIFIED Q CONF 2.36)
EDITION
^ SECRET
0
Approved For Release 2004/07/29 : CIA-R
NARRATIVE REPORT
Arco priaeipte was
We yst Guard.
^ UNCLASSIFIED
P78B04770A000200010037-0
INTERIM ^ FINAL
s t 6t ahoagel r
to a VtbAA of ftitW W4:tti0U1Z1g Of
enable the Integmtom %0 take Over. Pftalgtt di
the Operator to zee the enter oto rim*.
74ta ctor will require ` guldewe
be handled: `~oii t`t or c$ p.