LETTER (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A001700060028-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 24, 2005
Sequence Number: 
28
Case Number: 
Publication Date: 
July 1, 1970
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A001700060028-9.pdf133.46 KB
Body: 
Approved F#elease 2005 1 July 1970 5X1 225X1 5X1 N '>ft-0001700060028-9 Declass Review by NGA. Post Office Box 8274 Southwest Post Office Washington, D. C. 20024 I am pleased to submit this monthly progress report on contract for the period 15 May to 15 June 1970. On approximately the 20th of May we received word from the COTR that the leak detector was satisfactory. However, an additional requirement has developed for the viewer drive assembly that it be more stable. Stability criteria were not discussed in the original modification requirement and had not been a part of II proposal for the contract. Nevertheless, it appears that increasing the stability of the drive assembly may not be an insurmountable problem provided we can get some data regarding the magnitude of the vibration problem and an indication of how much of it'can be corrected by increasing the stability of the viewer assembly. Accordingly, on May 25, we requested some measurement data from the COTR to assist us in evaluation of the problem. These data were supplied on June 11th and we proceeded to change the modifi- cation to the viewer assembly to provide the desired stability. We plan to complete the installation of the new viewer assembly modification within the next two weeks. As soon as the Government has completed its evaluation and notified us of acceptance we will begin modification of Units 2, 3, and 4. At this stage it is now impossible to complete modification of all four units by June 30, the current expiration date of the contract. Accordingly, we have initiated a request under separate cover to extend the contract to provide additional time for the modification of the remaining units. VOTICE - THIS CO CU! E T / ;JIATU^'IAL CONTAINS INFOPWAVVI AFFFCTI?IG THE P tTi:3t RL DEFENSE OF THE LP.IFTEU STAT.S ~'l1T ii?t THE I:fEA S1f?G 0F THE ESPICNACE LAV T"ITLY. 11, U.S.C,, SUMS T73 AND 794. ITS TRANS!OiSSICPI OR THE REVELATION OF ITS CONTENTS IN A Y MANNER TO AN UP-411THORIZED PERSON IS PROHIBITED BY LAIN, CROUP 1 25X1 25X1 downgrading and datlassltication 25X1 Approved Fo 71 IOcjI/2A[yIARDP78BO477OAOOl ~L570006 0028-9 Approved F elease Toff 4,A F ~L1P7 04JDA001700060028-9 ~L:+~A 25X1 25X1 '25X1 25X1 1 July 1970 Southwest Post Office Washington, D. C. 20024 I am pleased to submit this monthly progress report on contract for the period 15 April'to 15-May 1970. We received the parts for the viewer drive mechanism and completed the assembly of the precision drive modification. The new assembly and the leak. detector were installed on the 1Fhip Comparator on May 1. The modification is now being evaluated br-th.e COTR and we. are. awaiting Govern- ment acceptance before starting work on modification for Units-2, 3 and 4. n r. t. 5 a^19.~ C"s"TIMNS OF TM- TEE f.S"a A!) 75?. i9 da. ..$c4~Li 6flf?i ITS CV11TEitv;S TO AId UNAUTHORIZED PERSOU IS PRO:i!~ITci) DY LAW. GROUP 1 25X1 25X1 Approved p/f0 :ICIA-RDP78B04770A001700060028-9 r Approved Fo lease 2005/05/20: CIA-RDP78BO47400017 CON =DE N-_1AL 1 July 1970 5X1 25X1 aw W 1 Y'r'e LAW, ctrt u7?AUTHOR3a'#p down,. n aId 25X1 25X1: C-111-70-`)- ice ox Southwest Post Office Washington, D. C. 20024 During this period we made substantial progress on both. phases of the modifi- cation of the Chip Comparator. The GFP lamp cooling assembly and the viewer drive mount assembly were received and used to design the modifications. The leak detector for the lamp cooling system is complete and ready for instal- lation. However, the ball screw drive for the viewer assembly is about two weeks behind schedule because of a delay in receiving parts. During the next period we will install both_modifications_on the.fi.rst Chip Comparator and check out both the. leak.de.tector for the, lamp cooling system and ball screw drive for the viewer ass-emb.ly'. Upon Government acceptance of these modifications we will be ready to proceed with_ the modifications to Units 2, 3 and 4. I am pleased to submit this monthly progress report on contract for the period 15 March to 15 April 1970. cting General Manager / F'AT?.fl L 'CCNTAlI!S Approved For Release 2005/05/2 CONFIDER TM