CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A000700040088-6
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
October 28, 2004
Sequence Number:
88
Case Number:
Publication Date:
March 24, 1965
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78B04770A000700040088-6.pdf | 91.98 KB |
Body:
^ SECRET C I 1 UNCLASSIFIED
CONTRACT NO.
TASK NO.
CONTRACT INSPECTION REPORT
2
TO:
2h. march 1965
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO. (If final, so state)
6
ESTIMATED COMPLETION DATE
19 June 1966
NAME OF CONTRACTOR
Declass Review by NGA.
TYPE OF R S RVICE
Study on P.I. Performance
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
^
YE
FUNDS K) YES O ND IF ANSWER IS "NO" ADVISE REC-
NO
S
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD-
PER CENT OF WORK COMPLETED -25% of 2-year effort
DITIONAL FUNDS INVOLVED.
100, of special stud
? II
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE , OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD7,
? YES Na (If yes, give details on reverse side.) report Study
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES No
(If yes, indicate items, quantity, and cost on reverse side.)
One Zoo 70 Stereo-
INCENTIVES scope has been lowed.
IS THIS AN INCENTIVE CONTRACT 0 YES NO
NOTE:
IF YES. CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
^ COST ^ PERFORMANCE ^ DELIVERY
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
1 OUTSTANDING 3. ABOVE AVERAGE 5. 1:1 BELOW AVERAGE 7. UNSATISFACTORY
2. M EXCELLENT 4. AVERAGE 6. ^ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
EI CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
^ TERMINATE OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE
FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN
RECEIVED. THESE INCLUDE. WHERE APPLICABLE, THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEM
S
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
23 March 1969
DIVISION
P&DS
SIGNATURE OF APPR(VER
Approved For Release 2004/11/30 : I RDP78B04770A000700040088-6
64 1897 PREVIOUS [] UNCLASSIFIED .[.CONFIDENTIAL [] SECRET (12-36)
EDITION
~t
1
J
5X1
X1
^ SECRET
El CONFIDENTIAL ^ UNCLASSIFIED
Approved For Release 2004/11/30 CIA-R
NARRATIVE REPORT
P78BO477OA000700040088-6
J INTERIM ^ FINAL
!. final, report on special otudy II was received /+ March 1965,
on schedule. The study, which hart been performed on an accelerated,
short-term basis, was well tailored to our immediate problem, was
efficiently managed, smoothly coordinated by the contractors with
the operational people, and of professional caliber.
The report was straightforward and demonstrated a thorough
treatment of the problem in all its parameters -- particularly in
view of the time allowed.
The contractors are currently working at customer facilities to
doubiecheck two test data points by interviewing more subjects. They
have spent a considerable amount of time in-house, having made about
three trips east, each consisting of week-long work sessions,
A~n~nrnvcrl Fnr RpIc. c. 9Md/11/3(1 rIA-PfP7RR(1d770A0007000d00RR-6
^ UNCLASSIFIED+-' ?CONFIDENTIAL _'?r+ ` ^ SECRET