[CONTRACT INSPECTION REPORT FOR EQUIPMENT MODIFICATION FROM (SANITIZED)]
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A001200010084-7
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
June 27, 2006
Sequence Number:
84
Case Number:
Publication Date:
October 19, 1970
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 77.24 KB |
Body:
^
SECRET
24896
x Release
C
12;;
196
TI
e [j UNCLASSIFIED
4gnj
_
1
1
CONTRACT NO.
TASK NO.
CONTRACT INSPE-SON R
EPORT
25X1
TO:
-1-9 October 1970
INSPECTION REPORT NO. (If final, so state)
FINAL
-ESTIMATED COMPLETION DATE
NAME OF CONTRACTOR
25X1
EQUIPMENT MODIFICATION
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
X^ vES ^ NO
FUNDS Q YES ^ NO IF ANSWER IS NO" ADVISE REC-
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE
O
.
N
PER CENT OF WORK COMPLETED - 100
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD-
DITIONAL FUNDS INVOLVED.
PER CENT OF FUNDS EXPENDED 100?
HAS AN INTERIM REPORT. FINAL R
EPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? ^ YES ? NO
(If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY
BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES fJ NO
(If yes, indicate items, quantity,
and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT 0
YES ID NO
NOTE:
IF YES. CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
^ COST ^ AA WARD PERFORMANCE
[] DELIVERY
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
I. El OUTSTANDING 4.
1:1 ABOVE AVERAGE 7. ^ UNSATISFACTORY
2. ^ EXCELLENT S.
Q AVERAGE
3. ^ VERY GOOD 6,
El MINIMUM ACCEPTABLE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
REASONS ON REVERSE SIDE.
RECOMMENDED ACTION
^ CONTINUE AS PROGRAMMED
lJ
^ W
ITHHOLD PAYMENT PENDING
A
STISFACTORY PERFORMANCE
a CLOSE OUT
^ OTHER (Specify)
IF THIS IS A FINAL REPORT RUT
COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE
APPLICABLE, THE FOLLOWING:
ITEM
REC'D
DOES NOT
ITEM
RECD
DOES T
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING -
~~
END ITEMS
x
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
17 q
-
+
*h
-
1Q70
p
n
Pm
P
r
DIVISION
DC SDB RED TSG NPIC
25X1
USE
12-67 1897 FPREVIOUS ^ UNCLASSIFIED
x^
Approved For Release 2006/06/27: CIA-RDP78BO477OA001200010084-7
CONFIDENTIAL E] SECRET
[l SE6off oved For Release 20O6/06/27F 4WI 94770A001200010084-7 ^ UNC LASS I F i ED
NARRATIVE REPORT I ^ INTERIM ? FINAL
The modifications to the Twin-Stage On-Line Comparator have been
completed and installed. Test and evaluation is completed, and the
instrument will be turned over to the operational unit for their use in
the near future. The contractor's performance on this contract was con-
sidered average.
Original contract funding --
I certify that all deliverable items under the contract have been
received.
^UNCLASSIFI 1or Release 2006/06/2 7`UR-V` ?~ SiOAI7 ^SECRET
Approve 70A001200010084-7