CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A001600010076-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 29, 2006
Sequence Number: 
76
Case Number: 
Publication Date: 
September 9, 1966
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A001600010076-2.pdf110.13 KB
Body: 
^ SECRETApproved For Release 2006/0e CONTRACT NO. TASK NO. CONTRACT INS ION REPORT 25 TO: DATE 9 S m 1 CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL 16 ESTIMATED COMPLETION DATE Indeterminate NAME OF CONTRACTOR 25 TYPE OF COMMODITY OR SERVICE y~ & e',,~ ntSi t p & B~ tt Reae..ti Printer & C ntuct Printer THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED YE ? FUNDS 0 YES ? NO IF ANSWER IS "NO" ADVISE REC. S NO OMMENDATION AND/OR ACTION OF SPONSORING OFFICE ON . PER CENT OF WORK COMPLETED - see Its I REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD. DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - lwjdo on reverse side See Item 2 on reverse side. HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? ^ YES [R NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS-PERIOD? ^ Y.ES NO l ~F f (I yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT ? YES 0 NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. COST [3 AWARD IN PERFORMANCE ^ DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1 ^ OUTSTANDING 4. El ABOVE AVERAGE 7. ? UNSATISFACTORY 2. ^ EXCELLENT 5. ^ AVERAGE 3. El VERY GOOD 6. ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ^ CONTINUE AS PROGRAMMED MV WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS. FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR nH{S= Gi:1 ADi . 8 3c 1 abe ..` SIGN INSP 8066 1897 EDITIONS E] UNCLASSIFIED 1J CONFIDENTIAL ^ SECRET (12-36) Annrnvarl Fnr Rplpacp 2006/06/29 CIA-RDP78BO477OA001600010076-2 ^ SECRE ~ooroved For Release 2006/0 :0&U1W8'PB04770A00160001007C UNCLASSIFIED K] INTERIM ^ FINAL Item l and 2, No change since 14 July status report on meter # 2 since stop work order has been in effect. Printer # 3. (GINR.' ) was deUvered to MS on 14 July 1966 for acceptance tests. F1s of 12 August about 12 working days had been lost on testing of printer # 1 due to rupture of the outer air bag b inaccuracy of the film czetering system c mi.s:aliar sent of film preview and punch station. grid h gher (design calls for + 5 microns total error). effect. (b) raw stocks metering still inaccurate (c) preview and punch station s lig nt error 7? acceptance tests; (a) exposure c"trol l X,t utill. 4ve " eystes i.c psttein During the next three weeksI n attempted to correct three ear: jor deficiencies sat a"ee a .' ear' resumption of scheduled for 8*9 September to see what can be done to ustion. The aligr ent problem in still unsolved and a ^ UNCLASSIFIED ? CONFIDENTIAL the sit-* ^ SECRET