CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A000700040091-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
October 28, 2004
Sequence Number:
91
Case Number:
Publication Date:
October 1, 1964
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78B04770A000700040091-2.pdf | 70.68 KB |
Body:
D
400
1-2
Ml sS &M11/30 : CIA
S~
ftkeye
70A 0700
9
I`
l N
Co
T
y
2
X
TO: D
ATE
1 Oct 64
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO. (If final, so state)
3
ESTIMATED COMPLETION DATE
19 June 1 6
NAME OF CONTRACTOR Declass Review by NGA.
TYPE OF COMMODI
Study on P1 Performance
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
"
"
NO
ADVISE NEC.
NO
FUNDS ? YES n NO IF ANSWER 15
ON
FF
CE
-
YES
.
I
70R ACTION O,P SPONSORING O
OMMENDATION AND
001 of
~- effort
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI-
OLVED
PER CENT OF WORK COMPLETED
.
TIONAL FUNDS INV
HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? 1:1 YES a NO (If yes, give details on reverse side.)
THIS PERIOD? ^ YES ? NO
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING
(If yes, indicate items, quantity, and cost on reverse side.)
OVERALL PERFORMANCE OF CONTRACTOR
1. ^ OUTSTANDING 3. M ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. F1 UNSATISFACTORY
EXCELLENT 4. AVERAGE 6. ^ BARELY ADEQUATE
2
.
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
? CONTINUE AS PROGRAMMED El WITHHOLD PAYMENT PENDING
PERFORMANCE
SATISFACTORY
El TERMINATE F-1 OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
RECEIVED
.
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN
THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING:
DOES NOT
ITEM
RECD
DOES NOT
ITEM
RECD
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
TION AND/OR OTHER
P
SPECIAL TOOLING
RODUC
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
See reverse
SIGNATURE OF INSPECTOR
DIVISION
25
P&DS
1
Approved
-Fems Release -2684M Vae en
SI
_
FOR
s
M 1897
,
We
IOUS
PREY
6.64 EDITION
SECKEI
(When Filled In)
Excluded from automatic
(When Filled In) downgrading and
declassification
1
Approved For R Ike se 2004/11/30 : CIA-RDP78BO477OA0 ,0700040091-2
The week of Sept 7-111
aided PID, who had traveled.to the West Coast, in collecting
ground photography of San Diego sites which had been flown for Project
"DIMVIEW s accelerated study.
They worked at NPIC facilities 15 Sept - 18 Sept gathering information
on sites and imagery with help from PI's not participating in the testing.
They also prepared colljteral and graphic material to accompany the tests.
The week of 21st they returned to their own facilities to draft the
final test version.
In-house testing is planned for the week of September 28th'.
25X1
Approved For Release 2004/11/30 : CIA-RDP78BO477OA000700040091-2