(SANITIZED) PRECISION ENLARGER PROTOTYPE (BPE) OPERATIONAL IMPROVEMENTS AND MAINTENANCE

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A001100060014-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 27, 2006
Sequence Number: 
14
Case Number: 
Publication Date: 
August 31, 1968
Content Type: 
PERRPT
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A001100060014-0.pdf57.02 KB
Body: 
Approved For Release 2006/06/21 E I100060014-0 0 FY-69 Quarterly Report No. 1 PAR 249) --dg 68 SUBJECT: recision Enlarger Prototype (BPE) Operational Improvements and Maintenance TASK/PROBLEM 1. Provide photographic enlarger maintenance at the customer's facility for one Precision Enlarger (BPE) and three 10-20-40X Enlargers.* DISCUSSION 2. Contractor personnel visited the customer's facility twice during the report period and while there performed the following maintenance effort on the BPE: a. On 26 and 27 June 1968: (1) Misalignment in the transport system film tracking was corrected. (2) The X- and Y-coordinate counter system was retrofitted. (3) The X-coordinate counter was found to be out of alignment and was corrected. (4) Some of the lights that indicate plus and minus on the Y- counter system were defective and were replaced. (5) Brushes that are activated during the drying cycle to remove excess fluid from the bottom side of the film were aligned. * The wording of this TASK/PROBLEM has been changed from the original PAR to reflect the contractor's understanding, and the customer's concurrence, of the work statement (per contractor's message 0559 dated 8 August 1968 and teleconi on 13 August 1.968). 25x1 SECRET GROUP 1 EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 2006/06/27: CIA-RDP78BO477OA001100060014-0 Approved For Release 2006/06/27: CIA-R P78B04770A001100060014-0 SECRET PAR 249 31 Aug 68 b. In the period from 6 through 9 August 1968: (1) The fluorescent bulb in the viewer box was replaced. (2) The easel platen was removed and the front and back (3) The lamphouse drive assembly was readjusted. (4) The pushbuttons in the sub-control assembly were PLANNED ACTIVITY 3. Perform both the one-month and six-month preventative mainte- nance checks during the week of 9 September 1968. GROUP 1 SECRET EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 2006/06/27: CIA-RDP78BO477OA001100060014-0