STATUS OF(Sanitized) SITE PREPARATION, REPORT #1
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000100010060-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
September 8, 2003
Sequence Number:
60
Case Number:
Publication Date:
December 15, 1969
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 111.5 KB |
Body:
Approved For Release 2003/12/04: CIA-RDP78BO5171A000100010060-2
16 l:)ecenber 1.969
25X1
ML'MORANDU`-I TO: Chief, Logistics Branch, SSD/TSSG/NPIC
SUBJECT : Status of
Site Preparation, Report #1
1. This report is the first of bi-monthly re orts covering
25X1 the status of the 0 Site Preparation in
2. (a) As of this writing, the excavation of the pit is
approximately 80% completed.
(b) The south, west, and north foundation walls have
been poured.
(c) Redesigned drawings governing the depth, and location
of the foundation for the [engine Faaas given the
contractors December 16. is redesign resulted
from information learned when the footings of the
columns at this location were uncovered.
(d) Approximately 90 ton of washed ravel has been
ordered to be delivered to the t Site. This gravel
will be used to fill the excavation to a level 3 feet
below the present'-loor slab.
(e) Electrical demolition in this area is currently under-
way.
(f) Mosier vault doors orclerec7. as GET are expected to
arrive on the site the 3rd weelc of January 1970.
Declass Review by
NIMA/DOD
Approved For Release 2003/12/04: G' A't " OUB05171A000100010060-2 :..-~..... .
25X1
25X1
25X1
Approved For Release 2003112/04: CIA-RDP78BO5171A000100010060-2
StJ13JJ~C{l': Status of I ite 1'reparat.i.on, Report 161
(g) Other material scheduled- to be delivered cluring
January an air filters, motors, compressors,
3. The b7.ack box which is Covcrnment i -ni_i_shed Equipment
the ~
1thc'r
r tests durin
l"
f
f
llk
t
?
to
o
shippec
be ready
be
oa
ii
successful testing, the lla
Plant in Californiatfor further testing with the.
instrument
p e zration to definitely
4. It is too early in the c p however, the target
state that the work program is on n schedule,
"mains 15 April, 1970.
r
date for completion
Approved For Release 2003/12/04: CIA-RDP78BO5171A000100010060-2
25X1
25X1
C ENTER ROU'(IUIG SLIP
(-Appr-a
I FROM
REMANKS
ILLEGIB
25X1
CH/SSD/TSSG
PERSONNEL
LOGISTICS
RECORDS MG
SECURITY
FINANCE
25X1