CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A000700040088-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
October 28, 2004
Sequence Number: 
88
Case Number: 
Publication Date: 
March 24, 1965
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A000700040088-6.pdf91.98 KB
Body: 
^ SECRET C I 1 UNCLASSIFIED CONTRACT NO. TASK NO. CONTRACT INSPECTION REPORT 2 TO: 2h. march 1965 ENGINEERING SECTION/CB/PD/OL INSPECTION REPORT NO. (If final, so state) 6 ESTIMATED COMPLETION DATE 19 June 1966 NAME OF CONTRACTOR Declass Review by NGA. TYPE OF R S RVICE Study on P.I. Performance THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED ^ YE FUNDS K) YES O ND IF ANSWER IS "NO" ADVISE REC- NO S OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED -25% of 2-year effort DITIONAL FUNDS INVOLVED. 100, of special stud ? II HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE , OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD7, ? YES Na (If yes, give details on reverse side.) report Study HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES No (If yes, indicate items, quantity, and cost on reverse side.) One Zoo 70 Stereo- INCENTIVES scope has been lowed. IS THIS AN INCENTIVE CONTRACT 0 YES NO NOTE: IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. ^ COST ^ PERFORMANCE ^ DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1 OUTSTANDING 3. ABOVE AVERAGE 5. 1:1 BELOW AVERAGE 7. UNSATISFACTORY 2. M EXCELLENT 4. AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION EI CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE, THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEM S OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 23 March 1969 DIVISION P&DS SIGNATURE OF APPR(VER Approved For Release 2004/11/30 : I RDP78B04770A000700040088-6 64 1897 PREVIOUS [] UNCLASSIFIED .[.CONFIDENTIAL [] SECRET (12-36) EDITION ~t 1 J 5X1 X1 ^ SECRET El CONFIDENTIAL ^ UNCLASSIFIED Approved For Release 2004/11/30 CIA-R NARRATIVE REPORT P78BO477OA000700040088-6 J INTERIM ^ FINAL !. final, report on special otudy II was received /+ March 1965, on schedule. The study, which hart been performed on an accelerated, short-term basis, was well tailored to our immediate problem, was efficiently managed, smoothly coordinated by the contractors with the operational people, and of professional caliber. The report was straightforward and demonstrated a thorough treatment of the problem in all its parameters -- particularly in view of the time allowed. The contractors are currently working at customer facilities to doubiecheck two test data points by interviewing more subjects. They have spent a considerable amount of time in-house, having made about three trips east, each consisting of week-long work sessions, A~n~nrnvcrl Fnr RpIc. c. 9Md/11/3(1 rIA-PfP7RR(1d770A0007000d00RR-6 ^ UNCLASSIFIED+-' ?CONFIDENTIAL _'?r+ ` ^ SECRET