PROTOTYPE DEVELOPMENT WIDE PRINT STRAIGHTENER

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A002500090021-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 11, 2005
Sequence Number: 
21
Case Number: 
Publication Date: 
October 18, 1967
Content Type: 
CONT
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A002500090021-4.pdf120.62 KB
Body: 
^ SECRET E007 I CONFIDENTIAL ^ UNCLASSIFIED Approved F elease 2005/06/06: CIA CONTRACT IN CTION REPORT R0~BO47 00250009G0214 2 TO: IS Qatobor 1967 CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL 4 ESTIMATED COMPLETION DATE JO o cr W67 NAME OF CONTRACTOR Declass Review by NGA. TY otot _ - OVe1 t wi Print str er THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS 0) YES 0 NO IF ANSWER IS "NO" ADVISE REC- ^ YES a No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED - 100% DITIONAL FUNDS INVOLVED. PER TENT OF FUNDS EXPENDED - 100% HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? [M YES ^ NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 1.7 YES O NO NOTE: IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. ^ COST a AWARD PERFORMANCE DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 4. ^ ABOVE AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 5? a AVERAGE 3. ^ VERY GOOD 6. ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION M"I I Al CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR SIGNATURE OF INSPECTOR DIVISION FOR66 M 1897 E D , I [a, T I p O N E9/ed "U ?P9P606/06 : CIAff ~3&PFWWPtL02500090~*CRET (12-36 ^ SECRET - CONFIDENTIAL ^ Rp7Tuved Fur ReIect 2003/00/00 - - -- - NARRATIVE REPORT ? INTERIM 0 FINAL lento d the last luspottion o rt that the C004 tray egue1tly wider prints (30 1/411 p ' doliverfW The contractor has since w1de the S'cvc l publ bow d t a# hours. Uh" the belt s Itostt ~v t power tl run. is p drive gyste ` o to mu a . The cantrac or $W'W this belt 17 &4y 1967. uip nt for several tl 1eo and roguir I the belt was thl~ #0 aid this has apparently solved too p ulcc.. The contractor also Amdshod a to l the prints to fed Into the str tene>r with less difficulty. Pe ' o anco Staff lnforw4 s that t h e y plan t o pmNom acceptance test of the equ peut wit in the Both of October. ~~_~__ _ 200510WOC _ /CIA r+r~n~onn~ nnn?nnnnnnn1 A U UNCLASSI'F IED ^ SECRET