CONTRACT(Sanitized) MONTHLY PROGRESS REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A001800010054-4
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
10
Document Creation Date:
December 28, 2016
Document Release Date:
March 8, 2006
Sequence Number:
54
Case Number:
Publication Date:
April 8, 1966
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 558.49 KB |
Body:
Approved Release 2006/03/16: CIA-RDP78B0A001800010054-4
CA 66-92
8 April 1966
United States Government
Washington, D. C.
Attention: Contracting Officer
STAT Subject:
Monthly Progress Report
Pursuant to a telephoned request from your Technical Representative, we
are duplicating our thirty-first monthly progress report by enclosing one
reproducible and two copies of it. Also a third copy is enclosed for your
Technical Representative.
Very truly yours,
Contracts Administrator
OMS:ks
Enclosures
cc: Technical Representative w/enclosure
Declassification Review by NGA
Approved For Release 2006/03/16 : CIA-RDP78B04770A001800010054-4
Approved F?ase 2006/03/16 CIA-RDP78B04D1800010054-4 ,
Summary:
1.1 During testing, the linear phasolver driver pattern.,
was found to have deteriorated considerably due to
scratches and pattern flaking. Most of February
was spent repairing the pattern. Over 500 cuts or
flakes were touched'up. This damage had apparently
occurred during the testing portion prior to the
work stoppage in June, 1965. The scratches were
caused by dust, particles between the plates as they
moved on each other. (This dust had also caused
galling of the support feet as has been reported
.(Twenty-second Monthly Progress Report, 13 June 1965).
The pattern flaking is caused by poor vacuum deposition
practices. This is not a problem with our regular
vendor.
We are repeating the Co/Cv tests to determine if the
pattern has been repaired sufficiently well to continue
testing.
.1.2 The. coarse channel electronics bias be 4n fabricated and
i s ; n c h e c one _
2. Work Planned for Next Report Period
2.1 Resume accuracy testing.
22 Complete the coarse encoder holding
2.3 Design the humidity test 'fixture '
THIRTY-FIRST MONTHLY PROGRESS REPORT
MODEL 933 PHASOLVER'SYSTEM
3 MARCH 1966
proved For Release 2006/03/16 : CIA-RDP778:B04770A001800010054-4
STAT Approved For Release 2006/03/16 : CIA-RDP78BO477OA001800010054-4
Approved For Release 2006/03/16 : CIA-RDP78BO477OA001800010054-4
? Approved F&elease 2006/03/16: CIA-RDP78B04*001800010054-4
MODEL 933 PHASOLVER SYSTEM
1 . Summary
The following items were accomplished during this report period:
0
1.1. The logical design to incorporate a coarse channel has
been completed and all parts have been ordered. The
fabrication of the electronic portion is underway.
1.2. The special 3.a-,e block i:alders have been received and
appear to be satisfactory. System accuracy testin'r
has begun.
?
2. Work Planned During Next Report Period
2 . 1 . Complete the coarse channel electronics.
2.2 Continue the system accuracy tes tin-._j .
2.3 Design the humidity test fixture.
Approved For Release 2006/03/16 : CIA-RDP78B04770A001800010054-4
Approved Flease 2006/03/16: CIA-RDP78B04%001800010054-4
TWENTY-NINTH MO'PROGRESS REPORT
MODEL 933 P tAS R SYSTEM
1 January 1966
1. Summary
The following items were accom
period.
1.1 The test fixture has been realigned and.the guage
blocks have been recalibrated in preparation for
the accuracy testing.
1.2 Special holders for aligning the guage blocks., in. the
test fixture have been designed and ordered. These
holders are designed to reduce the handling time of
the guage blocks and should impr#ve the repeatability
and accuracy of the test fixture.
1.3 The design for incorporating the.coarse channel has
started.
2.2 Complete the coarse channel design'and fabricate the
2.1 Commence system accuracy tests on the test fixture.
2. Work Planned During the Next Report Period.
coarse channel electronics.
2.3 Design the humidity test fixture
Approved For Release 2006/03/16 : CIA-RDP78B04770A001800010054-4
DEL 933 PI ASOLVER
STAT
(contract : endment
4ddit on .l t4$.ks, IW4
142 Iovembe
IER 1965
prow
Otte-
1965.
of the r4gortin
No ification of,test
db Ain mare epeatable cat .
800010054-4
cIA
I DECEZ
Lineal Phasole~ . x
Approved F006lease 2006/03/16: CIA-RDP78B047*001800010054-4
?
TWENTY-SEVENTH MONTHLY PROGRESS REPORT
MODEL 933 PHASOLVER SYSTEM
1 NOVEMBER 1965
Linear Phasolver
No work was performed on this Contract during the month of October
due to the lack of funds.
An additional scope of work and a small overrun was negotiated. How-
ever, the formal Contract Amendment has not been received.
Approved For Release 2006/03/16 : CIA-RDP78BO477OA001800010054-4
Approved For?ease 2006/03/16 CIA-RDP78BO477001800010054-4
TWENTY =SIXTH MONTHLY PROGRESS REPORT
MODEL .933 PHASOLVER SYSTEM
1 OCTOBER 1965
Linear Phasolver
No work was performed-on this Contract during the month of
September due to the lack of funds,
Approved :For Release 2006/03/16 ;; CIA-RDP78BO477OA001800010054.-4
Approved For
ease 2006/03/16: CIA-RDP78B0477S01800010054-4
YEXT -FYF M. MO, PQ. T_
MODEL -933 PI A OEV R SYS'l'hM.
3 SEPTE,MBER;19Ei;5
Linear Phasolver
Work stopped on this Program June 16, 1,965 due to a lack of funds.
Estimated cost to complete present scope of work was submitted by" letter
CA 65-69' on 19 Tune 1965 his' e timat :totaled.
Under,date of 2 July- 1965,' by letter CA, 65--73,' a proposal' for completing
the present scope of work, modifying the' pese?n,t Plas;e II Phasolver Test `
Model to incorporate a coarse channel and to- study, theeffects- of humidity:'
on system perforn ,nce was submitted..
The additional funds requirod are
Complete pr"e,sent scope,,
Add Coarse:Char Channel
Conduct Th rnidity,T.ests
Estimated Costs.:
Increase Fee far Tasks 2 and. 3
Total Estimated Funds
No further work is being performed 'on this Program until. additional funds '
are received.
Approved .or Release 2001;/03/46: ,CIA-I 0P78D0477OAU01'800010054-4'.
STAT
STAT'
Approved FoSlease 2006/03/16: CIA-RDP78BO47001800010054-4
Model 933 Phasolver System
13 July 1965
This is the twenty-third monthly progress report describing the
accomplishments during the first half of the report period. Due to
funding difficulties, all effort stopped during the latter half of
this period.
2. Survey of Accomplishments
? 2.1 Balance accuracy at 0.0027` gap was obtained on Pattern III, only.
This measurement was necessitated by the change in gap reported
in the previous monthly progress report.
3. Results of Testing
3.1 Balance accuracy - an absolute accuracy of +0.9 microns was
obtained within a single pole pair, as was predicted in the
previous report.
?
Approved For Release 2006/03/16 : CIA-RDP78BO477OA001800010054-4