CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A000700040091-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
October 28, 2004
Sequence Number: 
91
Case Number: 
Publication Date: 
October 1, 1964
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A000700040091-2.pdf70.68 KB
Body: 
D 400 1-2 Ml sS &M11/30 : CIA S~ ftkeye 70A 0700 9 I` l N Co T y 2 X TO: D ATE 1 Oct 64 ENGINEERING SECTION/CB/PD/OL INSPECTION REPORT NO. (If final, so state) 3 ESTIMATED COMPLETION DATE 19 June 1 6 NAME OF CONTRACTOR Declass Review by NGA. TYPE OF COMMODI Study on P1 Performance THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED " " NO ADVISE NEC. NO FUNDS ? YES n NO IF ANSWER 15 ON FF CE - YES . I 70R ACTION O,P SPONSORING O OMMENDATION AND 001 of ~- effort REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI- OLVED PER CENT OF WORK COMPLETED . TIONAL FUNDS INV HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? 1:1 YES a NO (If yes, give details on reverse side.) THIS PERIOD? ^ YES ? NO HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING (If yes, indicate items, quantity, and cost on reverse side.) OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 3. M ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. F1 UNSATISFACTORY EXCELLENT 4. AVERAGE 6. ^ BARELY ADEQUATE 2 . IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ? CONTINUE AS PROGRAMMED El WITHHOLD PAYMENT PENDING PERFORMANCE SATISFACTORY El TERMINATE F-1 OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON RECEIVED . CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: DOES NOT ITEM RECD DOES NOT ITEM RECD APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT TION AND/OR OTHER P SPECIAL TOOLING RODUC END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR See reverse SIGNATURE OF INSPECTOR DIVISION 25 P&DS 1 Approved -Fems Release -2684M Vae en SI _ FOR s M 1897 , We IOUS PREY 6.64 EDITION SECKEI (When Filled In) Excluded from automatic (When Filled In) downgrading and declassification 1 Approved For R Ike se 2004/11/30 : CIA-RDP78BO477OA0 ,0700040091-2 The week of Sept 7-111 aided PID, who had traveled.to the West Coast, in collecting ground photography of San Diego sites which had been flown for Project "DIMVIEW s accelerated study. They worked at NPIC facilities 15 Sept - 18 Sept gathering information on sites and imagery with help from PI's not participating in the testing. They also prepared colljteral and graphic material to accompany the tests. The week of 21st they returned to their own facilities to draft the final test version. In-house testing is planned for the week of September 28th'. 25X1 Approved For Release 2004/11/30 : CIA-RDP78BO477OA000700040091-2