CONTRACT INSPECTION REPORT FOR ASPHERIC LENS STUDY

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A001500060049-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 26, 2005
Sequence Number: 
49
Case Number: 
Publication Date: 
November 23, 1966
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A001500060049-8.pdf78.38 KB
Body: 
^ SECRET CONFIDENTIAL ^ UNCLASSIFIED 4199;424 0 C1 dlE?pF j%kM f 1121: CIA I` PA136477OA001 6664M TO: DATE 2_1 11member { CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL 26 ESTIMATED COMPLETION DATE 'Are e NAME OF CONTRACTOR TYPE A is ens Study THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED YES ^ NO FUNDS (YES 0 NO IF ANSWER IS "NO" ADVISE R~C- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, :)N REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED DITIONAL FUNDS INVOLVED. P P ER CENT OF FUNDS EX ENDED HAS AN INTERIM REPORT. FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? ^ YES 119 NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT YES NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. COST O AWARD O PERFORMANCE 0 DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR I ^ OUTSTANDING 4. ^ ABOVE AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT S. ? AVERAGE 3. ^ VERY GOOD 6. ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE- FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN. RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DO T ITEM RECD D T A PLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 22 ''r: ber 1'X-6 (u1 phos conversation) SIGNATURE OF INSPECT OIJGA Review Complete DIVISION ~!r 4 SIGNATURE OF APPROVER I 8` 66 1897 PREVIOUS ^ UNCLASSIFIED ] CONFIDENTIAL ^ SECRET EDITION X1 5X1 ^SECRET 0 CONFIDENTIAL ^ UNCLASSIFIED Approved For Release 2005/11/21 - - "- NARRATIVE REPORT 0 INTERIM [] FINAL :dum re sxdi t. eour * of t4is 4'c has been written anger e p r to cover. Staff persormal are turr rtly bairn caJrv ee poBaib1e optical probers tc be ecosidered "Jr. duri the rezalaad.er of 't#?* contract Approved For Release 2005/11/21 : CIA-RDP78BO477OA001500060049-8 ^ UNCLASSIFIED W CONFIDENTIAL ^ SECRET