TEST PLAN FOR THE (SANITIZED) TWIN STAGE ON-LINE P.I. COMPARATOR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A001200010046-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 6, 2006
Sequence Number: 
46
Case Number: 
Publication Date: 
October 2, 1969
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A001200010046-9.pdf116.98 KB
Body: 
Approved For Release 2006/1 6 :cJt1DP78B04770A001200010046-9 TSSG/ESD-72/69 2 October 1969 MEMORANDUM MR: Chief, Research & Engineering Division, TSSG SUBJECT: Test Plan for the P. I. Comparator Twin Stage On-Line 1. The attached Test Plan is forwarded for your information and planning purposes. 2. Your comments on this test plan will be welcomed. Chief Engineering Support Division, TSSG Attachment: Test Plan Distribution: Orig. - Addressee 1 - NPIC/TSSG/PPS throu h Ch TSSG) -- NPIC/TSSG/RED 1 - NPIC/TSSG/ESD/EPB 1 - NPIC/TSSG 1 - NPIC/IEG 2 - NPIC/TSSG ESD TEB 1 - NPIC/PSG AID AMB 1 - DDI/IAS 1 - DIAAP-9 1 - Army/SP S T c?_r t ~J T 25X1 25X1 Approved For Release 2006/12/06: CIA-RDP78BO477OA001200010046-9 Approved For Release 2006/12/06: CIA-RDP78BO477OA001200010046-9 SECR E Oi;l, ] i&9 INC. TWIN-STAGE ON-LINE P.I. C OMPARATOR TSC The TSC is intended to be a P.I. measuring device. It views and measures in stereo. There is capability for motion while retaining the stereo fusion, if only scale differences are present. The stereo measuring capability is achieved by transmitting the X & Y coordinates of both left and right stages to the on-line computer. The optical system is a modified =Stereo Comparator Head. The film illumination system pro- vides background illumination over the entire 6 X 6 format on each side with high-intensity sources under each objective lens. The TSC is scheduled for delivery to NPIC on or about 27 October 1969. 2. PRE-ACCEPTANCE TESTING On 14 October 1969, representatives from RED & TEB will visit the contractor's facility. The, purpose, of this visit is to check all items required in the contract and specifica- tion prior to shipment. The major deletion will, of necessity, be on-line operation. Any discrepancies noted will be corrected prior to shipment. 3. ACCEPTANCE TESTING Acceptance testing will be performed by ESD/TEB. The TSC Specification #02228 will be used. All requirements in the specification will be checked in a go-no go fashion. All failures will be reported to TSSG/RED for action. This includes an on-line test using the 491 computer. The manuals and drawings will be reviewed for acceptability. This testing should be completed by 7 November. A Memorandum Test Report will be prepared at the end of Acceptance Testing. Approved For Release 2006/12/06: CIA-RDP78BO477OA001200010046-9 Approved For Release 2006/12/9; -:C M P78BO477OA001200010046-9 4 . ENGINE BERING & PERFORMANCE TESTING After the TSC has been accepted, engineering and performance tests will start. As in acceptance testing, all requirements in the Specification will be tested. However, the data will not be go-no go, but will explore the capabilities of the unit in depth. In addition, such factors as usability, r.eliability,main- tainability and safety will be thoroughly checked. This testing should be completed by 19 December 1969. The TSC is scheduled to be delivered to IAS after completion of the ESD/TEB effort. It will be requested that the operator's comments, or a summary of them, be forwarded to TEB after 4 weeks of operation by IAS personnel. 6. TEST & EVALUATION REPORT Upon completion of the testing program described herein an overall report will be produced. This report will contain de- tails of all testing performed and will contain conclusions and recommendations by TEB and IAS, if any. It is planned to dis- tribute this report to all operating components within NPIC, to ERRAND members, and to other qualified components upon request. 7. ASSISTANCE REQUIRED Applied Mathematics Branch/AID/PSG will be requested to pro- gram the ESD computer terminals to accept the 48-word format used by the TSC and to echo the input message for purposes of on-line test. Chief, Test & Eval. Branch, ESD/TSSG 2 Approved For Release 2006/12/06: CIA-RDP78BO477OA001200010046-9