CONTRACT INSPECTION REPORT MEASUREMENT TECHNIQUES STUDY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A001800010035-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 28, 2016
Document Release Date:
March 8, 2006
Sequence Number:
35
Case Number:
Publication Date:
July 28, 1964
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 47.31 KB |
Body:
C
CONTRACT INSPECTION REPORT
TO:
D AT
ti
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO. (If final, so;,state)
ESTIMATED COMPLETION DATE
NAME OF CONTRACTOR
TYPE OF COMMOD
Measurement Techniques Study
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
^ YES NO
FUNDS YES 0 NO IF ANSWER IS "NO"ii,-ADVISE REC-
p
OMMEND A ION AND/OR ACTION OF SPO
SORING
N
?FICE. ON
{
PER CENT OF WORK COMPLETED
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI-
TIONAL FUNDS INVOLVED.
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? 0 YES (
^
If yes, give details on reverse side.)
~~
,
Monthly Report
Report
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? a YES 1 1 No
L
J
.a
(If yes, indicate items, quantity, and cost on reverse side.)
OVERALL PERFORMANCE OF CONTRACTOR
1. ^ OUTSTANDING 3.
^ ABOVE AVERAGE 5. BELOW AVERAGE 7. [] UNSATISFACTORY
t
2. F1 EXCELLENT 4. `sY AVERAGE 6. BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
CONTINUE AS PROGRAMMED El WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
^ TERMINATE ^ OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR Declassification Review by NGA
SIGNATURE F INSPECT R DIVISION
&M
INSPECTORS
APP loved Fo. Re'ease 200611103
4770A001800010035-5
: CIA-RDP78B0
FORM p(~
I?"7
E
S
GROUP I
PREVIOUS
12 . 3 6
6.64
EDITION (When Filled In) Exclduoowngfadingoa d tic
declassification
SECRET
Adlk (When Filled In)