Body: 
Approved Release 2006/03/16: CIA-RDP78B0A001800010054-4 CA 66-92 8 April 1966 United States Government Washington, D. C. Attention: Contracting Officer STAT Subject: Monthly Progress Report Pursuant to a telephoned request from your Technical Representative, we are duplicating our thirty-first monthly progress report by enclosing one reproducible and two copies of it. Also a third copy is enclosed for your Technical Representative. Very truly yours, Contracts Administrator OMS:ks Enclosures cc: Technical Representative w/enclosure Declassification Review by NGA Approved For Release 2006/03/16 : CIA-RDP78B04770A001800010054-4 Approved F?ase 2006/03/16 CIA-RDP78B04D1800010054-4 , Summary: 1.1 During testing, the linear phasolver driver pattern., was found to have deteriorated considerably due to scratches and pattern flaking. Most of February was spent repairing the pattern. Over 500 cuts or flakes were touched'up. This damage had apparently occurred during the testing portion prior to the work stoppage in June, 1965. The scratches were caused by dust, particles between the plates as they moved on each other. (This dust had also caused galling of the support feet as has been reported .(Twenty-second Monthly Progress Report, 13 June 1965). The pattern flaking is caused by poor vacuum deposition practices. This is not a problem with our regular vendor. We are repeating the Co/Cv tests to determine if the pattern has been repaired sufficiently well to continue testing. .1.2 The. coarse channel electronics bias be 4n fabricated and i s ; n c h e c one _ 2. Work Planned for Next Report Period 2.1 Resume accuracy testing. 22 Complete the coarse encoder holding 2.3 Design the humidity test 'fixture ' THIRTY-FIRST MONTHLY PROGRESS REPORT MODEL 933 PHASOLVER'SYSTEM 3 MARCH 1966 proved For Release 2006/03/16 : CIA-RDP778:B04770A001800010054-4 STAT Approved For Release 2006/03/16 : CIA-RDP78BO477OA001800010054-4 Approved For Release 2006/03/16 : CIA-RDP78BO477OA001800010054-4 ? Approved F&elease 2006/03/16: CIA-RDP78B04*001800010054-4 MODEL 933 PHASOLVER SYSTEM 1 . Summary The following items were accomplished during this report period: 0 1.1. The logical design to incorporate a coarse channel has been completed and all parts have been ordered. The fabrication of the electronic portion is underway. 1.2. The special 3.a-,e block i:alders have been received and appear to be satisfactory. System accuracy testin'r has begun. ? 2. Work Planned During Next Report Period 2 . 1 . Complete the coarse channel electronics. 2.2 Continue the system accuracy tes tin-._j . 2.3 Design the humidity test fixture. Approved For Release 2006/03/16 : CIA-RDP78B04770A001800010054-4 Approved Flease 2006/03/16: CIA-RDP78B04%001800010054-4 TWENTY-NINTH MO'PROGRESS REPORT MODEL 933 P tAS R SYSTEM 1 January 1966 1. Summary The following items were accom period. 1.1 The test fixture has been realigned and.the guage blocks have been recalibrated in preparation for the accuracy testing. 1.2 Special holders for aligning the guage blocks., in. the test fixture have been designed and ordered. These holders are designed to reduce the handling time of the guage blocks and should impr#ve the repeatability and accuracy of the test fixture. 1.3 The design for incorporating the.coarse channel has started. 2.2 Complete the coarse channel design'and fabricate the 2.1 Commence system accuracy tests on the test fixture. 2. Work Planned During the Next Report Period. coarse channel electronics. 2.3 Design the humidity test fixture Approved For Release 2006/03/16 : CIA-RDP78B04770A001800010054-4 DEL 933 PI ASOLVER STAT (contract : endment 4ddit on .l t4$.ks, IW4 142 Iovembe IER 1965 prow Otte- 1965. of the r4gortin No ification of,test db Ain mare epeatable cat . 800010054-4 cIA I DECEZ Lineal Phasole~ . x Approved F006lease 2006/03/16: CIA-RDP78B047*001800010054-4 ? TWENTY-SEVENTH MONTHLY PROGRESS REPORT MODEL 933 PHASOLVER SYSTEM 1 NOVEMBER 1965 Linear Phasolver No work was performed on this Contract during the month of October due to the lack of funds. An additional scope of work and a small overrun was negotiated. How- ever, the formal Contract Amendment has not been received. Approved For Release 2006/03/16 : CIA-RDP78BO477OA001800010054-4 Approved For?ease 2006/03/16 CIA-RDP78BO477001800010054-4 TWENTY =SIXTH MONTHLY PROGRESS REPORT MODEL .933 PHASOLVER SYSTEM 1 OCTOBER 1965 Linear Phasolver No work was performed-on this Contract during the month of September due to the lack of funds, Approved :For Release 2006/03/16 ;; CIA-RDP78BO477OA001800010054.-4 Approved For ease 2006/03/16: CIA-RDP78B0477S01800010054-4 YEXT -FYF M. MO, PQ. T_ MODEL -933 PI A OEV R SYS'l'hM. 3 SEPTE,MBER;19Ei;5 Linear Phasolver Work stopped on this Program June 16, 1,965 due to a lack of funds. Estimated cost to complete present scope of work was submitted by" letter CA 65-69' on 19 Tune 1965 his' e timat :totaled. Under,date of 2 July- 1965,' by letter CA, 65--73,' a proposal' for completing the present scope of work, modifying the' pese?n,t Plas;e II Phasolver Test ` Model to incorporate a coarse channel and to- study, theeffects- of humidity:' on system perforn ,nce was submitted.. The additional funds requirod are Complete pr"e,sent scope,, Add Coarse:Char Channel Conduct Th rnidity,T.ests Estimated Costs.: Increase Fee far Tasks 2 and. 3 Total Estimated Funds No further work is being performed 'on this Program until. additional funds ' are received. Approved .or Release 2001;/03/46: ,CIA-I 0P78D0477OAU01'800010054-4'. STAT STAT' Approved FoSlease 2006/03/16: CIA-RDP78BO47001800010054-4 Model 933 Phasolver System 13 July 1965 This is the twenty-third monthly progress report describing the accomplishments during the first half of the report period. Due to funding difficulties, all effort stopped during the latter half of this period. 2. Survey of Accomplishments ? 2.1 Balance accuracy at 0.0027` gap was obtained on Pattern III, only. This measurement was necessitated by the change in gap reported in the previous monthly progress report. 3. Results of Testing 3.1 Balance accuracy - an absolute accuracy of +0.9 microns was obtained within a single pole pair, as was predicted in the previous report. ? Approved For Release 2006/03/16 : CIA-RDP78BO477OA001800010054-4