(SANITIZED) - PROGRESS REVIEW MEETING - 17, 18 MAR 65 - PAR 214, RT-12 AND PAR 215, RT-24 PROCESSORS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A002400050062-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
June 29, 2006
Sequence Number:
62
Case Number:
Publication Date:
March 23, 1965
Content Type:
MIN
File:
Attachment | Size |
---|---|
![]() | 72.05 KB |
Body:
Approved FQIRelease 2006/06/29: CIA-R DP78B0A002400050062-4
SECRET
Attachment #7
23 Mar 65
SUBJECT: Contract Progress Review Meeting a 17, 18 Mar 65
PAR 214, RT?-12 and PAR 215, RT-24 Processors
1. Revised preliminary installation engineering sheets (origin-
ally submitted 11 Nov 6L) were given to
Revision date 16 Mar 65.
2. The customer's plan engineers were concerned because they
could not establish a heat balance on the equipment based on total power in-
put versus total radiated heat and. heat removed with exhausted drying air.
It was pointed out tol hat heat is being added to the systems by
hot water used to maintain chemical and wash water temperatures as well as
by electric power and also that heat was removed with wash water discharged
to the sewer.
3. It was also pointed out that air discharged from the dryer
was at approximately 1+5%o RH not at the saturated condition considered 'by
their engineers.
4.1 relayed this information by telephone tol
of their engineering department and asked to confirm the in..-
formation during his conversation. This was done.
shops to see the equipment being assembled. All modules of the RT-24+ were
in a state of complete assembly and. were aligned with the feed stand and
air dryer to convey a general conception of the completed machine. No
completed racks were available for installation; however, the drive
system was operable and was demonstrated..
5. On Thursday, 18 Mar 65, visited the contractor's
alai trard automatI
Iougradina and
? Ctassiflcatioa
SECRET
DDR-Dupe
Approved For Release 2006/06/29: CIA-RDP78BO477OA002400050062-4
Approved F.Release 2006/06/29: CIA-R DP78B0A002400050062-4
SECAE T
Attachment #7
235
6. The pump stand was in position behind the wet section of the
machine and piping was partially completed. The auxiliary drum dryer was
assembled but not completely piped.
7. During the meeting on Wednesday 17 Mar, indicated 25x1
his desire to take pictures of the partially completed equipment. Contrac-
tor provide a set of Polaroid pictures of the RT-24+ Processor.
8. After a thorough examination of the equipment, re- 25X1
marked that he had no complaints other than the non-safelight indicator lamps.
9. informed the contractor that the following GSA per- 25x1
sonnel would be involved with the RT-12 and. RT-24 processor installations:
Buteded trem eatamatlzl
SECRET
Approved For Release 2006/06/29: CIA-RDP78B04770A002400050062-4