INSPECTION UNDER CONTRACT (Sanitized) REQUISITION NO. 55-8647-67

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A002000030019-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 9, 2002
Sequence Number: 
19
Case Number: 
Publication Date: 
June 1, 1967
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A002000030019-8.pdf66.31 KB
Body: 
c -17 Appr r cjgor F I 2003/06%: F P J477770A00 1%%qW-8 25X CONTRACT INSPECTION ASSIGNMENT RECORD TO: DATE NPIC 6-1-67 FROM: C/CAS CASE/PD OL AMES Buildin 106 g SUBJECT: INSPECTION UNDER -~Ias e7 view b3/ NIMA/DOD CONTRACT NO. - TASK ORDER REQUISITION NO. 55-8647-67 VOUCHER NO. CONTRACTOR ITEM Proj. 1. Your Office is responsible for performing inspection under the subject Contract. A part of this responsibility is the monitoring of the Contractor's performance at his facility to determine if the quality standards of the Contract are being met. It is also requested that you authenticate the need for and the proper use of any Government furnished property made available to the Contractor in accordance with the Contract. 2. To assist in our evaluation of this Contractor's capability and per- formance, send us a report of each inspection visit. Both the interim and the final reports should include information relative to the contractual provisions for delivery and expenditure, as well as your judgment of the Contractor's overall performance. The final report should be in narrative form and should include a statement certifying that all deliverable items listed in the Contract have been received. (Use reverse side of Form 1897 for narrative.) 3. Reports that indicate overall performance as unsatisfactory or barely adequate should support such evaluations with detailed explanations of the specific discrepancies and the corrective action which is being taken. Reports should be submitted at intervals of no more than sixty (60) days so that re- imbursement may be made on the basis of a current evaluation of performance by the Contractor. (Form 1897 may be used for interim reports.) 1-. Current inspection reports are required from you before Contractor's invoices can be paid. 5. Incentive Contracts require close review during performance whenever award or performance incentives are to be applied. The final report must reflect an accurate evaluation of total performance and the level of objectives attained so as to establish the basis for incentive award. 6. Indicate your acceptance of this inspection responsibility by filling in the name of the inspector/monitor and his extension in the space below on one copy of this form and return it to us. INSPECTOR/M EXT ENSION FORM 5-66 1897 Approved For Release 2003/06/11 : SRt PD8B04770A0(M48IAL 112-361 25X 25X 25X 25X