LETTER TO CHUCK FROM HANK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A002500070013-5
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
May 12, 2005
Sequence Number:
13
Case Number:
Publication Date:
January 25, 1962
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 198.45 KB |
Body:
NPIC ROUTING SLIP
Appro ed For Release 2005/06 RDP78BO477OA002500070013-
/ f // 2
FROM DATE (-l -s /
CD o~
.h'7
R
H/RS
H/PD
I/TISD
e
~7-Z,~S
XEC/DIR
L~r
Declass Review by NGA.
Approved For Release 2005/06/06 : CIA-RDP78B04770A002500070013-
A
A
Approved For Release 2005/06/06 : CIA-RDP78B04770 25000700 -
AWL?I
23 Jautia
0
re z4ft8 ulA
tug comize Vook" *a fox" cjuecn
may 1*ve: ace s to
t
Set such a
.=I Solutes lab room* Can u
y
,~,
a date tbe ~t Vor?
4. :
qq~
tbay vere sw1led last
OrIg& 1-CL
1 - Jc
2-Hu
Approved For Release 2005/06/06 : CIA-RDP78B04770A002500070013-5
severa.I of us (fib a
T)umt vithyM.. + ,3? D. and T(A Cr
1* the xbole tb'L3 g. wiU fiVOU i this
ST
ST
,
Approved For Release 2005/06/06 : CIA-RDP78B04770A002500070013-5
D /NPIC-293-62
25 January 1962
tined 23 Ja ary x.962 to a& if he could
delay re? ? , o nshinon [rc n 29 J=uc y to 5 February. It
sew is reorcanizin the Los ;ejes office and wants
hJz there an a tra week. I a eec1 to the delay.
2. Chuck ado said the Technical Directives covers ur installation
oi' the P otoChes ice1 Solutions system and photographic material b ing
had not been received in LA and that I 'ind out what happened to tem.
ST
ST
Approved For Release 2005/06/06 : CIA-RDP78BO477OA002500070013-5
Approved For Release 2005/06/06 CIA-RDP78BO477 002500070013-5
UD/NPic-2w.62
25 January
- V.=Off (24 $cn ary 1962)
called to say that based on his investigation
the "spectrophotometer which 0 now has and. which we planned S
to inatsU In the Chemical Analysis Lab was in his opinion not suitable.
According, to Churl, it is a precision research instrument
whereas we should have a production model.. The 0 instrument S
which Chuck recommends is a table top model and easy to operate whereas
instrument is desk size ad requires a highly skilled operator.
2. :ether, space 'tom been allocated in nev shop for
theE::~trrmient and he believes 111 need it in the not too
distant future. (NOM: Subsequent to s telephone conversation,
~concurred with Chuck' a recom tendations and amend nt 1 to the
specif ieations to the PhotoCliemical Lab was revised eliminating a
paragraph which deleted the requirement for a spectrophotc ueter from
the specifications, i.e., the PhctoChemical Solutions Lab specifications
call for the contractor to purchase _ a _ a spectrophotometer for the
3. Chuck mentioned: that he had seen
and. that he was ready and waiting to j~ o. a reported t at is
worried: About the deadline date and that he wants a contract or letter
of intent as quickly as possible. Opointed out to Chuck that the
original proposal was based on an eight month schedule and since the time
was being reduced to 6 months additional negotiations would almost
certainly be necessary to cover the overtime which might be involved.