NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

STATUS OF(Sanitized) SITE PREPARATION, REPORT #1

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000100010060-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 8, 2003
Sequence Number: 
60
Case Number: 
Publication Date: 
December 15, 1969
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000100010060-2.pdf111.5 KB
Body: 
Approved For Release 2003/12/04: CIA-RDP78BO5171A000100010060-2 16 l:)ecenber 1.969 25X1 ML'MORANDU`-I TO: Chief, Logistics Branch, SSD/TSSG/NPIC SUBJECT : Status of Site Preparation, Report #1 1. This report is the first of bi-monthly re orts covering 25X1 the status of the 0 Site Preparation in 2. (a) As of this writing, the excavation of the pit is approximately 80% completed. (b) The south, west, and north foundation walls have been poured. (c) Redesigned drawings governing the depth, and location of the foundation for the [engine Faaas given the contractors December 16. is redesign resulted from information learned when the footings of the columns at this location were uncovered. (d) Approximately 90 ton of washed ravel has been ordered to be delivered to the t Site. This gravel will be used to fill the excavation to a level 3 feet below the present'-loor slab. (e) Electrical demolition in this area is currently under- way. (f) Mosier vault doors orclerec7. as GET are expected to arrive on the site the 3rd weelc of January 1970. Declass Review by NIMA/DOD Approved For Release 2003/12/04: G' A't " OUB05171A000100010060-2 :..-~..... . 25X1 25X1 25X1 Approved For Release 2003112/04: CIA-RDP78BO5171A000100010060-2 StJ13JJ~C{l': Status of I ite 1'reparat.i.on, Report 161 (g) Other material scheduled- to be delivered cluring January an air filters, motors, compressors, 3. The b7.ack box which is Covcrnment i -ni_i_shed Equipment the ~ 1thc'r r tests durin l" f f llk t ? to o shippec be ready be oa ii successful testing, the lla Plant in Californiatfor further testing with the. instrument p e zration to definitely 4. It is too early in the c p however, the target state that the work program is on n schedule, "mains 15 April, 1970. r date for completion Approved For Release 2003/12/04: CIA-RDP78BO5171A000100010060-2 25X1 25X1 C ENTER ROU'(IUIG SLIP (-Appr-a I FROM REMANKS ILLEGIB 25X1 CH/SSD/TSSG PERSONNEL LOGISTICS RECORDS MG SECURITY FINANCE 25X1