PROTOTYPE DEVELOPMENT WIDE PRINT STRAIGHTNER
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A002500090015-1
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
May 11, 2005
Sequence Number:
15
Case Number:
Publication Date:
July 12, 1968
Content Type:
CONT
File:
Attachment | Size |
---|---|
![]() | 95.21 KB |
Body:
2'5X1
SECRET A
CONTRACT NO.
TASK NO.
CONTRACT INSPECTION REPORT'
TO'
DATE
12 July 1968
INSPECTION REPORT NO. (If final, so state)
9
ESTIMATED COMPLETION DATE
September 1968
NAME OF CONTRACTOR
Declass Review by NGA.
Prototype Development Wide Print Straightner
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS 0 YES 0.0 IF ANSWER IS "NO" ADVISE REC-
? YES a N
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
0~
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD-
PER CENT OF WORK COMPLETED . 95/a
DITIONAL FUNDS INVOLVED.
Fixed Price
PER CENT OF FUNDS EXPENDED.
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? 11 YES ? NO (If yes, give details on reverse side.)
~7--f
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED. TO CONTRACTOR DURING THIS PERIOD? YES XL 1 NO
LJ
(If yes, indicate items, quantity, and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT YES 0 NO
NOTE:
IF YES. CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
COST O AWARD PERFORMANCE 0 DELIVERY
"'
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
11GG~JJJ
F E E
OVERALL PERFORMANCE OF CONTRACTOR
1. ? OUTSTANDING 4. ABOVE AVERAGE 7. UNSATISFACTORY
2. EXCELLENT 5. ? AVERAGE
3. VERY GOOD 6. MINIMUM ACCEPTABLE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
REASONS ON REVERSE SIDE.
RECOMMENDED ACTION
FXI WITHHOLD PAYMENT PENDING
CONTINUE AS PROGRAMMED
SATISFACTORY PERFORMANCE
CLOSE OUT ? OTHER (Specify)
IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE
APPLICABLE, THE FOLLOWING:
ITEM
RE C D
DOES NOT
ITEM
RECD
DOES NOT
' APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
11 July 1968
SIGNATURE OF INSPECTOR DIVISION
USE
'
1 2- 67 1897 E D I T" grov~FeNyD-Iggtp X5/06/06 : CM-f~ 7 jj A0025000n0lf C
ET
W
NC LASS IF IED
5X1
^SECRET ? CONFIDENTIAL 0 UNCLASSIFIED
NARK VE REPORT ^ INTERIM FINAL
The Contractor has been modifying the Wide-Print Straightener since
January 1968 in an effort to make it perform satisfactorily. They have
been putting a minimum of effort into this work and have thus taken an
inordinate amount of time to complete a relatively simple task. I have
requested NPIC's Contracting Officer, to inform in writing that
they have 60 days to complete their contractual requirements g
cancellation by default. Subsequently, I have been called by
and informed that the equipment will be in operation by 22 July. A trip
is planned for that date. However, the request for the Contracting Officer's
letter will not be cancelled as has not fulfilled past promises
on equipment completion.
UNCL"*VrbRkd For Release 2005/Offi(P, OEUADRIDPrli~160477OA002500090015-1
2 X1
2 Xl
^ SECRET