REQUEST TO PROCUREMENT DIVISION FOR SERVICES

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A002200020001-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 27, 2005
Sequence Number: 
1
Case Number: 
Publication Date: 
March 4, 1968
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A002200020001-6.pdf107.79 KB
Body: 
=='(JNCLASSIFIEDApprovo4&Q?/11/21 :~F -B04776 220Q02p(f01-E pecify) NEW , REQUEST TO PROCUREMENT DIVISION FOR SERVICES (other than property or building maintenance and repairs) INSTRUCTIONS: (1) As appropriate, refer to Contract, Task Order, Proposal Numbers and attach any proposals, specifications or justifications. Obtain hereon or attach evidence of R & D approval as required by DDCI Memo of 23 December 1963, ER 63-8811. (2) Obtain Technical f Of icer approval or concurrence as appropriate. (3) Include in the narrative portion amplification of particular security requirements and any delivery or consignee instructions. REQUEST NO. DATE OF REQUEST PROCUREMENT DIV. ASSIGNMENT DATE RECD IN PD. SS-8625-68 4 March 196$ TYPE OF SERVICE REQUESTED REQUESTING OFFICE 211 I4PIC iM 2 RESEARCH/DEV. (1) (2) (3) OTHER-SPECIFY (2) (3) GRANT (1) (2) (3) REPAIR (3) MAINTENANCE (3) $155-4102 - ARE AVAILABLE. CHARG TO FAN MODIFICATION (1) (2) (3) DATE 2 gPn .7 STERILITY CODE 5 MAR (vViJ REPAIR OR MAINTENANCE SERVICE HAS SIGNATURE DATE BEEN SATISFACTORILY COMPLETED MATERIAL LOCATED OR SERVICES TO BE PERFORMED AT N TIVE DESCRIPTION OF SERVICES REQUESTED Mount * DI( ' eetsurin ; System ((PL) on a new Master Series 2 940 MCE Light Table tomplete with vacuum film hold-down, 2 0- R&D arprrovei1 by D/NPIC on l March 1968. Declass Review by NGA. FIB' \\366 RM 2420 0 UN LASSIFIED CONFIDENTIAL 0 SECRET s eci ) -PI ~ ~ p ~/ (6-12-38) Approved Fo lease 2005/ 1/2~ Cib-RDP78BO4770A0022000200&1 hen I1 ad In) 9 R & D CATALOG FORM JDAT :12 February 1968 I . ____________________ PROJEC T TITLE/CODE NAME 2. SHORT P RO ECT DE PT J S CR I ION DIGITIZED MEASURING LIGHT This device will allow a modified light table to , TABLE be connected on-line with the in-house computer. . (Follow-On) (Phase II) 3. CONTRACTOR NAME 14. LOCATION OF CONTRA 5. CLASS O OF CONTRACTOR 6. T YP E OF CO N TR AC T Manufacturer FUNDS S. REQUISITION NO. 9. BUDGET PROJECT NO . FY 19 67 NP-V-5-02058 FY 19 68 10. EFFECTIVE CONTRACT DATE (Begin - end) 11. SECURITY CLASS. AA - Confidential FY 19 69 None T - Unclassified W - Unclassified 12. RESPONSIBLE DIRECTORATE/OFFICE/PROJECT OFFICER TELEPHONE EXTENSION DDI/NPIC/TDS 13. REQUIREMENT/AUTHORITY Operational components require a simplified, accurate measuring system and a quick indexing input station 14. TYPE OF WORK TO BE DONE Design and Fabrication 15. CATEGORIES OF EFFORT MAJOR CATEGORY SUB-CATEGORIES Photogrammetry Viewing Systems Photo interpretation Reporting Techniques 16. END ITEM OR SERVICES FROM THIS CONTRACT/IMPROVEMENT OVER CURRENT SYSTEM. EQUIPMENT. ETC. The results of this contract will be to modify a light table equipped with 5, "Dig" measuring scales and removable reading heads. 17. SUPPORTING OR RELATED CONTRACTS (Agency & Other)/COORDINATION The project is unique and styled to match the NPIC on-line computer system and com- puter programs. There is no situation outside NPIC which would require an input station like this, as a consequence, coordination outside NPIC was deemed unnecess- ary. 18. DESCRIPTION OF INTELLIGENCE REQUIREMENT AND DETAILED TECHNICAL DESCRIPTION OF PROJECT (Continue on addi- tional page if required) This project is the completion of pilot operational unit which will demonstrate the feasibility of a general use, on-line PI mensuration station. This station will allow the photo interpreter to make realitively precise measurements, input the coordinates of targets to the computer, and make plots of target areas, all without cutting up the roll of film or removing the film from his general viewing light table. The project consists of mounting the dig system; solving small interface problems and modifying the light table to serve as a pre-production prototype. 19. APPROVED BY AND DATE OFFICE DEPUTY DIRECTOR DDCI - FORM 1.64 2338 SECRET ? l1.13)