INSTALLATION ENGINEERING DATA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A002500100021-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
November 30, 2006
Sequence Number:
21
Case Number:
Publication Date:
July 14, 1967
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 136.6 KB |
Body:
Approved For Release 2006/11/30: CIA-RDP78BO477OA002500100021-2
Specif' ion No. DB-1001
INSTALLATION ENGINEERING DATA
(See Remarks at end of form)
Final data Xx /
I. INSTRUMENT
A. Name of instrument: Super-Wide Print Straightener
B. Manufacturer:
C. Contract number:
D. Delivery date: Tentative: 2 June 1967 Final:
II. PHYSICAL. FEATURES
A. Sub-assemblies:
N/A 1. Number of Pub-assemblies:
2. Largest sub-assembly: Weight ibs; H x W x " D
3. Heaviest sub-assembly:, Weight lbs; H x " W x " D
25X1
B. Assembled instrument:
1. Number of major components: 1
2. Largest component: Weight 300 lbs; 39 H x 34-1/2 W x 90 " D
3. Heaviest component: Weight ibs; " H x It W x It D
4. Total floor space required after ./ se mly, including maintenance access
space. 5 Ft. 4 In. High x 4 Ft. n. Wide x 7 Ft. 6 In. Deep.
5. Total weight of assembled instrument: 300 lbs.
C. Type of base of mount: Flat : 3-point suspension ; 4-point suspension X
D. Does the instrument have built-in mobility? Yes X No
E. Is the instrument particularly sensitive to vibration? Yes No X
Will the instrument generate vibration? Yes X No
F. Are any special or unusual tools or fixtures necessary or adviseable for
the installation of the maintenance of this instrument? Yes No Xi,.
If "Yes," please describe:
III. UTILITIES
A. Electrical: AC DC
1. Voltage 110 Volts T Volts Volts
2. Current lU/I Amps/phase Amps
3. Frequency 6n _cps
1.. Nr. of phases 1 Ph
5. Nr. of wires 3
6. Power required 1800 Watts Watts
7. Power factor (Leading) (Lagging)
8. Type of outlet: Two prong ; three prong X ; Twist lock Perm._
9. Type of ground: Building conduit X ; Direct earth ground
10. Should the instrument be shielded, either from external electromagnetic
signals or to prevent interference with other equipment? Yes No X
If "Yes," to what extent?
-6-
Enclosure 2
Revised 1/66
Approved For Release 2006/11/30: CIA-RDP78BO477OA002500100021-2
0 N/A
B. Air conditioning:
1. Desired environment: Room air temperature of OF / OF and relative
humidity of j %.
2. Input Air: Is a direct connection necessary? Yes No
Adviseable? Yes No ; If "Yes," what is the connector type and
size? Recommended input air temperture OF ~ OF.
Relative humidity % / f. If input air must be filtered, what is
the maximum particle size in microns? What particle count?
cu. ft.
3. Output Air: Is a direct connection to the return air duct necessary?
Yes No Adviseable? Yes No Connector type and size?
Output air temperature + F / OF. Relative
humidity p %. Output heat BTU/19. Flow of CFM. Is
output air toxic? Yes No ; Noxious? Yes No
C. Plumbing:
1. Is water required? Yes No ; Pressure PSIG, flow GPM.
2. Type of water re uired:
Tap _ OF ?F Deionized OF OF
Tempered of OF Filtered OF OF
If f-iltered, give maximum permissible particle size in microns and the
maximum permissible count. microns particles/cu. ft.
3. Pipe required:
Galvanized Copper Size
Stainless Steel Plastic Type of connector
4+. Floor drain:
Diameter of drain Galvanized drain?
Plastic drain? Glass drain?
5. Are any chemical solutions used in the device? Yes No If
"Yes," state the nature of the solution(s), permissible temperature
range, flow rate in appropriate units and the filtration necessary for
each solution
6. Size of pipes and connectors
D. Compressed air:
Is compressed air required? Yes No Water free? Oil Free?
Type and size of connector? . Pressure PSIG. Flow in CFM
Maximum , minimum , average
E. Vacuum:
Is vacuum required? Yes No Pressure PSIA or (inches of
water) (millimeters of mercure). Displacement in CFM, maximum
minimum , average Type and Size of connectors
F. Peripheral Devices:
Will the instrument be connected to any peripheral devices such as a
computer or data input or data output device? Yes No If "Yes,"
give, in detail, the nature of the connection to the peripheral device such
as coaxial cable, multiple wire connector, etc.
IV. REMARKS
A. Use additional sheets if more space is required for environmental conditions
or utilities not mentioned above.
B. Submit three typed copies of the completed form to the Technical
Representative.
-7-
Enclosure 2
Approved For Release 2006/11/30: CIA-RDP78B04770A002500100021-2
0
C. Attach three copies of a dimensioned outline drawing of each major component
and of the completed assembly. Include the estimated weight of each major
component and of the completed assembly. Indicate, on the outline drawing
of the completed assembly, the space required for access to the instrument
for maintenance.
D. If a question does not apply to the instrument, insert "N/A" (Not Applicable)
in the appropriate blank space.
Project E c in r
(Position or job title
-8-
Enclosure 2